SAP PP Transaction Codes List: Production Orders, MRP, BOM, Routing

SAP PP has a lot of transactions, and most consultants only remember the ones they used on their last project. This list groups the production planning codes by job: orders, confirmation, MRP, demand, BOM, routing, work centers and capacity. Search by code or by words such as 'release' or 'where-used'.

Download:
T-codeAreaWhat it does
CO01
Production orders
Create a production order for a material and plant
CO02
Production orders
Change a production order (dates, quantity, components, status)
CO03
Production orders
Display a production order
CO05N
Production orders
Collective release of production orders
CO11N
Confirmation
Enter a time ticket confirmation for an operation
CO15
Confirmation
Enter a production order confirmation with yield and goods movements
CO13
Confirmation
Cancel a production order confirmation
COOIS
Reporting
Order information system: list orders, operations, components
COHV
Mass processing
Mass processing of orders (release, schedule, TECO, etc.)
COGI
Goods movements
Postprocess goods movements that failed during confirmation
CO24
Reporting
Missing parts information system for production orders
CO09
Availability
Material availability overview for an order
CO27
Material staging
Pick list for production order components
KO88
Settlement
Actual settlement of a single production order
CO88
Settlement
Collective actual settlement of production orders
MD01
MRP run
MRP run for the whole plant (total planning)
MD01N
MRP run
MRP run for the plant using the newer interface
MD02
MRP run
Single-item, multi-level MRP run
MD03
MRP run
Single-item, single-level MRP run
MD04
MRP evaluation
Stock/requirements list for one material and plant
MD05
MRP evaluation
Display the MRP list for a material
MD06
MRP evaluation
Collective display of MRP lists
MD07
MRP evaluation
Collective display of stock/requirements lists
MD11
Planned orders
Create a planned order manually
MD12
Planned orders
Change a planned order
MD13
Planned orders
Display a planned order
MD14
Planned orders
Convert a planned order to a purchase requisition
MD16
Planned orders
Collective display of planned orders
MD20
MRP master
Create planning file entry for a material
MD21
MRP master
Display planning file entries
MD50
MRP run
Single-item, multi-level planning for a sales order (make-to-order)
MD61
Demand
Create planned independent requirements
MD62
Demand
Change planned independent requirements
MD63
Demand
Display planned independent requirements
MD73
Demand
Display total requirements (all independent requirements)
CS01
BOM
Create a material BOM
CS02
BOM
Change a material BOM
CS03
BOM
Display a material BOM
CS07
BOM
Allocate an existing BOM to another plant
CS11
BOM reports
BOM explosion, level by level
CS12
BOM reports
BOM explosion, multilevel
CS13
BOM reports
BOM explosion, summarized
CS15
BOM reports
Where-used list for a material
CS20
BOM
BOM mass change
CA01
Routing
Create a routing
CA02
Routing
Change a routing
CA03
Routing
Display a routing
CA11
Routing
Create a reference operation set
CA85
Routing
Mass replacement of work centers in task lists
CR01
Work center
Create a work center
CR02
Work center
Change a work center
CR03
Work center
Display a work center
CR05
Work center
Work center list
CM01
Capacity
Capacity load evaluation by work center
CM25
Capacity
Capacity planning table for leveling
C223
Master data
Maintain production versions for a material
MM02
Master data
Change material master (MRP, work scheduling views)
MMBE
Stock
Stock overview by plant, storage location, batch

Codes are shown for SAP ERP and SAP S/4HANA on-premise. Some transactions are replaced by Fiori apps in S/4HANA, and a few older codes are flagged obsolete in later releases; check the simplification list for your release before relying on a code.

Ask your SAP PP data in plain English

Optional: see how a read-only natural language layer over SAP production orders and MRP data would work in your landscape.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the list

Type part of a code or a keyword in the search box to filter the table. Use the Area column to read one workflow end to end, for example the MD group for an MRP run and review. Export to Excel if you want to hand a team new to PP a one-page cheat sheet, or paste the codes into a training document. The list is read-only and does not connect to any SAP system.

How the codes group in practice

Master data is the first layer: material master (MM02), BOM (CS01 to CS03), routing (CA01 to CA03), work center (CR01 to CR03) and production version (C223). Demand and planning come next: planned independent requirements (MD61), the MRP run (MD01, MD02, MD03) and evaluation (MD04, MD05, MD07). Execution follows with CO01, release, confirmation and goods movement fixes in COGI. Finally settlement (KO88, CO88) closes the order.

  • Single-item runs (MD02, MD03) are the safest way to test a change on one material.
  • MD04 is the most used screen for planners; MD07 is its collective version.
  • COOIS and COHV are the two tools for working through many orders at once.

Common mistakes

Planners often change a BOM or routing and then wonder why MRP shows nothing new. The planning file entry (MD20, MD21) decides whether a material is picked up in net change runs, and master data changes normally set it automatically only when the material is MRP relevant. Another frequent issue is confirming with CO15 when goods movements fail, leaving stock unposted until COGI is worked. Check COGI daily.

Frequently Asked Questions

Which transaction shows MRP results for one material?

MD04 is the stock/requirements list, showing current stock, planned orders, production orders, purchase requisitions and requirements in date order. MD05 shows the saved MRP list from the last planning run, which can differ from the live view in MD04 if things have changed since.

What is the difference between CO01 and converting a planned order?

CO01 creates a production order directly for a material. Orders created from a planned order are normally converted through the planned order screens or collective conversion transactions, which carry over quantity, dates and the production version from the planned order.

Are these codes valid in S/4HANA?

Most of them still work in S/4HANA on-premise, but several have a Fiori app equivalent and MD01N or MD01 behaviour depends on release. Always check the S/4HANA simplification list for your target release before standardising on a code.

Can I add my own custom Z transactions?

Export the table to Excel and add a column for your Z-codes and the report each calls. Many plants have custom order lists and shortage reports that planners actually use more than the standard ones, so documenting them next to the standard codes is useful.

If your planners spend time hunting through SAP screens for answers, Netray can set up a read-only natural language layer over your PP data so they can ask for open orders or shortages directly.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring