Epicor SSRS Report Template Checklist
Custom SSRS reports are among the most frequent Epicor changes, and also among the most frequently reworked. Use this checklist before sending a report to Live to catch the problems users usually find first.
0 of 30 items complete
10 critical items still open - these are the highest-risk gaps.
Requirements and setup
Data definition
Layout and formatting
Parameters and runtime
Security and release
Critical items should all be checked before release. Report builder screens and names vary by Kinetic version, so adapt wording to your environment.
Cut down on one-off report requests
Optional: see how a read-only ERP assistant can answer common questions without a new report each time.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Work through the groups in order and tick items as you verify them. Export the completed list to PDF or Excel and attach it to the change request. The groups follow the real order of a report project: agree the requirement, shape the data, design the layout, test parameters and runtime, and then release with security in place. Items marked critical are the ones that most often cause an incident or a rework.
Where reports usually go wrong
Reports break on edge cases more than on the happy path. A line description longer than expected overlaps the next row, a foreign currency order shows the wrong symbol, or a document with fifty lines runs past one page and loses its header. Test with documents that are deliberately awkward: longest description, many lines, foreign currency, zero value lines and missing optional fields. Compare totals with the screen and with a BAQ, not by eye.
- Test the longest description in your data
- Test a multi page document
- Test a foreign currency document
- Test with a user who has limited security
Data definition discipline
The report data definition is the contract between Epicor and the layout. Keep it as small as the report needs, because every extra table slows down the run. Put joins, formulas and filters in the data definition or a BAQ, so the layout only formats. When you add custom fields, refresh the report data and confirm the field arrives with real values, not just the column name.
Security and promotion
A report copy often exposes more than the original, for example unit cost on a quote. Check what each audience sees. Promote through the same change control as any other change and keep the original style available so you can revert. Record who approved the output, as users will quote this version later.
Frequently Asked Questions
Should I edit the standard Epicor report style or copy it?
Copy it. Editing the standard style makes upgrades harder and removes your fallback. Clone the style with a new ID, change the copy, and keep the original available for comparison and rollback.
Why does my SSRS report show no data in Live?
Common causes are a report data definition not refreshed after a change, a parameter filter excluding all rows, missing security on the underlying tables, or a layout referencing a field that is empty in Live. Compare the data set in both environments.
Do I need a BAQ for an SSRS report?
Not always. Standard reports use their own data definitions, but a BAQ is a common way to add joins and calculated fields for a custom data source. Choose whichever keeps the logic in one tested place.
How do I check report totals are correct?
Compare the report total with the transaction on screen and with an independent BAQ or SQL query for the same document. Test at least one multi page and one foreign currency document, since totals often fail there first.
If report requests keep piling up, Netray can discuss a read-only assistant that answers common data questions directly from your ERP so fewer custom reports are needed.
Related Tools
Epicor BAQ Calculated Field Examples Reference
A searchable cheat sheet of BAQ calculated field expressions you can copy into the Query Builder, grouped by dates, quantities, pricing and text.
EpicorEpicor Application Studio Layer Checklist
A checklist for Kinetic Application Studio layers covering naming, scope, events, rules, security, testing and upgrade impact.
EpicorEpicor Table Reference: Erp.Part, Erp.JobHead, Erp.OrderHed
Searchable list of frequently used columns in three core Epicor tables, with type and usage notes for BAQs, reports and REST queries.
EpicorEpicor Customization Migration Estimator
Count your customizations, BPMs, reports and BAQs and get an hours and cost estimate for retesting and rework in an upgrade or Kinetic move.
More Epicor tools
See all- Epicor Kinetic Customization Change Request Form Template
- Epicor Kinetic Go-Live Cutover Plan Template
- Epicor Kinetic User Access Request Form Template
- Epicor Kinetic BPM Directive Inventory Worksheet
- Epicor Kinetic Scheduled Task Register Worksheet
- Epicor Kinetic Custom Report Inventory Worksheet
- Epicor Kinetic Data Migration Mapping Worksheet
- Epicor Kinetic Data Load Effort Calculator
- Epicor Business Object Services Reference
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor Kinetic Custom Report Inventory WorksheetAn editable register of custom reports, BAQs and dashboards to support upgrade testing and clean-up of unused items.
- Epicor Kinetic Upgrade ChecklistA phase-by-phase upgrade checklist covering inventory, testing, integrations, cutover and rollback for Epicor Kinetic.
- Epicor Application Studio Layer ChecklistA checklist for Kinetic Application Studio layers covering naming, scope, events, rules, security, testing and upgrade impact.
ERP fixes and how-tos
- Epicor Kinetic SSRS Reports vs Bold Reports: What Changed and How to MigrateEpicor Kinetic SSRS versus Bold Reports: what changed, how to customize a standard report, and how to plan migrating your custom SSRS reports.
- How to Modify an SSRS Report in Epicor KineticHow to customize an Epicor Kinetic SSRS report: copy the report style, edit the RDL in Report Builder, upload it as a new style, assign it, survive upgrades.
- Epicor Kinetic Print Preview Not WorkingFix Epicor Kinetic print preview failures: SSRS report server, task agent, print settings, popup blockers and permissions, with a step-by-step check order.
AI on your ERP
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
- Epicor Kinetic AI for Aerospace and Defense Suppliers: Traceability, Quality and CUI, On-PremOn-prem AI for aerospace and defense suppliers on Epicor Kinetic: traceability, AS9100 quality, CUI and ITAR handling, and why cloud AI features need care.
Integrations
- How to use ChatGPT with Epicor KineticConnect ChatGPT to Epicor Kinetic through a custom GPT with Actions, an exported dataset, or a private gateway. Covers BAQs, auth, data controls and when to go private.
- How to add AI agents to Epicor KineticHow to add AI agents to Epicor Kinetic: a tool layer over the REST v2 API and BAQs, MRP exception triage, PO expediting, and human approval before any write.
Software
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.