Developer ToolsFree referencePDF, Excel, Word exportInfor SyteLineAll Infor SyteLine (CloudSuite Industrial) tools

SyteLine Mongoose Framework Events Reference

This reference lists the Mongoose framework events that application event handlers can subscribe to in Infor SyteLine 9, 10 and CSI on-prem. For each event you get when it fires, the parameters it passes, a typical SyteLine use and the gotcha that usually catches people out.

Download:
EventGroupFires whenParameters passedTypical SyteLine useGotcha
IdoOnInvoke
IDO
Before an IDO method is invoked
Method name, parameter count, parameter values
Check or log calls to a specific method on an SL IDO before it runs
Read the method with METHOD() and values with METHODPARM(n); failing the handler stops the call
IdoPostInvoke
IDO
After an IDO method is invoked
Method name, parameter count, parameter values
Notify or log after a method such as a posting routine finishes
Post events cannot undo the method; use the On event to block
IdoOnItemInsert
IDO
Before an IDO item is inserted into a collection
The row being inserted
Validate a new SLCos or SLItems row, or default a value with Set Values
On events can veto the insert by failing the handler; P/PROPERTY works here
IdoPostItemInsert
IDO
After an IDO item is inserted
The inserted row
Notify a buyer when a new PO line (SLPoitems) is created
Runs after the insert; use it for follow-up actions, not validation
IdoOnItemUpdate
IDO
Before an IDO item is updated
The row plus modified flags
Require approval before CreditHold changes on SLCustomers
Use PROPERTYMODIFIED("CreditHold") so the handler only acts when that property changed
IdoPostItemUpdate
IDO
After an IDO item is updated
The updated row plus modified flags
Tell planning when a due date changes on SLCoitems
Fires per row; a bulk update of many rows fires it many times
IdoOnItemDelete
IDO
Before an IDO item is deleted
The row
Block deletion of SLItems rows unless the user is in an admin group, with a Fail action
Only properties present on the delete request are available; check with PROPERTYAVAILABLE
IdoPostItemDelete
IDO
After an IDO item is deleted
The deleted row
Write an audit row to a user-defined table after a delete
The row is gone from the database; copy what you need from the event
IdoOnLoadCollection
IDO
Before an IDO collection loads
Load flags, property names, post-query actions
Audit who queries a sensitive IDO, read the filter with FILTERSTRING()
Use P2/PROPERTY2 and FP2 here, not P; RECORDCAP() gives the cap for the query
IdoPostLoadCollection
IDO
After an IDO collection loads
The result set
Notify an admin when a load returns more than 1,000 rows
ROWS() counts rows only on this event; it returns 0 elsewhere
IdoOnUpdateCollection
IDO
Before an IDO collection update runs
Custom insert, update and delete specifications
Inspect or override custom save methods on an update request
CUSTOMINSERT, CUSTOMUPDATE and CUSTOMDELETE functions read the specifications
IdoPostUpdateCollection
IDO
After all IDO collection updates finish
None
Trigger one follow-up action per save instead of per row
No row data is passed; load what you need
IdoOnPersistFailed
IDO
When a create, update or delete throws an exception
DBErrorDataKeys count, DBErrorDataKeyList
Alert support when saves fail on an integration IDO
Fires on failure only; it does not replace normal error handling in the caller
IdoPostRequestQuarantined
IDO
When an IDO request is checked against the exclusion list
IDO, request type, method name
Log or alert on requests caught by request quarantine
Only relevant where request exclusion is configured
SessionOnLogin
Session
When a new session is requested
User name
Log logins for selected users or configurations
USERNAME() and CONFIGNAME() are meant for session events
SessionOnLoginFailed
Session
When a login attempt fails
Application name, configuration, user, originating computer name, failure details
Notify the administrator after failed logins on a production configuration
Keep the handler light; it runs on every failed attempt
SessionOnLogout
Session
When a session closes
User name
Record logout for licence or audit reporting
Sessions that time out may not behave like a clean logout; test your case
SessionOnVarChanged
Session
Before a session variable changes
Variable name and new value
Watch changes to a session variable a customization relies on
Read values with VARIABLENAME() and VARIABLEVALUE()
SessionPostVarChanged
Session
After a session variable changes
Variable name and new value
React after a variable is set
Fires often if a form sets variables on every record
TaskOnPerform
Task
Before a background task is performed
Environment attributes, profile parameters, report options, cultural formatting, task attributes, task parameters
Check parameters before a long report runs
Keep the handler light: it runs before every execution of the task
TaskPostPerform
Task
When a task completes successfully
TaskOnPerform attributes plus task result attributes
Email a finished report to a distribution list
Needs a Document Types entry for each Output Format value used, with the matching file extension (for example PDF)
TaskOnPerformFailed
Task
When a task fails
TaskOnPerform attributes plus task result attributes
Alert the owner when a nightly background task fails
Use it instead of polling Background Task History
BodPreReceive
BOD
When an inbound BOD is queued for processing
BOD verb, BOD noun, BOD XML
Screen inbound BODs before processing
If the handler fails, the BOD is not processed and BodOnReceive does not fire
BodOnReceive
BOD
When the site receives an inbound BOD through ION
BODVERB(), BODNOUN(), BODXML
Route or log inbound Sync.ItemMaster or Process.SalesOrder BODs
Use SUBXML to pull nodes from BODXML() rather than string parsing
BodOnReceiveFail
BOD
When processing of a received BOD fails
BOD verb, BOD noun, BOD XML, error message
Notify the integration owner with the error text
Pair it with a review of the inbox forms for the failed document
DataViewOnLoad
Other
When a DataView begins loading
DataView report name (initiator)
Audit use of a DataView
Newer than SyteLine 9.x; confirm the event exists in your release
DataViewPostLoad
Other
When a DataView finishes loading
DataView report name (initiator)
Log completion of a heavy DataView
Newer than SyteLine 9.x; confirm the event exists in your release
ClearServiceSessions
Other
When a Mongoose core trigger clears old service sessions
None
Rarely handled; housekeeping
Do not attach slow actions to housekeeping events

Names and parameters follow the Mongoose Framework events help topic. Internal-only events (EmailReportFromFileServer*, FileContentTest) are excluded. Event availability varies by Mongoose release: confirm the list in the Events form on your SyteLine 9.x, 10.x or CSI system before you build a handler.

Get your event handlers reviewed

Send us an export of your Event Handlers and Event Actions and we will flag handlers that fire too often, block saves unexpectedly or will not survive an upgrade.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

Where this lives in SyteLine

Framework events are system-defined, so you do not create them; you attach handlers to them. Open the Event Handlers form, create a handler, set Event Name to one of these events and, for IDO events, set the Applies to Objects field to the IDO (for example SLCustomers or SLCoitems). Then add actions on the Event Actions form. Use the Event Status and Event Handler Status forms to see each run. For custom logic that only your forms should fire, define a custom event on the Events form and fire it with a Generate Event action instead of overloading a framework event.

  • Event Handlers form: event name, applies-to objects, synchronous flag, sequence
  • Event Actions form: the steps the handler runs
  • Event Status form: results of each run, including failures and messages

On events versus Post events

The naming rule is consistent: On events run before the change and Post events run after it. A synchronous handler on IdoOnItemUpdate that ends with a Fail action stops the update and shows the failure message to the user, which is how most SyteLine validation rules are built. A Post event is the right place for notifications and logging because the data is already committed. Item events (IdoOnItemInsert, Update, Delete and their Post versions) fire once per row, so a grid save of 200 lines fires 200 times. IdoPostUpdateCollection fires once after the whole update finishes, which suits a single follow-up action per save.

Worked example: credit hold approval

To stop users clearing credit hold without approval, add a synchronous handler on IdoOnItemUpdate for SLCustomers. Give the first action a condition based on PROPERTYMODIFIED("CreditHold") so it only runs when that property changed, then use a Prompt to the credit manager and a Fail action when the answer is no. Because Prompt suspends the handler, the handler must be allowed to suspend; test this on a copy of your configuration first, since a synchronous handler that waits on a person holds the user's save open. Many sites prefer a Post event notification plus a report of changes when approval delays are not acceptable.

Version differences and gotchas

DataView and Data Lake related events are newer than SyteLine 9.x, and the help for current Mongoose releases lists events your on-prem 9.x system may not have. Property functions are event specific: P or PROPERTY works only on the item events, P2 or PROPERTY2 only on IdoOnLoadCollection and IdoPostLoadCollection, and P3 after a Load IDO Collection action. ROWS() returns 0 outside IdoPostLoadCollection. TaskPostPerform handlers need a Document Types entry for each Output Format on Report Options. Handlers on high-volume IDOs such as SLMatltrans or SLCoitems add load to every save, so keep conditions tight.

Frequently Asked Questions

Where is the Infor Mongoose documentation for framework events?

Infor publishes it in the Mongoose online help under Framework events, and the SyteLine and CSI help include the same topic in the application event system guide. Use the help for your release, since the list grows over time. On your own system, the Events form shows every framework event that exists in that configuration.

Can a handler on IdoOnItemUpdate stop the save?

Yes, if the handler is synchronous and fails. A Fail action with a condition and a message ends the handler with Failure status, the update is rejected and the user sees the message. Asynchronous handlers run separately and cannot stop the save, so use them for notifications rather than validation.

Why does P() return nothing in my load collection handler?

P and PROPERTY only work with the item events (IdoOnItem and IdoPostItem). On IdoOnLoadCollection and IdoPostLoadCollection use the row form, shown as P2 or PROPERTY2 in the expression editor, with a one-based row number. After a Load IDO Collection action, use P3 with the result set name.

Is the Mongoose event system the same as WinStudio form events?

No. Framework and application events run on the application server and apply to every client and integration that touches the IDO. WinStudio form events such as StdFormSave run only inside one form in the client. Validation that must hold for imports and APIs belongs in the event system or IDO code, not in a form script.

If you want your team to ask SyteLine which handlers fire on an IDO, or what changed on an order, in plain English on your own servers, we can set that up.

Get Infor SyteLine alerts

Support and maintenance deadlines, release changes that affect Infor SyteLine sites, and new free Infor SyteLine tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor SyteLine: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

Software