Epicor planning and scheduling consulting: making MRP and the schedule believable

Most Epicor planning problems are data and parameter problems, not software limits: wrong lead times, missing resource calendars, unfirm jobs piling up and MRP suggestions nobody trusts. Planning and scheduling consulting fixes those foundations first, then decides whether finite scheduling or Epicor's advanced planning add-on is worth it.

When this makes sense

  • Planners who ignore MRP suggestions and plan in spreadsheets instead
  • A plant where the Scheduling Board shows jobs on dates nobody believes
  • Buyers drowning in purchase suggestions for parts that are already on order
  • A company considering Epicor's advanced planning and scheduling module and unsure it is needed
  • Rising late orders after a product mix change or new equipment
  • MRP runs that take hours or fail overnight

What the engagement covers

Part planning parameters

Lead times, minimum and maximum on hand, safety stock, lot sizes, days of supply and the make or buy flag on each part and site.

MRP processing

Regenerative versus net change runs, cutoff and horizon settings, scheduling direction, unfirm job handling and Task Agent scheduling of overnight runs.

Resources and calendars

Resource groups and resources, production calendars, shifts, capacity, queue and move times, and the operations those resources are assigned to.

Global Scheduling and the Scheduling Board

Finite versus infinite load, scheduling priority codes, job priorities and how planners move and lock jobs.

Advanced planning decision

When the APS add-on or a constraint-based tool adds value: sequence-dependent setups, multi-constraint resources, tooling and labor limits.

Planner workflows

Job Manager, Time Phased Material Requirements, PO Suggestions and Generate Purchase Orders, with BAQ dashboards for exceptions.

How it runs

  1. 1

    Planning diagnostic (2-3 weeks)

    • Sample parts and compare parameters with actual lead times
    • Review MRP logs and unfirm job volume
    • Interview planners and buyers
  2. 2

    Data and parameter repair (3-8 weeks)

    • Mass-update lead times and lot sizes via DMT
    • Fix resource calendars and capacities
    • Purge obsolete unfirm jobs and suggestions
  3. 3

    Scheduling design (2-4 weeks)

    • Decide finite or infinite per resource group
    • Set priority rules
    • Pilot Global Scheduling in a test environment
  4. 4

    Adoption (4-8 weeks)

    • Daily planning routine and dashboards
    • Train planners and buyers
    • Measure on-time and suggestion acceptance

What you get

  • Planning parameter audit with recommended values by part class
  • Resource group and calendar model that matches the shop
  • MRP run configuration and schedule with monitoring
  • Planner and buyer exception dashboards built on BAQs
  • Decision memo on APS or finite scheduling
  • Daily and weekly planning routine document

What drives cost and effort

Part count and data qualityTens of thousands of parts with stale lead times need structured mass updates and validation.
Number of sitesMulti-site planning with transfer orders adds supply chain design.
Manufacturing styleMake-to-order job shops, repetitive and mixed-mode plants need different scheduling setups.
APS add-on in scopeAdding advanced planning adds licensing, modeling and training effort.
Planner availabilityParameters can only be validated with planners who know the parts.
Run time and database sizeSlow MRP may need index, purge or hardware work alongside settings.

Fixed-fee diagnostic

Plants that want to know why MRP is not trusted before committing to a fix.

Project with planning lead on site

Companies ready to repair data and redesign scheduling over a few months.

Monthly planning coach

Teams that need ongoing tuning and a second opinion on parameters.

Questions to ask any Epicor consultant

How do you decide between finite and infinite scheduling per resource group?

Finite scheduling everywhere can make a schedule unusable; a good consultant targets true constraints.

How will you set lead times and lot sizes for thousands of parts?

Look for a method using actual receipt and job history, not guesses.

What do you do with existing unfirm jobs and suggestions?

Clean-up strategy determines whether planners see a usable list on day one.

When would you advise against the APS add-on?

An honest consultant explains when Global Scheduling is enough.

How do you measure success?

On-time delivery, suggestion acceptance and expedites per week are real measures; go-live is not.

Have you worked with our manufacturing style?

Engineer-to-order, job shop and repetitive plants behave very differently in Epicor.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Parameters changed in bulk without planner validation

Change by part class with planner sign-off and compare results in a test company.

Finite scheduling of non-constraints pushes every job late

Schedule finite only where capacity truly limits output.

MRP generates noise from obsolete demand

Close old orders and forecasts before tuning.

Planners return to spreadsheets after go-live

Build dashboards for their actual daily questions and review usage weekly.

Overnight MRP run collides with other jobs

Schedule runs in Task Agent around backups and integrations and monitor run times.

If your plant has few constraints and short lead times, a well-tuned MRP with infinite scheduling and a visual board may be all you need; APS can be overkill. If MRP output is ignored because of bad bills of material or inventory accuracy, fix BOMs and cycle counting first. A planner with time and a good admin can do much of this work with targeted coaching.

Frequently asked questions

Why does Epicor MRP generate so many suggestions?

Usually because of wrong lead times, lot sizes, minimum on hand, old demand that was never closed, or unfirm jobs never purged. Fixing these typically reduces suggestions sharply.

Does Epicor do finite capacity scheduling?

Global Scheduling can schedule resources finitely or infinitely, and Epicor offers an advanced planning and scheduling add-on for more complex constraints. Which you need depends on how many real bottlenecks the plant has.

How often should MRP run?

Many plants run a regenerative MRP nightly or weekly and net change runs during the day. The right cadence depends on run time and how fast demand changes.

Can AI help planners?

Netray uses AI agents to explain why a suggestion exists, trace it to demand and flag parameters that disagree with history, using read-only access to Epicor. Planners still decide what to release.

How long does a planning tune-up take?

A diagnostic takes two to three weeks; data repair and scheduling redesign usually take two to four months depending on part count.

Talk to a Epicor consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.