Thread Go/No-Go Gauge Inspection Record Template
Thread checks are quick, yet the record of them is often a tick on a traveler. This template records the thread callout, gauge IDs, calibration dates and piece-by-piece results so a thread nonconformance can be traced.
Fill in
Thread Go/No-Go Gauge Inspection Record Template
Thread Inspection Record
Company: Northline Machining Part: FTG-1180 Rev B Job / lot: WO-24822 / Lot 7 Thread: 1/2-13 UNC-2A (External thread) Date: 2026-10-20 Inspector: M. Okafor
Gauging Method
Method: Ring gauge (GO / NOGO) GO gauge: TRG-0412, cal due 2027-03-01 NOGO gauge: TRG-0413, cal due 2027-03-01 Sample plan: First piece, then 5 pieces per hour
Results
| Piece # | GO result | NOGO result | Visual (burrs, tears) | Pass / Fail |
|---|---|---|---|---|
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 |
Remarks
GO gauge enters freely for full length. NOGO enters no more than 2 turns where applicable per gauge instructions.
Disposition
Disposition: Accept
Approvals
Follow the gauge manufacturer instructions and your customer drawing for the exact acceptance method, since NOGO rules differ by class and gauge type. This sheet records results and is not a substitute for the thread standard.
Connect inspection records to lot traceability
Optional: ask how inspection results could attach to lots and work orders in your ERP.
Optional. The tool and every export work without this. No spam.
How to use the record
Enter the thread callout exactly as on the drawing, choose whether it is internal or external, and note which gauge set you used. Record calibration due dates for both GO and NOGO gauges, since an expired gauge invalidates the check. Then fill the results table during inspection, one row per piece, and select a final disposition. Export to PDF and attach it to the lot.
How GO and NOGO gauging works
A GO gauge checks the maximum material condition: it must thread on or in freely along the full thread length. A NOGO gauge checks the minimum material limit: it must not advance beyond the allowed number of turns, often stated by the gauge maker. For Unified threads, the class on the drawing, such as 2A for external or 2B for internal, sets the tolerance. Metric threads use tolerance classes such as 6g or 6H.
What to record when a thread fails
Note which gauge failed and how: a GO that will not start suggests an oversize external or undersize internal thread, burrs, or damage, while a NOGO that goes too far suggests the opposite or a worn cutter. Add the visual finding, tool station and last insert change so the process cause can be found. Do not re-chase and re-gauge without logging the first result.
Common mistakes
Do not force gauges; they are meant to turn by hand. Clean threads and gauges of chips and oil before checking. Avoid using one gauge past its calibration date. Record plating or coating: gauge acceptance before and after plating differs, and the drawing states which condition applies. Finally, do not treat a pass on gauges as proof of pitch diameter when the customer demands measured values.
Frequently Asked Questions
What does UNC 2A mean?
UNC means Unified National Coarse, the standard coarse pitch series. The number is the class of fit and the letter A means an external thread, B an internal thread. Class 2 is the common general-purpose fit, with class 3 tighter.
How often should thread gauges be calibrated?
Interval depends on use, wear risk and customer or quality system rules. Many shops use six to twelve months and shorter for heavily used gauges. Follow your calibration procedure and record the due date on the inspection sheet.
Do I need a NOGO check on every part?
Not always. Your control plan or customer drawing sets the frequency. Many plans check GO on every part and the NOGO on first piece and at intervals. Write the actual sample plan on the record so it can be audited.
Can I use this for metric threads?
Yes. Enter a callout like M12x1.75-6g in the thread field and record the metric gauge IDs. The layout is the same, only the tolerance class and gauge set differ.
If you need thread results to roll into lot traceability and nonconformance records in your ERP, Netray can help design that flow.
Related Tools
CNC Lathe Setup Sheet Template
A printable lathe setup sheet covering workholding, stickout, tool stations, offsets and first-piece checks, so the next operator can repeat the job.
MES & Shop FloorLathe Tool Offset Record Worksheet
Keep a written record of geometry and wear offsets per turret station so you can rebuild a setup or spot tools that drift.
Costing & FinanceThreading and Tapping Job Cost Estimate Worksheet
List threads on a part with cycle times, tool costs and machine rate to see the cost per part and per lot for threading and tapping.
MES & Shop FloorDrilling Feeds and Speeds Planning Worksheet
List each hole with surface speed, feed per revolution and depth, and get RPM, feed rate and drilling time per hole automatically.
More Quality & Inspection tools
See all- CNC First Piece Inspection Record Template
- Unified and Metric Thread Class and Tolerance Reference
- Machine Shop Inspection Checklist (Incoming, In-Process, Final)
- Machine Shop Quality Policy and Objectives Template
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
Keep exploring
Free tools
- ERP Go/No-Go Decision Record TemplateA formal go/no-go decision document for ERP cutover with criteria status, open defects, conditions and executive sign-off.
- CNC Thread Milling Feed Rate CalculatorConvert the feed per tooth at the cutting edge into the programmed centreline feed for internal and external helical thread milling.
- Thread Milling G-Code GeneratorFill in thread size, pitch, tool path radius and feed to generate a Fanuc-style helical thread milling program for an internal right-hand thread.
ERP fixes and how-tos
- Gauge Found Out of Tolerance: How to Find Affected Product Using ERP and Calibration DataWhen a gauge fails calibration, find every lot it measured since the last good check. How to tie gauge IDs to ERP inspections and run the impact assessment.
- What is a quality info record in SAP QM, and how do customer returns trigger inspection?What the quality info record (QI01) is in SAP QM, how it controls inspection per vendor and material, and how customer returns trigger inspection.
- SAP QM Sample Label Printing: How to Print Physical Sample LabelsHow SAP QM sample label printing works: physical samples on an inspection lot, the QPR print transactions, the form behind the label and printer checks.
Guides
- The Digital Thread in Aerospace Manufacturing: How AI Finally Connects ItThe digital thread in aerospace manufacturing: how AI connects CAD, ERP, MES, and quality data into one traceable record from design through sustainment.
- ERP for Fastener Manufacturers: Cold Heading and Thread RollingWhat fastener manufacturers need from ERP: wire rod heat lots, cold heading and thread rolling routings, heat treat and plating, lot genealogy and certs.
- How to Set Up Calibration Management in SyteLineGuide to configuring calibration management in Infor SyteLine. Set up gauge tracking, calibration schedules, out-of-tolerance handling, and traceability to NIST standards for ISO 10012 compliance.
AI on your ERP
- AI for ProShop ERP in Medical Device Machining: Traceability, NCRs and Audit ReadinessPrivate AI for ProShop medical device machine shops: work orders, NCRs, CAPA, calibration and lot traceability answered from your own data, with QMSR in mind.
- AI Across PLM and ERP: Teamcenter, Windchill, and Your ERPAI that reads Teamcenter or Windchill alongside your ERP to trace engineering change impact, BOM sync gaps, and where-used questions, on-prem.