SAPFree referencePDF, Excel, Word exportSAP S/4HANAAll SAP S/4HANA (on-premise) tools

SAP MM Transaction Codes List (Searchable T-Code Reference)

SAP MM has hundreds of transaction codes but a working consultant, buyer or key user lives in about sixty of them. This searchable list groups the daily ones by process so you can find the right T-code without trawling SAP Easy Access.

Download:
T-codeAreaWhat it doesNote
ME51N
Requisition
Create purchase requisition
Fiori: Create Purchase Requisition
ME52N
Requisition
Change purchase requisition
ME53N
Requisition
Display purchase requisition
ME54N
Requisition
Release (approve) purchase requisition
Used with a requisition release strategy
ME5A
Requisition
List display of purchase requisitions
ME57
Requisition
Assign and process requisitions
Assign a source before ordering
ME59N
Requisition
Automatic generation of POs from requisitions
Needs source of supply and auto PO flag
ME21N
Purchase order
Create purchase order
Fiori: Manage Purchase Orders
ME22N
Purchase order
Change purchase order
ME23N
Purchase order
Display purchase order
ME29N
Purchase order
Release purchase order
Individual release for a PO release strategy
ME28
Purchase order
Release purchase orders collectively
ME2M
PO reporting
Purchase orders by material
Selection by scope of list
ME2L
PO reporting
Purchase orders by vendor
ME2N
PO reporting
Purchase orders by PO number
ME80FN
PO reporting
General analysis of purchasing documents
ALV based, flexible selection
ME2O
Subcontracting
Subcontracting stock monitoring
Components provided to the vendor
ME31K
Outline agreement
Create contract
ME32K
Outline agreement
Change contract
ME33K
Outline agreement
Display contract
ME31L
Outline agreement
Create scheduling agreement
ME41
Sourcing
Create request for quotation
ME47
Sourcing
Maintain quotation
ME49
Sourcing
Price comparison list
Compares quotations for an RFQ
ME01
Sourcing
Maintain source list
Table EORD
ME03
Sourcing
Display source list
ME11
Info record
Create purchasing info record
Tables EINA and EINE
ME12
Info record
Change purchasing info record
ME13
Info record
Display purchasing info record
MM01
Material master
Create material
S/4HANA: material number up to 40 characters
MM02
Material master
Change material
MM03
Material master
Display material
MM60
Material master
Material list
MMSC
Material master
Create storage location for a material in one step
Collective creation of storage location views
MIGO
Inventory
Goods movement: goods receipt, goods issue, transfer posting
Replaces the older MB01, MB1A, MB1B, MB1C
MMBE
Inventory
Stock overview for a material
Plant, storage location, batch, special stock
MB51
Inventory
Material document list
Reads material documents
MB52
Inventory
Warehouse stocks of material
Includes valuated stock value
MB5B
Inventory
Stocks for posting date
Historical stock on a past date
MB03
Inventory
Display material document
MI01
Physical inventory
Create physical inventory document
MI04
Physical inventory
Enter inventory count with document reference
MI07
Physical inventory
Post inventory differences
Posts differences to stock and accounting
MI20
Physical inventory
List of inventory differences
Review before MI07
MIBC
Physical inventory
ABC analysis for cycle counting
Assigns cycle counting indicators
MIRO
Invoice verification
Enter incoming invoice
Logistics invoice verification
MIR7
Invoice verification
Park invoice
Save without posting
MIR4
Invoice verification
Display invoice document
Tables RBKP and RSEG
MIR6
Invoice verification
Invoice overview
MR8M
Invoice verification
Cancel invoice document
MRBR
Invoice verification
Release blocked invoices
Invoices blocked by tolerance or manual block
MR11
Invoice verification
GR/IR account maintenance
Clears GR/IR differences
MRKO
Invoice verification
Consignment and pipeline settlement
MD01N
MRP
MRP Live run (total planning)
HANA optimized; MD01 is the classic run
MD02
MRP
Single-item, multi-level planning
MD03
MRP
Single-item, single-level planning
MD04
MRP
Stock/requirements list
Current view of supply and demand
MD05
MRP
MRP list
Result of the last MRP run
MD06
MRP
MRP list collective display
MD07
MRP
Stock/requirements list collective display
MD61
MRP
Create planned independent requirements
MMPV
Period close
Close period for materials
Sets the posting period for inventory
OMJJ
Customizing
Customize movement types
Movement types are table T156

Search by code or keyword. Availability differs by release: several classic transactions are replaced by Fiori apps or marked obsolete in S/4HANA, so confirm in your own system with SE93 or the SAP Fiori apps reference library.

Ask SAP in plain English

Want buyers to get PO and stock answers without memorizing T-codes? We can show a read-only demo over your SAP data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the list

Type a code, a keyword such as 'invoice' or 'source list', or an area name into the search box and the table filters instantly. Rows are grouped by process: requisition, purchase order, outline agreements, sourcing, info records, material master, inventory, physical inventory, invoice verification, MRP and period close. Use the export buttons to take a trimmed copy into Excel or PDF for a team cheat sheet or a role-specific training pack.

  • Search by T-code, keyword or area
  • Note column flags tables and S/4HANA differences
  • Export the filtered view for training handouts

S/4HANA differences worth knowing

S/4HANA keeps most MM transactions but changes what sits underneath them. Material documents are stored in table MATDOC, with MKPF and MSEG kept as compatibility views. MD01N (MRP Live) runs on HANA and is the recommended planning run, though classic MD01 remains. Vendors are maintained as business partners through transaction BP, not XK01. Many classic goods movement transactions such as MB1A, MB1B and MB1C are obsolete in favor of MIGO, and Fiori apps now cover much daily buyer work.

Common mistakes

People still memorize old codes and hit authorization errors because the role only grants the Fiori app or the newer transaction. Another frequent error is mixing the single-screen transactions with their older split versions: ME21N and ME21 behave differently, and ME21 is obsolete. Finally, report transactions such as ME2M, ME2L and ME2N show different selection screens for the same PO tables, so choose the one that matches how you search: by material, vendor or PO number.

Frequently Asked Questions

What is the difference between ME21N and ME21?

ME21N is the current single-screen purchase order transaction with header and item overview. ME21 was the older multi-screen version and is obsolete. ME22N and ME23N are the matching change and display transactions. In S/4HANA the Fiori app Manage Purchase Orders is also available.

Which T-code do I use to see stock for a material?

MMBE gives a stock overview by plant, storage location, batch and special stock. MB52 lists warehouse stocks with value and works well for many materials at once. For stock on a past date use MB5B. In S/4HANA the Fiori app Stock Multiple Materials is also common.

How do I find a transaction code I do not know?

Use SE93 to search the transaction directory by short text, or use the menu path search in SAP Easy Access. In a running screen, the System menu, Status entry shows the current program and transaction code. This list covers the daily MM set only.

Are all these transactions available in S/4HANA?

Most are, but some are obsolete or replaced by Fiori apps, and some behave differently in S/4HANA. For example material documents come from MATDOC and vendor maintenance moved to business partners. Check your release in SE93 and the Fiori apps reference library before standardizing training.

If your buyers still pull answers by running several of these transactions, we can put a read-only natural language layer over your SAP data that shows the query it ran. Ask us for a walkthrough.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring