AS9100 Risk and Opportunity Register Worksheet (Clause 6.1)

AS9100 clause 6.1 asks you to plan actions to address risks and opportunities, and clause 8.1.1 adds operational risk management. This register gives you a simple scoring model and an Excel export you can bring to management review.

Free, optional. Reopen it on any device.
Download:
Risk or opportunityTypeProcessSeverity (1-10)Likelihood (1-10)Detection (1-10)Priority numberPlanned actionOwnerDue
160
84
108
60
Highest priority number
160
Items logged
4
Average priority number
103

The priority number is severity times likelihood times detection, the same method used in FMEA. Set your own action threshold, such as 100 or more, in your risk procedure. Opportunities use the same scale for effort and benefit if you prefer.

Connect risks to live ERP data

Optional: talk about surfacing late orders, rejects and overdue calibrations in a live risk view.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the register

List each risk or opportunity against the process it affects. Score severity, likelihood and detection from 1 to 10, and let the sheet calculate the priority number. Sort by the highest numbers, assign an owner and date, and record the action. Revisit the register at least at each management review and after any significant incident or audit finding.

  • Tie each item to a process owner
  • Score using agreed criteria, not gut feel
  • Record planned action and due date
  • Review after incidents and audits

The scoring method

The priority number multiplies severity, likelihood and detection, giving a range of 1 to 1000. Severity reflects the effect on product, delivery or compliance. Likelihood reflects how often it could occur. Detection reflects how well current controls would catch it. A high detection score means weak controls. The number ranks items, it does not prove anything on its own.

Operational risk topics for aerospace

Operational risk management in AS9100 covers areas such as product safety, supplier performance, counterfeit parts, on-time delivery, key resource availability, configuration control and human factors. Make sure your register includes these themes with real examples from your shop, not a generic list copied from a template.

Common mistakes

Registers go stale when they are written once for the audit. Other problems include scoring everything as medium, listing risks with no action, and treating opportunities as an afterthought. Keep the list short enough to maintain and link actions to measurable objectives.

Frequently Asked Questions

Does AS9100 require a risk register?

The standard requires you to determine risks and opportunities and plan actions, and to keep documented information where needed. A register is the most common way to show this, but it is not the only format.

What score needs action?

There is no fixed number. Define a threshold in your procedure, and apply judgment to any item with high severity regardless of the product.

Are opportunities scored the same way?

You can use the same scale for benefit, likelihood and effort, or keep opportunities in a simpler list. What matters is that you decide and record the actions.

How often should I update it?

At least at each management review, and whenever the business changes, such as a new customer, process, supplier or audit finding.

Netray can help feed live ERP data such as late orders and rejections into your risk review so it reflects the real shop floor.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Software

TermsAS9100