Work Order Tracking Report (Open Work Order Tracking Sheet)
This is a working work order tracking report you can use today: list each open order, its status, quantities, hours and WIP, and the sheet calculates percent complete and hour variance. Export it to Excel, PDF or CSV for the morning production meeting.
| Work order | Item | Status | Due date | Qty ordered | Qty complete | % complete | Standard hours | Actual hours | Hour variance | WIP value | |
|---|---|---|---|---|---|---|---|---|---|---|---|
64% | -18 | ||||||||||
0% | -36 | ||||||||||
68.8% | 13 | ||||||||||
93.3% | -2 | ||||||||||
100% | 3 |
Sort by due date and review On hold rows first. Positive hour variance means the order used more hours than standard. Update the sheet at a fixed time each day.
Ask your ERP for open work orders
Optional: see how open work order and WIP questions can be answered from live ERP data without exports.
Optional. The tool and every export work without this. No spam.
How to use the tracking sheet
Replace the sample rows with your open work orders. Enter quantity ordered and completed, standard and actual hours, the due date and the WIP value from your system. Percent complete and hour variance are computed for each line, and totals update at the bottom. Review the sheet in the same meeting every day so that late or held orders are discussed while you can still act.
- Start with On hold and past-due rows
- Compare percent complete to elapsed time against due date
- Flag orders with large positive hour variance for a cause review
- Archive completed rows weekly to keep the sheet short
What an open work order report must show
A useful detail report answers four questions: what is open, how far along is it, is it on time, and what does it cost so far. That means status, quantity complete, due date, hours and WIP or cost. Anything more, such as operation-level progress, belongs in a separate drill-down. Keep the top-level view to one line per order.
ERP report equivalents
Most ERPs already contain this data. SAP has production order information reports such as COOIS for order lists. Oracle and NetSuite offer work order saved searches and reports. Infor SyteLine and Visual have job or work order status and WIP reports. Epicor and Dynamics provide job status and production order lists. Use the ERP for the live view and this sheet when you need a controlled snapshot, a custom layout or a share-out to people without system access. Check your version for exact report names.
Common mistakes
Do not mix hours units across rows, and do not leave actual hours blank on in-progress orders, since the variance will look better than it is. Compare hours only on completed operations, or scale standard hours by percent complete. Keep status values consistent so filters work.
Frequently Asked Questions
What is a work order tracking report?
It is a list of open work orders with their status, progress, due dates and hours or cost to date. Production planners and supervisors use it to find late, stuck or over-budget orders.
How is hour variance calculated?
Hour variance is actual hours minus standard hours. A positive value means the order took longer than planned. For in-progress orders, compare against standard hours scaled by percent complete.
Can I use this for maintenance work orders?
Yes. Treat quantity as tasks, hours as labor hours and the item as an asset ID. Add a priority column if you need one by exporting to Excel and editing.
How do I export it?
Use the export buttons to download Excel, PDF or CSV. The computed columns and totals are included.
If this report is rebuilt by hand from ERP exports every day, Netray can answer these questions directly from live ERP data with a private AI layer, including on-prem deployments.
Related Tools
Work Order Template (PDF Sample and Filled Example)
A fill-in work order form pre-loaded with a realistic sample for a production job. Edit the fields and export a clean PDF, Word or Excel copy.
MES & Shop FloorSchedule Adherence Tracking Worksheet
Record planned and actual units per day with the miss reason to measure schedule attainment and find the biggest cause of misses.
NetSuiteNetSuite Work Order Labor Variance Calculator
Break labor variance on completed work orders into a rate variance and an efficiency variance and read labor efficiency.
SAPSAP Production Order WIP Calculator
Estimate work in process on a production order from actual costs and goods receipts at standard, and compare with WIP at target cost.
More Discrete Manufacturing tools
See all- OEE Calculator (Overall Equipment Effectiveness)
- Scrap Rate Cost Calculator
- Takt Time Calculator
- Cycle Time & Capacity Calculator
- Inventory Carrying Cost Calculator
- Economic Order Quantity (EOQ) Calculator
- MRP Nervousness Assessment
- Production Scheduling Maturity Assessment
- Shop Floor Digitization Scorecard
Keep exploring
Free tools
- Excel Manufacturing Production Planning and Tracking WorksheetAn editable production worksheet for small manufacturers. Enter planned and actual quantities per order and work center, and it calculates hours, yield and attainment, then exports to Excel.
- FMEA Recommended Action Tracking Report TemplateA fill-in report that records one FMEA recommended action with owner, due date, verification evidence, before and after ratings, and sign-off.
- Monthly Manufacturing Cost Variance Report TemplateA fill-in monthly report for material, labor and overhead variances, with causes, owners and corrective actions.
ERP fixes and how-tos
- SyteLine customer on-time shipments: which dates to compare and how to report OTDHow to measure customer on-time shipments in Infor SyteLine: which dates to compare (due, promise, ship), standard reports, and a SQL query for OTD percent.
- Infor VISUAL report builder: build a custom work order reportHow to build and customise reports for Infor VISUAL using Crystal Reports and SQL, with a worked work order report example and the common tables involved.
- Oracle Fusion Manufacturing: Work Order Cannot Complete or CloseWhy an Oracle Fusion Manufacturing work order will not complete or close: open operations, unissued components, pending transactions, cost variances and status holds.
Runs with your ERP
- SAP SuccessFactors Time Tracking with S/4HANA: labor time for payroll and costingHow SAP SuccessFactors Time Tracking feeds time data to S/4HANA payroll and costing for manufacturers: data flows, setup, pitfalls, alternatives and private AI.
- RFgen Mobile Foundations with JD Edwards EnterpriseOne: labor trackingHow RFgen Mobile Foundations adds work-center labor tracking and barcode apps to JD Edwards EnterpriseOne: start/stop time per work order, setup and pitfalls.
- RF-SMART Manufacturing Data Collection with JD Edwards EnterpriseOneHow RF-SMART collects work order completions, labor, lot and serial data and shop floor labels in JD Edwards EnterpriseOne, online or offline: setup, pitfalls.
Guides
- How to Track Actual vs Estimated Hours in a CNC Machine ShopHow CNC job shops track actual versus estimated hours by operation, collect clean labor data, read the variance and feed corrections back into quotes.
- SyteLine Non-Conformance Report (NCR) Management ConfigurationConfigure SyteLine non-conformance report tracking and disposition workflows. Set up NCR creation, investigation, and resolution processes in CloudSuite Industrial.
- How to Configure Lot Tracking in SyteLineStep-by-step guide to setting up lot tracking in Infor SyteLine CloudSuite Industrial, including lot number generation, expiration dates, and FIFO enforcement.
AI on your ERP
- AI agents for NetSuite manufacturing operationsAI agents for NetSuite manufacturing: WIP tracking, routing exceptions, and work order status grounded in SuiteQL, with human approval on anything that writes back.
- AI for SYSPRO production and job costingHow AI reads SYSPRO WIP jobs, labor and material postings to explain job cost variances and late work orders, with read-only access and on-prem hosting.