E-Way Bill Validity Calculator
An expired e-way bill leaves a loaded truck exposed to detention and penalty. Under the GST rules, validity depends on distance and the kind of cargo. This calculator shows the number of days and whether your planned transit fits inside them.
Your numbers
Approximate distance between the places of dispatch and delivery as entered on the e-way bill.
Used only to check whether the plan fits inside the validity.
Your results
Rule summary for general planning. Validity starts from the time of generation of the e-way bill and is counted to midnight of the last day. Check the current CGST rules and notifications, and the portal, for extension and special cases.
Validity days versus distance
Sweeps Distance of movement from 100 to 1500, holding your other inputs fixed.
Dispatch and e-way bill alerts
Optional expert review of expiring e-way bill alerts built from your ERP shipment data.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the distance on the e-way bill and pick regular or over dimensional cargo. The tool returns the validity in days. Add your planned average speed, including driver rests, traffic and loading delays, to see whether you have spare time. If the buffer is thin, plan a Part B vehicle update or extension before expiry.
The rule behind the formula
For regular cargo the validity is one day for every 200 km or part of it. For over dimensional cargo it is one day for every 20 km or part of it. The calculator uses the rounded-up distance divided by the km per day figure. Validity is counted from the time the e-way bill is generated and ends at midnight of the last day.
- 100 km is 1 day, 201 km is 2 days for regular cargo.
- Over dimensional cargo needs far more days for the same distance.
- Extension can be requested within the permitted window around expiry.
Where ERPs fit in
Tally Prime, Busy, SAP Business One India and Zoho Books can raise the e-way bill from the invoice through the portal or a GST suvidha provider. The distance comes from the pincode pair. If the dispatch pincode in the ERP is wrong, the validity and the distance will be wrong too, so keep warehouse addresses clean.
Common mistakes
Generating the bill long before the truck leaves, which burns validity, entering the wrong distance, and forgetting the vehicle change update in Part B when goods are transhipped. Delays from natural calamity or law and order issues have their own extension provisions.
Frequently Asked Questions
How many days is an e-way bill valid for 500 km?
For regular cargo, 500 km rounds up to three blocks of 200 km, so the validity is 3 days from generation. For over dimensional cargo the same distance would need 25 days.
When does the validity period start?
It is counted from the time the e-way bill is generated, and expires at midnight of the last day. Generate it close to the actual dispatch time.
Can I extend an e-way bill?
Yes, the transporter or generator can request an extension on the portal in the permitted window around expiry when goods cannot reach in time, with a reason. Check the current rules for the window.
Does it apply to all goods?
E-way bills are generally required for movement of goods above the notified value, with exemptions for some goods and cases. The validity rules above apply once one is required.
If your dispatch team needs alerts for e-way bills close to expiry, Netray can discuss a read-only report over your ERP shipment data.
Related Tools
Monthly GST Compliance Checklist for Indian Manufacturers
A month-end GST routine for Indian plants covering sales, purchases, ITC, job work, e-way bills and return filing.
Country & TaxIndia GST State Codes Reference
Two-digit GST state codes for every state and union territory, to check GSTINs and set place of supply in your ERP.
Country & TaxIndia GST Return Due Dates Reference
Searchable table of GST returns, who files them and the usual due date, for Indian manufacturers and accountants.
Developer ToolsGSTIN Validator Code Generator
Get a Python function that checks GSTIN structure, state code and the mod 36 checksum character before you save a party.
More Country & Tax tools
See all- India Import Landed Cost Calculator (BCD, SWS, IGST)
- Tally Prime Manufacturing Journal Checklist
- Tally Stock Item Import Template (Excel)
- Busy Accounting GST Setup Checklist
- GST Tax Invoice Format Template for Indian Manufacturers
- Delivery Challan Format Template for Goods Movement in India
- Purchase Order Format Template for Indian Manufacturers
- Job Work Challan Register and ITC-04 Worksheet
- TDS Deduction Tracker Worksheet for Vendor Payments
Keep exploring
Free tools
- E-Way Bill Requirement Checklist (India)A practical pre-dispatch checklist for e-way bills: value limits, mandatory data, vehicle details, validity, extension and cancellation.
- E-Way Bill Bulk Upload JSON Generator (India)Fill in the invoice, parties, vehicle and one item line to produce the JSON structure used for bulk generation of e-way bills.
- SAP B1 Implementation Cost CalculatorEnter users, rates and effort days to see first-year and three-year SAP Business One cost, using your own partner quotes.
ERP fixes and how-tos
- SAP Business One production process flow: from BOM to production order to receiptThe SAP Business One production process flow from bill of materials to production order, issue, receipt and close, with the reports and tables used.
- What is the latest version of SAP Business One, and how to plan an upgradeHow SAP Business One is versioned (10.0 plus quarterly feature packages), how to find the current one, and a practical upgrade checklist for on-prem setups.
Integrations
- How to add WhatsApp to SAP Business OneHow to add WhatsApp to SAP Business One: Service Layer, Cloud API templates, opt-in rules, order status, delivery alerts and two-way replies into documents.
- How to add AI agents to SAP Business OneHow to put AI agents on SAP Business One: Service Layer tool design, read-only first, draft documents for human approval, and an on-prem model option.