Apparel Style, Color and Size SKU Matrix SQL Generator
An apparel style is sold as a grid of colors and sizes, and every cell needs its own SKU. This generator builds the cross join, inserts only the missing rows and checks the result, so a new style takes seconds instead of hours of typing.
Fill in
Generic name. Replace with your own variant or item table.
SQL Server VALUES syntax, one tuple per color.
Each tuple is size code and sort order.
Preview the matrix before inserting
SELECT 'TS1042' + '-' + c.color_code + '-' + s.size_code AS sku,
'TS1042' AS style_code,
c.color_code,
s.size_code,
s.size_sort
FROM (VALUES ('BLK'),('NVY'),('WHT'),('GRY')) AS c(color_code)
CROSS JOIN (VALUES ('XS',1),('S',2),('M',3),('L',4),('XL',5),('XXL',6)) AS s(size_code, size_sort)
ORDER BY c.color_code, s.size_sort;Insert only the missing SKUs
INSERT INTO dbo.sku_master (sku, style_code, color_code, size_code, size_sort)
SELECT 'TS1042' + '-' + c.color_code + '-' + s.size_code,
'TS1042',
c.color_code,
s.size_code,
s.size_sort
FROM (VALUES ('BLK'),('NVY'),('WHT'),('GRY')) AS c(color_code)
CROSS JOIN (VALUES ('XS',1),('S',2),('M',3),('L',4),('XL',5),('XXL',6)) AS s(size_code, size_sort)
WHERE NOT EXISTS (
SELECT 1
FROM dbo.sku_master x
WHERE x.sku = 'TS1042' + '-' + c.color_code + '-' + s.size_code
);Check for duplicates and count
SELECT sku, COUNT(*) AS copies FROM dbo.sku_master WHERE style_code = 'TS1042' GROUP BY sku HAVING COUNT(*) > 1; SELECT COUNT(*) AS sku_count FROM dbo.sku_master WHERE style_code = 'TS1042';
Table and column names are generic and the VALUES syntax is T-SQL (SQL Server). On Oracle, PostgreSQL or MySQL, replace the VALUES derived table with a UNION ALL list or the equivalent syntax. Run the preview first, test in a non-production database, and map the columns to your own item or variant table. Prefer your ERP's import or API route for production item creation.
Variant creation automation
Optional: a walkthrough of how to automate style and variant creation in your ERP using supported interfaces.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter the SKU table, the style code, the colors and the size run as VALUES lists. The three code blocks update as you type. Run the preview first to see every SKU the matrix will create. If the grid looks right, run the insert, which uses NOT EXISTS so it can be repeated safely when a color or size is added later. Finish with the duplicate check and the count, which should equal colors multiplied by sizes for a fresh style.
- Preview before insert
- Insert skips SKUs that already exist
- Count should equal colors times sizes
- Keep size sort order so grids print in the right sequence
How the SQL works
A cross join pairs every row of one set with every row of another. Two derived tables built with VALUES supply colors and sizes, and the cross join yields every combination, so four colors and six sizes produce 24 SKUs. The SKU string is the style, color and size joined with hyphens. The NOT EXISTS clause compares the generated SKU to the table, which makes the script idempotent and protects against duplicate keys.
Common mistakes and ERP notes
Do not insert directly into an ERP's item tables unless the vendor supports it, because items often have related records, such as unit conversions, costs and planning data, that direct inserts skip. Use this output to stage and validate a load file or to build an import sheet. Also keep size codes consistent, as mixing XXL and 2XL in the same system splits stock and reporting.
- Use the ERP's import or API for production item creation
- Standardize size codes before you generate
- Store size sort order so grids and reports line up
Frequently Asked Questions
What is a SKU matrix in apparel?
A SKU matrix is the grid of every color and size combination for a style. Each cell is a separate stock-keeping unit with its own inventory, barcode and price, so a style with 4 colors and 6 sizes has 24 SKUs.
Can I use this script on Oracle or PostgreSQL?
The structure works, but the VALUES derived table syntax shown is T-SQL. In Oracle, use SELECT FROM DUAL with UNION ALL, and in PostgreSQL the VALUES list works with slightly different alias syntax. Test in a non-production schema first.
How do I add a new size later?
Put only the new size in the sizes list, keep the full color list, and run the insert. The NOT EXISTS check skips existing SKUs, so only the new size column of the grid is created.
Should I insert straight into my ERP item table?
Usually no. ERP items have linked records for units, costing, planning and tax. Use the supported import tool or API, and treat this SQL as a way to build and check the data first.
If creating styles and variants in your ERP is slow or error-prone, we can look at how to automate the matrix creation through supported import routes.
Related Tools
Fabric Roll Barcode Label ZPL Generator
Generate ZPL II code for a 4 inch fabric roll label with item, lot, width, length and a Code 128 roll ID barcode.
Industry TemplatesGarment Tech Pack Specification Template
A fill-in tech pack that gives the sewing floor and the buyer one agreed specification for a style, exportable to PDF or Word.
Industry TemplatesGarment Size Grade Spec Worksheet
An editable size chart that builds S, M, L and XL measurements from a base size and grade increment per point of measure.
Industry TemplatesTextile and Apparel Plant ERP Readiness Assessment
Answer 10 questions about styles, lots, BOMs, routings, costing and traceability to see how ready your plant data is for ERP-driven planning or AI.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
Keep exploring
Free tools
- Textile and Apparel Plant ERP Readiness AssessmentAnswer 10 questions about styles, lots, BOMs, routings, costing and traceability to see how ready your plant data is for ERP-driven planning or AI.
- Garment Costing WorksheetEditable cost sheet for a single style: fabric, trims, cut-make-trim, packing and overhead with wastage per line and a quote price.
- Cutting Order and Lay Plan Sheet TemplateA fill-in cutting order and lay plan for the cutting room: style, fabric, marker, ply count, size ratio and approvals, exported to PDF or Word.
ERP fixes and how-tos
- Conditional Formatting in Infor LN: Grid and Field ColorsCan you color rows or fields by value in Infor LN Web UI grids? What personalization covers, what needs customization, and reporting alternatives.
- Fix Katana and Shopify Inventory Not SyncingKatana stock not updating in Shopify, or Shopify orders missing in Katana? Check SKU matching, locations, variants, and sync direction with this step list.
Guides
- Infor M3 Fashion Edition: Style-Color-Size Matrix, PLM Integration, and Seasonal PlanningConfigure Infor M3 for fashion and apparel. Style-color-size matrix, PLM integration, seasonal planning, and garment costing in M3 Fashion edition.
- Gross Margin Analysis by Product and CustomerGross margin analysis by product and customer: build a contribution model in ERP, allocate freight and rebates, and find the 20 percent of SKUs losing money.
- SyteLine Vendor Price Matrix Setup and ConfigurationConfigure SyteLine vendor price matrix for accurate procurement costing. Set up quantity breaks, effective dates, and currency pricing in CloudSuite Industrial.
AI on your ERP
- AI on Your ERP for Textile and Apparel ManufacturingPrivate AI on your ERP for textile and apparel makers: style-color-size matrices, lot dyeing, cut plans, TNA calendars and buyer compliance, kept on your own systems.
- Infor M3 AI for Fashion and Apparel: Seasons, Sizes and AllocationPrivate AI on Infor M3 for fashion and apparel: style-color-size matrix, season planning, allocation, returns and supplier PO tracking, on-prem or private cloud.