NFPA 704 Fire Diamond Rating Criteria Reference Table
The NFPA 704 diamond is the colored four-part sign on tank farms, drum storage rooms and building entrances that tells emergency responders how bad a material is at a glance. This table lists what each 0 to 4 number means so operators and EHS staff can read or assign a diamond without hunting for the standard.
| Diamond field | Hazard | Rating | Summary of criteria |
|---|---|---|---|
Blue (left) | Health | 4 | Very short exposure could cause death or major residual injury, even with prompt medical care. |
Blue (left) | Health | 3 | Short exposure could cause serious temporary or residual injury. |
Blue (left) | Health | 2 | Intense or continued but not chronic exposure could cause temporary incapacitation or possible residual injury. |
Blue (left) | Health | 1 | Exposure would cause irritation with only minor residual injury. |
Blue (left) | Health | 0 | Exposure under fire conditions offers no hazard beyond that of ordinary combustible material. |
Red (top) | Flammability | 4 | Rapidly or completely vaporizes at normal pressure and temperature, or burns readily. Flash point below 22.8 C (73 F) and boiling point below 37.8 C (100 F). |
Red (top) | Flammability | 3 | Liquids and solids that can ignite under almost all ambient conditions. Flash point below 37.8 C (100 F) not meeting rating 4. |
Red (top) | Flammability | 2 | Must be moderately heated or exposed to relatively high ambient temperature before ignition. Flash point at or above 37.8 C (100 F) and not above 93.4 C (200 F). |
Red (top) | Flammability | 1 | Must be preheated before ignition can occur. Flash point above 93.4 C (200 F). |
Red (top) | Flammability | 0 | Will not burn under typical fire conditions. |
Yellow (right) | Instability | 4 | Readily capable of detonation or explosive decomposition at normal temperatures and pressures. |
Yellow (right) | Instability | 3 | Capable of detonation or explosive decomposition but requires a strong initiating source, heating under confinement, or reacts explosively with water. |
Yellow (right) | Instability | 2 | Normally unstable and readily undergoes violent chemical change, but does not detonate. May react violently with water or form potentially explosive mixtures. |
Yellow (right) | Instability | 1 | Normally stable but can become unstable at elevated temperatures and pressures. |
Yellow (right) | Instability | 0 | Normally stable, even under fire exposure, and not reactive with water. |
White (bottom) | Special: W with bar | W | Reacts with water in an unusual or dangerous manner. Do not use water-based extinguishing. |
White (bottom) | Special: oxidizer | OX | Material is an oxidizer and can intensify a fire. |
White (bottom) | Special: simple asphyxiant | SA | Simple asphyxiant gas, limited to nitrogen, helium, neon, argon, krypton and xenon. |
This table summarizes the structure of NFPA 704 ratings for quick reference. NFPA 704 is a copyrighted standard: consult the current edition for the full wording, and assign ratings to specific products from the SDS and your own hazard review.
Hazard data register review
Send us how your hazard data is stored today and we will suggest how to keep ratings and SDS data consistent with your ERP items.
Optional. The tool and every export work without this. No spam.
How to use the table
Use the search box to filter by color, hazard name or rating. Blue is the health hazard on the left, red is flammability at the top, yellow is instability (called reactivity in older editions) on the right, and white at the bottom holds special symbols. To check a label, read the three numbers from the sign, then find the matching rows. To assign one, start from the SDS and the physical properties, then match the flash point and boiling point to the red field criteria.
- Filter by 'Flammability' to see the flash point cut-offs
- Export to Excel to build a tank and room labeling register
- Print the PDF as a quick reference for new operators
How flammability ratings follow flash point
Red ratings are driven by flash point and boiling point. A liquid with a flash point under 22.8 C and a boiling point under 37.8 C, such as diethyl ether, rates 4. Acetone, toluene and most common solvents flash below 37.8 C and rate 3. Combustible liquids that flash between 37.8 C and 93.4 C rate 2, and heavier liquids such as glycol rate 1. Always use closed cup flash point values from the SDS, and remember that a mixture rates as its worst credible hazard, not an average.
Common mistakes
The diamond is a fire-response signal, not a complete hazard communication. It does not replace GHS labels, which cover chronic and environmental hazards, and the two systems use opposite scales: GHS category 1 is the most severe, while NFPA 4 is the most severe. Another frequent error is reusing a pure-material rating for a solution or a heated process stream. Ratings are meant for the material as stored, so a hot or concentrated stream may need its own review.
- Do not copy GHS category numbers into the diamond
- Re-rate dilutions and blends instead of assuming the neat rating
- Check which edition your site and local fire authority follow
Frequently Asked Questions
What do the colors on the NFPA 704 diamond mean?
Blue is the health hazard, red is flammability, yellow is instability or reactivity, and white is for special notices such as OX for oxidizer or W with a bar for water reactive. Each colored field carries a number from 0 for minimal hazard to 4 for severe hazard.
Is NFPA 704 the same as the GHS pictograms?
No. NFPA 704 is a quick emergency-response sign for fixed facilities, while GHS labels and pictograms are the hazard communication system for containers and workplaces. They use different scales, so a GHS category cannot be copied directly into a diamond.
Who assigns the NFPA 704 rating?
NFPA 704 does not publish ratings for individual chemicals. The facility owner or a competent person assigns them from SDS data and the standard criteria, and the local fire authority may review them. Some suppliers print suggested ratings but they are not authoritative.
Does the diamond go on every container?
It is intended for fixed locations such as buildings, rooms, tanks and storage areas, not for shipping packages. Transport uses DOT or UN placards instead, and individual containers carry GHS labels. Many plants use both at storage sites.
If your labels, SDS data and ERP item masters all live in different places, Netray can help you pull hazard data into one controlled register that stays in sync with your inventory.
Related Tools
Common Industrial Solvent Flash Point and Boiling Point Reference
Approximate closed cup flash points, boiling points and derived NFPA flammability class for 30 solvents commonly used in chemical plants.
Safety & WorkforceChemical Storage Incompatibility Reference Table
Look up which chemical classes must be segregated and the hazard created if they mix, with a segregation action for each pair.
Safety & WorkforceHAZOP Guide Word and Deviation Reference for Chemical Plants
Combine HAZOP guide words with process parameters to prompt deviations, with typical causes and consequences to speed up your node discussions.
Safety & WorkforceGHS Hazard Class, Pictogram and Signal Word Reference
Look up which GHS pictogram and signal word go with each hazard class and category, then export the table for training or SDS review.
More Safety & Workforce tools
See all- Process Hazard Analysis HAZOP Worksheet
- Chemical Reactor Adiabatic Temperature Rise Calculator
- Acid Base Neutralization Reagent Dose Calculator
- Chemical Reactor Pre-Charge Checklist
- Chemical Plant Pre-Startup Safety Review (PSSR) Checklist
- Overall Labor Effectiveness (OLE) Calculator
- Hazard Identification and Risk Ranking Worksheet
- Forklift Pre-Shift Inspection Checklist Template
- Forklift Pre-Shift Inspection Checklist
Keep exploring
Free tools
- Fire Extinguisher Selection by Hazard ReferenceFind the right extinguisher class and agent for common factory hazards, and the agent to avoid.
- Chemical Storage Incompatibility Reference TableLook up which chemical classes must be segregated and the hazard created if they mix, with a segregation action for each pair.
- India Plant Pollution Consent and Fire Safety ChecklistA checklist of the consents, records and fire safety items an Indian factory is typically asked about by the pollution control board, fire department and factory inspector.
ERP fixes and how-tos
- Lieferantenbeurteilung in Infor LN: Supplier Evaluation and RatingLieferantenbeurteilung (supplier evaluation) in Infor LN: rating criteria, delivery and quality data, setup and reporting, German and English terms.
- How to Create a BAQ in Epicor KineticCreate a BAQ in Epicor Kinetic Query Builder: pick tables, set joins, display fields, criteria, calculated fields, test, and use it in dashboards and reports.
Runs with your ERP
- Infor WMS Small Parcel Shipping (SPS) and Infor LN: rating, labels, trackingHow Infor Small Parcel Shipping in Infor WMS rates UPS, FedEx and USPS parcels and prints labels alongside Infor LN, M3 and CloudSuite, with setup and pitfalls.
- CloudLeap and Infor LN: ERP-integrated multi-carrier shippingCloudLeap adds carrier selection to Infor ERP such as LN through connectors, APIs and webhooks. Data flows, setup, pitfalls and a private AI layer.
Guides
- NFPA 79 and UL 508A Compliance Checklist for US Custom Machine BuildersA practical NFPA 79, UL 508A and machine safeguarding documentation checklist for US custom machine builders, and how to keep the records tied to each project.
- AI-Powered Chemical Manufacturing with Infor M3Optimize Infor M3 for chemical manufacturing with AI. Batch management, formula optimization, regulatory compliance, and yield improvement.
- The Complete Guide to Hiring SyteLine ConsultantsHire the right SyteLine consultant for your project. Evaluation criteria, interview questions, and red flags when selecting CloudSuite Industrial implementation experts.
AI on your ERP
- AI for Blue Yonder WMS: One Question Across the Warehouse and the ERPConnect a private AI layer to Blue Yonder WMS and your ERP: inventory, task and order questions answered from your own data, on-prem or in your private cloud.
- AI on SAP Business One for Chemical Manufacturers: Formulas, Batches and Safety Data in One PlacePrivate AI on SAP Business One for chemical blenders and formulators: batch attributes, formula costing, SDS and REACH lookups, read-only and on-prem.
Software
- Blue Yonder PlanningBlue Yonder Planning explained: demand, supply and inventory planning modules, ERP integrations, deployment, limitations and alternatives for manufacturers.
- Blue Yonder WMSBlue Yonder WMS explained for manufacturers: capabilities, modules, ERP integrations, trade-offs and alternatives such as Manhattan, SAP EWM and Korber.