SyteLine Data Conversion Mapping Worksheet
Data conversion is where SyteLine projects slip. This worksheet gives every legacy field a target, a rule, an owner and a measured reject rate, so you see problems after the first trial load and not at cutover.
| Data object | Legacy field | SyteLine target field | Transform rule | Owner | Source records | Rejected in trial load | Reject rate | Status | |
|---|---|---|---|---|---|---|---|---|---|
1.2% | |||||||||
0.2% | |||||||||
0.7% | |||||||||
4.6% | |||||||||
0% | |||||||||
0.5% |
Add one line per field, not per object, once the design is stable. Record counts are per load, so repeat the object for each load attempt or keep counts on the key field line. Replace target field names with the exact labels in your SyteLine version.
Get a second pair of eyes on your mapping
Optional expert review of your conversion approach and trial load results.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Add a row for each legacy field you intend to bring across, pick the data object, then name the SyteLine target field and write the transform in plain language. After each trial load, enter the source record count and the number rejected. The reject rate is computed for you per line and overall. Export to Excel to share with business owners who sign off each object.
- One owner per line, a named person.
- Write the transform so a new analyst can code it.
- Move status forward only with evidence.
- Keep rejected record lists with the trial results.
Reading the reject rate
A reject rate under one percent on master data after the second trial load is a reasonable goal, but the right threshold depends on the object. Ten rejected items out of ten thousand is cleanup work; ten rejected opening GL accounts out of a hundred is a blocker. Use the worst line figure to find the field that needs attention first and the overall rate for steering committee reporting.
Typical load order
Reference data comes first: units of measure, currencies, terms, tax codes, chart of accounts, sites and warehouses. Then items, customers and vendors, then bills of material and routings, then open orders, and last on-hand inventory and balances at cutover. Loading out of order creates rejects that are really dependency errors rather than data errors.
Common mistakes
Teams migrate years of closed history nobody will use, skip duplicate cleanup in vendor and customer masters, map units of measure by guesswork and leave on-hand inventory until the last night. Decide what to leave in the archive, reconcile quantities and values to the legacy ledger, and rehearse the final load at least twice.
Frequently Asked Questions
Should I map every legacy field?
No. Map the fields that drive current transactions and reporting, and archive the rest. Each field migrated has to be cleaned, tested and reconciled, so unneeded fields add risk without adding value.
What tool loads the data into SyteLine?
Teams commonly use the standard import and load utilities, IDO based web services or custom scripts. Choose per object, and keep the transform rules in this sheet independent of the loader so they survive a change of method.
How many trial loads are enough?
Plan at least three: an early structural load, a full volume load with business validation, and a dress rehearsal timed like cutover. Keep reject rates and timing from each in this sheet to show convergence.
How do I handle open transactions?
Prefer to close out what you can in the legacy system and migrate only genuinely open orders, jobs and balances. Reconcile each migrated open item to a source report and have its business owner sign it off.
If you are moving from an older ERP into SyteLine and want agents to profile source data and draft mappings for your consultants to review, get in touch.
Related Tools
SyteLine Cutover Plan Worksheet
An editable cutover runbook with sequence, owner, planned duration, rollback point and a running total of the cutover window.
Infor SyteLineSyteLine UAT Test Script Worksheet
An editable UAT tracker with business process, steps, expected result, tester, outcome and defect reference, plus pass rate summary.
Infor SyteLineSyteLine Cycle Count Variance Worksheet
An editable cycle count sheet that computes variance quantity, variance value and record accuracy per line and overall.
Infor SyteLineSyteLine Go-Live Readiness Checklist
Thirty expert checks across data, testing, people, technical, and cutover workstreams to tell you whether your SyteLine go-live is actually ready.
More Infor SyteLine tools
See all- SyteLine Form Personalization Checklist
- SyteLine User Access Request Form Template
- SyteLine Custom Report Request Template
- SyteLine Change Request Form Template
- SyteLine Database Growth Forecast Calculator
- SyteLine Reorder Point and Safety Stock Calculator
- SyteLine EOQ and Lot Size Calculator
- SyteLine Job Cost Estimate Calculator
- SyteLine Scrap, Yield and Start Quantity Calculator
New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- ERP API Field Mapping WorksheetMap each ERP API field to the parameter an AI tool exposes, with types, required flags and transform rules, then export to Excel.
- ERP Data Migration Mapping WorksheetEditable source-to-target field mapping sheet for moving a legacy ERP into abas, proALPHA, IFS, Exact or any other target. Tracks rules, owners and sign-off.
- Infor M3 Data Conversion Mapping WorksheetTrack every legacy field to M3 target mapping with transformation rule, owner, record counts and cleansing status in a single table.
ERP fixes and how-tos
- How to Map and Transform a BOD in Infor ION ConnectHow to build a mapping in ION Desk between two BOD or message types, handle custom fields and lookups, test with the Monitor and fix common mapping errors.
- Infor ION Scripting and ETL: Transformation Options ExplainedInfor ION scripting and ETL explained: mapping and transformation in document flows, where scripting fits, and when to use Data Lake flows or another ETL tool.
- Fishbowl Inventory and QuickBooks Integration: Setup, Mapping and Sync ErrorsSet up and troubleshoot the Fishbowl and QuickBooks integration: how posting works, account mapping, common sync errors, and checks for accountants.
Guides
- ERP Data Mapping Best PracticesMaster ERP data mapping with source-to-target techniques, transformation rules, and field-level documentation. Prevent data loss during ERP migration.
- SyteLine GL Posting Rules Configuration GuideConfigure GL posting rules in Infor SyteLine for inventory transactions, production costing, AP, AR, and purchasing with account mapping best practices.
- SyteLine Upgrade Data Conversion GuideHandle data conversion during SyteLine upgrades including schema migration, data transformation rules, open transaction handling, and historical data archival.
AI on your ERP
- Mapping DFARS 7012 and NIST 800-171 Controls to AI on Your ERPMap DFARS 252.204-7012 and NIST SP 800-171 control families to an AI system layered on your ERP, with evidence a Compliance Manager can defend.
- AI for TrueCommerce: Tracing EDI Transactions Across Partners, Maps and Your ERPPut private AI on TrueCommerce EDI and ERP data: trace failed transactions, explain mapping errors and answer partner questions without cloud APIs.