SAPFree referencePDF, Excel, Word exportSAP ABAPAll SAP HANA and Basis tools

ABAP Developer Transaction Codes Reference

ABAP development is a lot of jumping between tools: dictionary, editor, class builder, dump analysis, job monitor, transport organizer. This reference lists the transaction codes developers use every day, grouped by area, so new team members and cross-trained consultants can find the right screen quickly.

Download:
T-codeNameAreaWhat ABAP developers use it for
SE11
ABAP Dictionary
Development
Create and display tables, views, data elements, domains, structures
SE16
Data Browser
Data
Display table contents with selection conditions
SE16N
General Table Display
Data
Display table contents with a newer selection screen
SE37
Function Builder
Development
Create, test and display function modules
SE38
ABAP Editor
Development
Create, edit and execute reports and includes
SA38
ABAP Program Execution
Development
Run a program by name, also used in authorization checks
SE80
Object Navigator
Development
Browse packages, programs, classes and objects in one tree
SE24
Class Builder
Development
Create and display global classes and interfaces
SE18
BAdI Builder, definitions
Enhancement
Display classic BAdI definitions
SE19
BAdI Builder, implementations
Enhancement
Create and maintain classic BAdI implementations
SE51
Screen Painter
Development
Design dynpro screens and flow logic
SE41
Menu Painter
Development
Maintain GUI status and GUI title
SE91
Message Maintenance
Development
Create message classes and message texts
SE93
Transaction Maintenance
Development
Create custom transaction codes
SE84
Repository Information System
Search
Search for objects by name, package or type
SE14
Database Utility
Data
Activate and adjust database tables after dictionary changes
SE63
Translation
Development
Translate texts for multi-language systems
SM30
Table Maintenance
Data
Maintain customizing and custom table entries
SE09
Transport Organizer
Transport
Display and release your workbench and customizing requests
SE10
Transport Organizer (Extended)
Transport
Display requests of any user, create transports of copies
SE01
Transport Organizer (Extended view)
Transport
Manage and search transport requests and tasks
STMS
Transport Management System
Transport
Import queues, transport routes, import status
SCC4
Client Administration
Basis
Check client role and change protection settings
SE06
Set Up Transport Organizer
Basis
Check the system change option
ST22
ABAP Runtime Error (Dump) Analysis
Analysis
Read short dumps and see where the program stopped
SM21
System Log
Analysis
Review system messages and errors
SLG1
Application Log Analysis
Analysis
Read logs written with the application log API
SM37
Job Overview
Background
Monitor and analyse background jobs
SM36
Define Background Job
Background
Schedule background jobs and steps
SM50
Process Overview
Analysis
See running work processes on the application server
SM12
Lock Entries
Analysis
Display and delete enqueue locks
SM13
Update Requests
Analysis
Check failed or pending update tasks
SM59
RFC Destinations
Integration
Maintain and test RFC connections
ST05
Performance Trace
Performance
Trace SQL, enqueue, RFC and buffer calls
SAT
ABAP Trace
Performance
Runtime analysis of programs and calls
SCI
Code Inspector
Quality
Run static checks on custom objects
ATC
ABAP Test Cockpit
Quality
Run ATC check variants and review findings
SU53
Authorization Check Display
Security
See the last failed authorization check
SU21
Authorization Objects
Security
Display authorization objects and their fields
PFCG
Role Maintenance
Security
Maintain roles and authorization data
WE02
IDoc Display
Integration
Display IDocs and their status records
WE19
IDoc Test Tool
Integration
Create and process test IDocs
BD87
Status Monitor for ALE Messages
Integration
Select and reprocess IDocs by status
SEGW
SAP Gateway Service Builder
Integration
Build OData services in the classic gateway model
SICF
HTTP Service Hierarchy
Integration
Activate and maintain ICF services
AL11
SAP Directories
Basis
Browse files on the application server
ABAPDOCU
ABAP Documentation and Examples
Help
Read the ABAP keyword documentation and run examples

Availability depends on release and authorizations. Some transactions are replaced by Fiori apps or ADT (ABAP Development Tools in Eclipse) in S/4HANA, and ATC is usually reached through ADT or the ATC transaction on your release.

AI help for SAP dumps and logs

Optional: see how a private assistant could explain ABAP dumps and application logs using your own documentation.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the list

Search by code, by name or by a task word such as dump, trace, job or transport. The Area column groups codes into development, data, transport, analysis, performance, quality, security and integration. Enter a code in the command field with a leading /n to open it in the current session or /o to open it in a new one. Export the list to Excel or PDF to give a new developer a starter sheet for onboarding.

A typical developer day in transaction codes

You change a table in SE11, write or fix a report in SE38 or a class in SE24, and test it in SE37 or by running the program. When something breaks you read the dump in ST22 and the log in SLG1, and check the job in SM37. You trace slow SQL in ST05 or ABAP runtime in SAT, run SCI or ATC before release, then release the request in SE09 and watch the import in STMS. Knowing this chain is the core of working in an SAP landscape.

  • Build: SE11, SE38, SE24, SE37, SE80
  • Debug and analyse: ST22, SLG1, SM21, SM50
  • Performance: ST05, SAT
  • Release: SE09, SE10, STMS

Authorizations and system settings

Many of these codes need developer keys, a change-enabled client and a suitable system change option, and in production they should be locked down. If a transaction fails with an authorization error, SU53 shows the last failed check and the object and fields involved. Clients are set to allow or block changes in SCC4, and transport settings in SE06. Do not ask for broad debug-and-replace authorizations in production; use controlled firefighter access instead.

Fiori and ADT in S/4HANA

Modern SAP development increasingly happens in ABAP Development Tools in Eclipse rather than SE80, and many classic monitors have Fiori app equivalents. The transaction codes above still work in the SAP GUI on most systems and remain the common language between consultants. Learn both, and treat the code list as a map of capabilities rather than a promise that each screen exists unchanged in your release.

Frequently Asked Questions

What is the difference between SE38 and SA38?

SE38 is the ABAP Editor where you create, change and run programs. SA38 only executes a program by name and is usually the one given to end users. Authorization for running programs is controlled by object S_PROGRAM and related checks, so SA38 is safer to expose.

Which transaction shows why a program crashed?

ST22 shows ABAP runtime errors (short dumps) with the error type, the source line and the variable values at the time. Use the date, user and program filters to find your dump, and read the Active Calls section to see how the program reached the failing statement.

How do I find which transaction runs a given program?

Look the program name up in table TSTC in SE16N, or search in SE93 by program. For standard SAP, use SE84 or the Where-Used list of the program in SE38. Some transactions call function modules or classes, so a program name may not appear.

Do these codes work in S/4HANA?

Most of them do in the SAP GUI. SAP is steering development toward ABAP Development Tools in Eclipse and Fiori apps, and some classic tools are deprecated, so check your release. The codes remain a useful common vocabulary across ECC and S/4HANA projects.

If you spend hours reading dumps and logs, Netray can discuss a private AI assistant that explains ST22 and SLG1 output using your own system documentation, kept on your infrastructure.