Chemical Storage Incompatibility Reference Table
Most chemical storage incidents come from ordinary materials meeting each other: bleach and acid, acid and cyanide, oxidizer and solvent. This table lists common incompatible pairs, what happens on contact and a practical storage action, so you can check your warehouse layout in minutes.
| Material A | Keep apart from | What can happen on contact | Storage action |
|---|---|---|---|
Mineral acids (hydrochloric, sulfuric) | Strong bases (sodium hydroxide, potassium hydroxide) | Violent exothermic neutralization, spattering and heat | Separate cabinets or bunded areas, never share a spill tray |
Hypochlorite bleach | Acids | Releases toxic chlorine gas | Store in different rooms or bunds, label clearly |
Hypochlorite bleach | Ammonia and ammonium compounds | Forms toxic chloramine vapors | Segregate and prohibit shared transfer hoses |
Cyanide salts | Acids | Releases highly toxic hydrogen cyanide gas | Dedicated locked storage, no acids in the same area |
Sulfides | Acids | Releases toxic hydrogen sulfide gas | Keep in separate cabinets, ensure ventilation |
Nitric acid | Organic solvents and organic acids (acetic acid) | Strong oxidation, heat and possible violent reaction or fire | Store nitric acid apart from all organics |
Strong oxidizers (nitrates, peroxides, chlorates) | Flammable liquids and combustibles | Fuel and oxidizer give intense fire that is hard to extinguish | Separate rooms or fire-rated barriers, keep wood shelving away |
Hydrogen peroxide (concentrated) | Organics, metals, metal salts | Catalytic decomposition releasing oxygen and heat, container pressurization | Vented caps, store cool, away from contaminants |
Water-reactive metals (sodium, potassium, lithium) | Water and aqueous solutions | Releases flammable hydrogen and heat, may ignite | Store under mineral oil or inert gas, away from sprinklers and sinks |
Organic peroxides | Heat, amines, acids, reducing agents | Self-accelerating decomposition and fire | Temperature-controlled storage per supplier limits, no stacking |
Azides (sodium azide) | Heavy metals such as copper, lead and their salts | Forms shock-sensitive metal azides | Avoid metal piping and drains, store separately |
Ammonia (anhydrous or aqueous) | Halogens, acids | Violent reaction, toxic and corrosive fumes | Segregate and provide ventilation |
Chlorine gas cylinders | Hydrogen, ammonia, fuel gases | Violent reaction and fire | Separate cylinder bays by distance or fire barrier |
Flammable gas cylinders | Oxygen cylinders | Fire intensifies sharply in oxygen enriched air | Maintain separation distance or a fire-rated wall per local code |
Acetylene | Copper, silver, mercury and their alloys | Forms explosive acetylides | Use approved regulators and fittings only |
Peroxide-forming solvents (diethyl ether, THF) | Air, light and age | Peroxides can accumulate and detonate on concentration | Date on opening, test before distillation, discard on schedule |
Perchloric acid | Organics, dehydrating agents, reducing agents | Explosive perchlorate compounds can form | Dedicated storage with glass or ceramic secondary containment |
Glacial acetic acid | Oxidizing acids, peroxides, nitrates | Heat and violent oxidation of an organic acid | Store with organic acids, not oxidizers |
Hydrofluoric acid | Glass, silicates, strong bases | Attacks glass and releases heat on neutralization | Plastic containers and secondary containment, separate cabinet |
Isocyanates | Water, amines, alcohols | Exothermic reaction and carbon dioxide pressure build-up | Keep sealed and dry, store under dry nitrogen if required |
This is a general screening list, not a complete compatibility matrix. Always consult the SDS section on incompatible materials and your local code on segregation distances.
Storage location hazard check
Share how your ERP bins map to hazard classes and we will suggest simple put-away rules that prevent incompatible storage.
Optional. The tool and every export work without this. No spam.
How to use the table
Search for any chemical or class you store and read across to see what it must be kept away from. Export the filtered rows to Excel and compare them against your storage location map or the ERP warehouse bins where each item is held. Any pair that shares a bin, a spill containment area, a drain or a common transfer hose deserves a documented decision.
- Segregate by hazard class first, alphabetical order never
- Check shared secondary containment and shared floor drains
- Include satellite accumulation points and waste containers
Why segregation beats labeling
Labels help people choose correctly, but segregation protects you when someone gets it wrong, when a forklift hits a rack, or when a sprinkler discharges. The aim is that a leak from one container cannot reach an incompatible one. Distance, separate bunds, fire-rated walls and dedicated cabinets each work in different situations. Where you cannot separate completely, reduce quantities and keep incompatible stock on opposite sides of the room with independent containment.
Common mistakes
Typical errors include storing acids and bases in one cabinet because both are 'corrosives', sharing one spill tray, forgetting that waste streams are also incompatible, and mixing at transfer points through shared hoses or pumps. Another recurring one is ignoring age: peroxide-forming solvents become more dangerous over time. Review the list whenever a new product, a new supplier packaging or a new warehouse layout is introduced.
- Treat waste containers with the same segregation rules
- Review segregation after every layout change
- Train temporary staff on the top five incompatible pairs for your site
Frequently Asked Questions
Is there one official chemical compatibility chart?
No single chart covers every chemical. Public charts, supplier SDS section 10 data and local codes are combined in practice. This list covers common high-consequence pairs and should be extended with your own site materials.
Can acids and bases be stored on the same rack?
It is better not to. They can be in the same room if each has its own containment and a barrier or distance between them, but sharing a shelf or spill tray risks a violent neutralization during a leak.
Are waste containers covered by the same segregation rules?
Yes. Mixed waste is a common cause of incidents because contents may be unknown. Keep waste streams separated by compatibility and label them with the contents and hazards.
Where do I find incompatibility data for a specific product?
Check section 10 of the SDS, stability and reactivity, and section 7, handling and storage. If the information is vague, ask the supplier or run a compatibility study before storing the product near other chemicals.
Netray can help flag incompatible storage in your ERP by linking hazard classes to warehouse locations, so a put-away or transfer order can warn the user before the mistake happens.
Related Tools
NFPA 704 Fire Diamond Rating Criteria Reference
Look up what each 0 to 4 rating means in the blue, red and yellow fields of the NFPA 704 diamond, and what the white-field symbols stand for.
Safety & WorkforceCommon Industrial Solvent Flash Point and Boiling Point Reference
Approximate closed cup flash points, boiling points and derived NFPA flammability class for 30 solvents commonly used in chemical plants.
Safety & WorkforceChemical Plant Pre-Startup Safety Review (PSSR) Checklist
A working PSSR checklist to confirm equipment, procedures, hazard analysis and training are ready before a new or modified process is started.
Safety & WorkforceChemical Inventory and SDS Tracking Worksheet
An editable chemical list for your hazard communication program, with location, quantity, hazard category and SDS revision date.
More Safety & Workforce tools
See all- Process Hazard Analysis HAZOP Worksheet
- Chemical Reactor Adiabatic Temperature Rise Calculator
- Acid Base Neutralization Reagent Dose Calculator
- Chemical Reactor Pre-Charge Checklist
- HAZOP Guide Word and Deviation Reference for Chemical Plants
- Overall Labor Effectiveness (OLE) Calculator
- Hazard Identification and Risk Ranking Worksheet
- Forklift Pre-Shift Inspection Checklist Template
- Forklift Pre-Shift Inspection Checklist
Keep exploring
Free tools
- Chemical Inventory and SDS Tracking WorksheetAn editable chemical list for your hazard communication program, with location, quantity, hazard category and SDS revision date.
- Process Hazard Analysis HAZOP WorksheetA HAZOP-style worksheet with node, parameter, guide word, cause, consequence, safeguards and a simple severity times likelihood risk score.
- HAZOP Guide Word and Deviation Reference for Chemical PlantsCombine HAZOP guide words with process parameters to prompt deviations, with typical causes and consequences to speed up your node discussions.
Guides
- AI-Powered Chemical Manufacturing with Infor M3Optimize Infor M3 for chemical manufacturing with AI. Batch management, formula optimization, regulatory compliance, and yield improvement.
- Infor M3 Chemical Industry Configuration and SetupConfigure Infor M3 for chemical manufacturing with potency tracking, shelf-life management, hazmat handling, and formula-based production setup guidance.
- Process Manufacturing ERP Requirements GuideDefine ERP requirements for process manufacturing. Recipe management, batch processing, quality control, regulatory compliance, and yield optimization.
AI on your ERP
- AI for JD Edwards in Chemicals: Batch Formulas, Hazard Data, and Customer SpecsAI for JD Edwards chemical manufacturers: batch formulas, hazard data, SDS and REACH lookups, lot potency and customer specs, answered privately from live data.
- AI on SAP Business One for Chemical Manufacturers: Formulas, Batches and Safety Data in One PlacePrivate AI on SAP Business One for chemical blenders and formulators: batch attributes, formula costing, SDS and REACH lookups, read-only and on-prem.