Developer ToolsFree referencePDF, Excel, Word exportInfor SyteLineAll Infor SyteLine (CloudSuite Industrial) tools

SyteLine Mongoose API Options Reference

This reference compares every way to read and write Infor SyteLine 9, 10 and CSI data through Mongoose, from IDO REST to SOAP, the .NET client, ION API, event actions and BODs. It shows endpoints, authentication, operations and the traps for each so you can pick the right one before writing code.

Download:
InterfaceEndpoint or classAuth methodOperationsBest forGotchasVersion notes
IDO REST v2 load
GET /IDORequestService/ido/load/{ido}
Authorization header: Mongoose token from GET /IDORequestService/ido/token/{config}, or OAuth 2.0 bearer through ION API
Query with properties, filter, orderby, recordcap, distinct, clm, clmparam, loadtype (FIRST, NEXT, PREV, LAST), bookmark, pqc, readonly
Reading SyteLine data from scripts, BI and middleware
recordcap -1 returns 200 rows and 0 returns all; filter allows only GETDATE() and DATEADD(), others raise IllegalFilterException; readonly=True drops _ItemId
Current Mongoose REST API; confirm it is enabled on older 9.x installs
IDO REST v2 update and invoke
POST /ido/update/{ido} and POST /ido/invoke/{ido}?method=
Same as load
Insert, update and delete rows; call IDO methods
Controlled write-back from an integration
Updates and deletes need the _ItemId from a load that was not readonly
Same service as load
IDO REST v1
Endpoint set: LoadCollection, AddItem(s), UpdateItem(s), DeleteItem(s), InvokeMethod, GetSecurityToken, GetConfigurations, FireAESEvent, IDOInfo, UploadDocumentObject
Token from GetSecurityToken
Load, add, update, delete, invoke, fire an AES event, document upload and download
Existing integrations built on v1
Different URL scheme from v2; confirm the base path on your server before coding
Older interface kept for compatibility
SOAP IDO web service
CreateSessionToken(strUserId, strPswd, strConfig); LoadDataSet(strSessionToken, strIDOName, strPropertyList, strFilter, strOrderBy, strPostQueryMethod, iRecordCap); SaveDataSet; CallMethod
Session token from CreateSessionToken
Load as DataSet, save DataSet, call methods
.NET applications that already consume SOAP
LoadDataSet returns a System.Data.DataSet; keep the token and reuse it
Long-standing interface on on-prem installs
Mongoose .NET client library
new Client(requestServiceURL, IDOProtocol.Http); LoadCollectionRequestData; client.LoadCollection(request); UpdateCollection; Invoke
Session opened through the client
Load, update, invoke with typed request and response objects
C# services and tools inside the network
Set RecordCap explicitly; wrap Client in using to close it
Ships with Mongoose; match the DLL version to the server
ION API gateway
IDO REST v2 through the ION API URL from the .ionapi file
OAuth 2.0 using the .ionapi credentials file
Same as IDO REST v2
Cloud-ready or Infor OS based integrations
Header X-Infor-MongooseConfig is required to name the configuration
Requires Infor OS / ION API in your landscape
IDO extension class
this.Context.Commands.LoadCollection inside an IDO extension class
Runs in the caller's session
Load, update and invoke other IDOs from server code
Logic that must run for every client, including APIs
Code is deployed with the IDO; keep it in source control for upgrades
Mongoose IDO development
Event system IDO requests
Execute IDO Request and Dispatch IDO Request event actions
Event handler context
Run IDO request XML locally or on another site
No-code automation triggered by events
Parse Dispatch results with Transform XML
Application event system
ION BODs
Replication Document Outbox and inbound BOD processing
ION connection point
Publish and receive Sync, Process and Acknowledge BODs
Event-driven sync with other Infor or third-party apps
Outbound documents sit in the outbox until ION collects them
Requires ION

For building actual requests use the existing SyteLine IDO REST request generator. Endpoint and parameter names follow the Mongoose integration guide; base paths and enabled services vary by install, so test against your own IDORequestService before coding.

Pick the right interface for your integration

Describe what you need to read or write in SyteLine and from where, and we will recommend the interface, authentication and paging approach for your install.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to choose

Start with the job. For reading data on demand from a script, report or middleware, use IDO REST v2 load, directly on the network or through the ION API if your landscape uses Infor OS. For writes, use v2 update or invoke so SyteLine's IDO logic and event handlers run, never direct SQL. For logic that must run whenever data changes, whoever changes it, use the event system or an IDO extension class. For keeping another application in step with every change, use BODs through ION. SOAP and REST v1 are for maintaining integrations that already use them.

  • Read on demand: IDO REST v2 load
  • Write back: v2 update or invoke, through IDO logic
  • React to change inside SyteLine: event system or extension class
  • Keep other systems in sync: BODs through ION

Worked example: a v2 load call

To read open customer order lines, call GET /IDORequestService/ido/load/SLCoitems with properties=CoNum,CoLine,Item,QtyOrdered,DueDate, a filter on status, orderby=DueDate and recordcap=0 only if you are sure the result is small; otherwise page with loadtype=NEXT and the bookmark from the previous response. Send the token in the Authorization header. Through the ION API, use the OAuth bearer token and add X-Infor-MongooseConfig with the configuration name. Add readonly=True for pure reads, but leave it off if you will update the rows, since it drops _ItemId.

Gotchas that cost a day

recordcap has special values: -1 returns 200 rows and 0 returns all, so an omitted or default cap silently truncates results. The REST filter only accepts GETDATE() and DATEADD() as functions; any other SQL function, GROUP BY, HAVING or a sub-query raises IllegalFilterException, so push complex logic into a custom load method (clm and clmparam) instead. Through ION API, a missing X-Infor-MongooseConfig header is the usual cause of authentication that looks right but fails. In the .NET client, set RecordCap on LoadCollectionRequestData rather than relying on defaults.

Version differences

The v2 REST endpoints are the current interface in the Mongoose integration guide. REST v1 exposes a different set of named endpoints such as LoadCollection, AddItems and FireAESEvent, and its base path differs by install, so confirm it on your server. The SOAP IDO web service has been on on-prem installs for many releases and still suits .NET code that expects DataSets. ION API access needs Infor OS components that many on-prem SyteLine 9 sites do not run; direct REST inside the network is the usual on-prem pattern.

Frequently Asked Questions

Does Infor Mongoose have a REST API?

Yes. The IDO REST API in the IDORequestService supports loading collections, updating rows and invoking methods, with token or OAuth 2.0 authentication. SyteLine and CSI use it for integrations, and it can also be reached through the ION API gateway. An older v1 REST interface and a SOAP web service are also available.

What is an IDO in SyteLine?

An IDO (Intelligent Data Object) is the Mongoose business object layer between forms or APIs and the database. Each IDO, such as SLCos for customer orders or SLItems for items, defines properties, methods and save logic. Reading and writing through IDOs keeps SyteLine validation and event handlers in play, unlike direct SQL.

Why does my REST load return only 200 rows?

A recordcap of -1 means 200 records. Set recordcap to the number you want, or 0 for all records, and for large sets page with loadtype NEXT and the bookmark from the previous response so you do not load an entire table in one call.

Can I use SQL functions in the REST filter?

Only GETDATE() and DATEADD() are allowed. Other functions, aggregates, GROUP BY, HAVING and sub-queries are blocked and raise an IllegalFilterException. Use a custom load method through the clm and clmparam parameters when you need more complex selection logic.

If you want people to query SyteLine through these APIs in plain English, read-only and on your own servers, we can build that layer for you.

Get Infor SyteLine alerts

Support and maintenance deadlines, release changes that affect Infor SyteLine sites, and new free Infor SyteLine tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor SyteLine: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

Software