How-toEpicor KineticReporting / SSRS Report Styles

How to Modify an SSRS Report in Epicor Kinetic

Question
how to modify ssrs report in epicor kinetic

Also searched as

  • how to modify epicor kinetic report
  • how to edit epicor printing functionality
  • epicor custom report style ssrs

Short answer

Never edit a standard Epicor report style in place. Download the RDL for the style, edit the copy in Microsoft Report Builder, upload it as a new custom report style with its own ID, then assign that style where the document prints. Keep the RDL in source control so you can reapply or compare it after an upgrade.

Applies to: Epicor Kinetic reports based on SSRS report styles; menu names can differ slightly by release

How to customize an SSRS report style

  1. 1Identify the report and the style it uses in Report Style Maintenance, noting the report ID and style ID.
  2. 2Download the RDL file for that style as your working copy, and save it under a clear custom name.
  3. 3Open the RDL in Microsoft Report Builder (or Visual Studio with the report designer) and edit the layout, text, images and expressions.
  4. 4If you need a field that is not in the data set, add it through a Report Data Definition or BAQ report, not by hacking the RDL.
  5. 5Preview locally if the tool allows, then save the file.
  6. 6In Report Style Maintenance create a new style for the report with your own ID, and upload the edited RDL.
  7. 7Assign the new style to the report or document (for example by customer or as the default) and test the print preview and PDF output.
  8. 8Store the RDL and a note of the changes in source control with the Epicor version it was based on.

Why copy, never edit in place

Standard styles are replaced during upgrades. An edit made directly to one is overwritten or conflicts with the new version. A copy with your own ID is yours: it remains after an upgrade, but it also stops receiving the improvements Epicor makes to the standard style.

That trade-off is the main maintenance cost of report customization. Record what you changed and why, so that after an upgrade someone can compare your copy with the new standard and decide whether to re-apply the changes.

Editing in Report Builder

Report Builder shows the data set fields, the layout and expressions. Most requests are simple: add a logo, move or hide a column, change a title, add a footer. Expressions follow SSRS syntax, so a field is referenced as Fields!FieldName.Value.

Keep changes small and test with documents that have long text, many lines and zero lines, since layout problems appear at the extremes. A report that looks right on a three-line order can break on a three-page one.

=Fields!OrderNum.Value
=IIF(Fields!ShipViaCode.Value = "", "TBD", Fields!ShipViaCode.Value)

Assigning and surviving upgrades

A style does nothing until it is used. Assign it where the document prints so the right customers or processes pick it. Test print preview afterwards, since style errors surface at render time.

Before every upgrade, list your custom styles, back up the RDL, and plan a retest. After the upgrade, print each custom style once and compare to a saved PDF from before.

Try it here, free

Epicor SSRS Report Template Checklist

Open full tool

A pre-release checklist for custom Epicor SSRS reports covering report style, data definition, layout, parameters, security and testing.

Common pitfalls

  • !Editing the standard style directly and losing the change in the next upgrade.
  • !Adding fields to the RDL that are not in the report's data set.
  • !Not testing with long and empty documents.
  • !Not keeping the RDL in source control.
  • !Forgetting to assign the new style so users still print the old one.

How an ERP-grounded AI assistant handles this

An assistant can read the data definition and tell you which fields a report exposes, or draft the SSRS expression you need, for a developer to review. For comparing a custom style with the new standard after an upgrade, an agent can list the differences. Anything that changes a style stays a reviewed change.

Frequently asked questions

Can I edit the standard Epicor report style directly?

You should not. Standard styles are replaced during upgrades. Make a copy with your own style ID and edit that.

What tool do I use to edit an Epicor SSRS report?

Microsoft Report Builder or Visual Studio with the report designer, working on the downloaded RDL file for the style.

How do I add a field that is not on the report?

Extend the report's data definition or base it on a BAQ report so the field is in the data set, then use it in the RDL.

Will my custom report style survive an upgrade?

A copy with its own ID normally remains, but test it after upgrade, since underlying data definitions can change. Keep the RDL in source control.

Related

Error fix

Epicor Kinetic Print Preview Not Working

Epicor Kinetic reports are generated by the task agent and rendered through the report server, so a preview that never appears usually means the job did not complete, the SSRS connection failed, or the browser blocked the result. Check System Monitor first, then the report server settings, then the client.

How-to

Preserving Customizations When Upgrading to Epicor Kinetic

Epicor Kinetic's web UI does not simply inherit classic smart-client customizations - most need to go through the Update Customization / Application Studio conversion process, and some WinForms-specific customizations cannot convert directly and must be rebuilt in the Kinetic designer. Plan the upgrade as a customization inventory and rework project, not a single technical cutover step.

How-to

How to Add a Calculated Field in an Epicor BAQ

In Epicor Query Builder, open the Phrase Build or Calculated Fields area of the Analyze tab or Display Fields, add a new calculated field with a name and a data type, and write a SQL expression that references columns as Table_Column. Guard against NULL and zero divisors, and use a subquery when the value needs its own aggregation.

Advanced

Epicor Application Studio: understanding customization layers

Kinetic UI is built in layers loaded in order - Base (Epicor-delivered), Customization (Application Studio, company/layer-wide), Personalization (user- or role-specific, applied on top), and optionally Extended (packaged add-on layers) - and a change you make will not appear if a higher layer overrides the same control or if you are testing in the wrong layer context.

Error fix

Fixing Epicor BusinessObjectException: BPM Directive Errors

A BusinessObjectException that says "A Business Process Management (BPM) directive has raised the following error" means a directive on that business object stopped the transaction, either deliberately via a Raise Exception widget or accidentally via an unhandled .NET error in Custom Code. Expand the InnerException on the error dialog to see the real message and the directive name, then open BPM Designer for that object and method to find the widget that fired.

How-to

Fixing a Slow Epicor BAQ (Business Activity Query)

A slow BAQ in Epicor is usually caused by unindexed join columns, a subquery or calculated field forcing a table scan, or the BAQ pulling far more rows than the dashboard actually displays before filtering client-side. Fix it by reading the SQL Server execution plan Epicor generates, moving filters into the BAQ criteria instead of the dashboard filter panel, and replacing subqueries with joins where possible.

AI for ERP

AI for Epicor Kinetic, Beyond What Prism Covers

Add AI to Epicor Kinetic beyond Prism: private LLM over BAQs, BPM data, and REST v2, on-prem or private cloud, with honest guidance on when Prism already covers you.

AI for ERP

Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant Boundary

Run a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.

Stuck on Epicor Kinetic?

Talk to engineers who work inside Epicor Kinetic every week, and who build private AI that answers these questions from your own ERP data.

Get Epicor ERP alerts

Support and maintenance deadlines, release changes that affect Epicor ERP sites, and new free Epicor ERP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Epicor ERP: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Comparisons

Software