Windows Security Event ID Reference for Threat Hunting
A small security team cannot read every log line, so the useful question is which event IDs deserve attention. This reference lists the Windows events most often used to catch intrusions, with the reason each matters.
| Event ID | Log | Meaning | Why it matters |
|---|---|---|---|
1102 | Security | The audit log was cleared | Attackers clear logs to hide activity. Alert on every occurrence. |
104 | System | An event log was cleared | Same intent as 1102 for other logs. |
4624 | Security | An account logged on successfully | Baseline for lateral movement. Check logon type 3 and 10. |
4625 | Security | An account failed to log on | Bursts indicate password guessing or spraying. |
4634 | Security | An account was logged off | Pairs with 4624 to build session length. |
4647 | Security | User initiated logoff | Interactive session end. |
4648 | Security | Logon attempted using explicit credentials | Common with runas, remote admin tools and pass-the-hash tooling. |
4657 | Security | A registry value was modified | Persistence changes. Needs registry auditing enabled. |
4663 | Security | An attempt was made to access an object | File access on sensitive shares when auditing is enabled. |
4672 | Security | Special privileges assigned to a new logon | Marks administrator-level logons. |
4688 | Security | A new process was created | Needs command line auditing for full value. |
4697 | Security | A service was installed on the system | Common for malware and remote execution tools. |
4698 | Security | A scheduled task was created | Frequent persistence method. |
4699 | Security | A scheduled task was deleted | Cleanup after an attack. |
4702 | Security | A scheduled task was updated | Tampering with existing jobs. |
4719 | Security | System audit policy was changed | Attackers disable auditing before acting. |
4720 | Security | A user account was created | Rogue or backdoor accounts. |
4722 | Security | A user account was enabled | Dormant accounts brought back. |
4723 | Security | An attempt was made to change an account password | User initiated password change. |
4724 | Security | An attempt was made to reset an account password | Admin reset. Check who did it. |
4725 | Security | A user account was disabled | Leaver process evidence. |
4726 | Security | A user account was deleted | Account removal or cover-up. |
4728 | Security | A member was added to a security-enabled global group | Watch Domain Admins and similar. |
4732 | Security | A member was added to a security-enabled local group | Watch local Administrators. |
4738 | Security | A user account was changed | Flags such as password never expires. |
4740 | Security | A user account was locked out | Spray or brute force signal. |
4756 | Security | A member was added to a security-enabled universal group | Privileged group changes. |
4768 | Security | A Kerberos authentication ticket (TGT) was requested | Baseline for Kerberos activity. |
4769 | Security | A Kerberos service ticket was requested | Spikes can indicate Kerberoasting. |
4771 | Security | Kerberos pre-authentication failed | Bad passwords against domain accounts. |
4776 | Security | The computer attempted to validate credentials (NTLM) | NTLM use should be rare and explainable. |
4800 | Security | The workstation was locked | Session context for investigations. |
4801 | Security | The workstation was unlocked | Session context for investigations. |
5140 | Security | A network share object was accessed | Share access patterns, detects mass enumeration. |
5145 | Security | A network share object was checked for access | Detailed share and file access, noisy. |
6416 | Security | A new external device was recognized | USB use on machines and engineering stations. |
7045 | System | A new service was installed | High value for ransomware and remote tools. |
4103 | PowerShell/Operational | PowerShell module logging | Pipeline execution details. |
4104 | PowerShell/Operational | PowerShell script block logging | Captures deobfuscated script content. |
1 | Sysmon/Operational | Sysmon process creation | Rich process data with hashes and parent. |
3 | Sysmon/Operational | Sysmon network connection | Process to destination mapping. |
11 | Sysmon/Operational | Sysmon file created | Dropped payloads and ransom notes. |
Many of these events appear only when the matching audit subcategory is enabled by group policy. Test in a lab, size the event log, and forward to a central collector so a compromised host cannot erase the evidence.
Detection set review
Optional review of which events you log and alert on today.
Optional. The tool and every export work without this. No spam.
How to use it
Filter by ID or by phrase such as service, group or cleared. Use the table to decide which audit policies to enable and which events to forward to your SIEM or collector. Start with the handful that are rarely benign: 1102, 104, 4719, 4697, 7045, 4720 and privileged group changes. Add the noisy ones, such as 4624 and 4688, only when you have storage and a use for them.
- Alert on 1102 and 104 every time
- Alert on new services and scheduled tasks on servers
- Review 4728 and 4732 for privileged groups
Make the events exist
Many events are silent by default. Advanced audit policy must enable process creation with command line capture, account management, logon, and policy change subcategories. PowerShell script block logging and Sysmon add depth on hosts that matter, such as ERP and file servers and engineering workstations. Without these settings you have a table of events that never fire.
Plant floor considerations
Engineering workstations, HMI servers and historians often run old Windows versions with small default log sizes. Raise log sizes, forward events off the host and keep a copy outside the plant network where possible. Isolated hosts that cannot forward should have logs collected on a schedule by an approved method.
Common mistakes
Logging everything and alerting on nothing is the main one. A second is alerting on 4625 per event instead of per source and time window, which floods the queue. Count failures per account and source over minutes and alert on thresholds. Finally, do not trust local logs only: ransomware operators clear them.
Frequently Asked Questions
Which event IDs should I alert on first?
Start with cleared logs (1102, 104), audit policy changes (4719), new services (4697, 7045), new accounts (4720) and additions to privileged groups (4728, 4732). They are rare in a healthy environment and high in value.
Why does 4688 show no command line?
Command line capture is off by default. Enable the audit setting that includes command line in process creation events through group policy, then size the log for the volume.
What does logon type 3 or 10 mean in 4624?
Type 3 is a network logon such as a file share, type 10 is remote interactive such as RDP. Unexpected 3 or 10 logons to servers from workstations deserve a look.
Do I need Sysmon?
Not to start. Native events cover a lot. Sysmon adds hashes, parent processes and network connections per process, which helps on the servers and workstations you care about most.
If you want a small, tested detection set for your Windows estate and plant servers, Netray can help build it with your team.
Related Tools
SIEM Failed Logon Detection KQL Query Generator
Fill in a time window and thresholds and get ready-to-paste KQL for Microsoft Sentinel or Log Analytics covering password guessing and common tampering events.
ERP OperationsSIEM Sizing Calculator
Estimate annual SIEM license and storage cost from your events-per-second rate, daily ingest volume, and retention window split across hot and cold storage tiers.
Developer ToolsPowerShell Windows Host Security Audit Script Generator
Produce a read-only script that gathers local administrators, listening ports, installed updates and scheduled tasks from a list of servers into CSV files.
Compliance & ContractsNIST CSF 2.0 Categories Reference for Manufacturers
The six functions and 22 categories of NIST CSF 2.0, translated into a plain example for a factory so you can map your controls quickly.
More Developer Tools tools
See all- Excel Timesheet and Overtime Formula Generator
- Environmental Permit Expiry Alert SQL Generator
- Common OT and ICS Protocol Ports Reference
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
Keep exploring
Free tools
- PowerShell Windows Host Security Audit Script GeneratorProduce a read-only script that gathers local administrators, listening ports, installed updates and scheduled tasks from a list of servers into CSV files.
- SyteLine Event Action Types ReferenceThe 26 action types on the SyteLine Event Actions form, with what each does, the parameters that matter and which ones make a handler wait.
- SCADA Alarm and Event Log AI Assistant Sizing and Value CalculatorEstimate GPUs, index size, hours saved and payback for a private AI assistant over SCADA Alarm and Event Log.
ERP fixes and how-tos
- Error applying security: failed to enumerate objects in the containerFix 'Error applying security: failed to enumerate objects in the container. Access is denied' on Windows folders, including SyteLine install paths.
- How to Send SyteLine Business Event Alerts to Infor Ming.leHow to turn SyteLine business events into Infor Ming.le alerts and notifications: event handlers, ION, recipients, noise control and a decision guide.
- How to use AI on SCADA alarm and event logs without leaving the siteHow to run AI on SCADA alarm journals and event logs on-prem: export paths, ISA-18.2 KPIs, retrieval, local models, read-only limits and rollout.
Guides
- How to Set Up Event Logging in SyteLineConfigure event logging in Infor SyteLine for audit compliance, troubleshooting, and security monitoring including IDO events, user actions, and system alerts.
- How to Configure Event Handlers in SyteLineStep-by-step guide to configuring event handlers in Infor SyteLine for automated responses to data changes, user actions, and system events across your ERP environment.
- SyteLine Event System Customization GuideCustomize SyteLine with the event system. Build event handlers, manage triggers, and extend CloudSuite Industrial without modifying base code.