EDI AS2 Connection Parameters Request Template
Before any EDI file moves over AS2, both sides must agree on identifiers, URLs, certificates and security options. A single wrong AS2 ID or an expired certificate stops the connection. This form collects every parameter in one document you can send to the partner and file afterwards.
Fill in
EDI AS2 Connection Parameters Request Template
AS2 Connection Parameters
Prepared by: Acme Precision Ltd Trading partner: Northwind Retail Date: 2026-10-20
Identifiers and endpoints
| Parameter | Our value | Partner value |
|---|---|---|
| AS2 ID | ACMEPRECISION | NORTHWINDEDI |
| Receive URL | https://as2.acme.example:4080/as2/receive | https://as2.northwind.example/as2/inbound |
| Technical contact | Rahul Mehta, edi@acme.example, +1 555 0100 | |
| Emergency contact |
Security and message options
| Option | Agreed setting |
|---|---|
| Signing algorithm | SHA-256 |
| Encryption algorithm | AES-256 |
| MDN receipt | Synchronous signed |
| Compression | None |
| Content type | application/edi-x12 or application/edifact |
| TLS version | TLS 1.2 or higher |
| Filename in header |
Certificates
Our public certificate expires: 2027-09-30
Exchange public certificates only, never private keys. Confirm the signing certificate, the encryption certificate and any intermediate certificates. Agree on a renewal notice period so both sides can update before expiry.
Network access
Source IP addresses that will connect to the partner: 203.0.113.10 203.0.113.11
Partner source IP addresses to allow on our firewall: (to be provided by partner)
Test and go-live
| Step | Owner | Date | Done |
|---|---|---|---|
| Exchange certificates | |||
| Connectivity test | |||
| Signed and encrypted test file | |||
| MDN received and verified | |||
| Production cutover |
Approvals
This form records agreed settings only. Exchange certificates through a secure channel and never send private keys or passwords on this form. Confirm algorithms against your own security policy and the partner's guide.
Review your AS2 and certificate setup
Optional: ask for a second pair of eyes on connectivity and certificate management.
Optional. The tool and every export work without this. No spam.
How to use the form
Fill in your own values, export to PDF or Word and send it to the partner's technical contact, asking them to complete the second column. AS2 IDs are case sensitive in many products, so copy them exactly. Agree on signing, encryption and MDN type before testing, because mismatches show up as vague decryption or verification failures. Use the test and go-live table to track who does what.
- AS2-From and AS2-To must match each side's configuration exactly
- Decide synchronous or asynchronous MDN before testing
- Record certificate expiry dates and set reminders
What each parameter does
The AS2 ID identifies each partner in the message headers. The receive URL is where the other side posts messages. Signing proves the sender and integrity, encryption protects content in transit, and the MDN is the receipt that confirms the message arrived and, if signed, was not altered. SHA-256 and AES are the usual modern choices, while SHA-1 and 3DES remain only for legacy partners. TLS on the transport is a separate layer.
Certificate management
Expired certificates are the most common cause of sudden AS2 outages. Put every certificate expiry into a shared calendar at least 60 days ahead. Agree how renewals are exchanged and whether the partner supports two active certificates during a changeover. Public certificates only should ever travel by email or portal. Store private keys in your integration platform's key store with restricted access.
Common mistakes
Wrong IP allow lists, a firewall that blocks the inbound port, mismatched MDN modes and sending the wrong certificate (signing instead of encryption) cause most failed first tests. Another is forgetting that load balancers can alter source addresses. Test with a small file first, then with a realistic one.
Frequently Asked Questions
What is an AS2 ID?
It is the name each party uses to identify itself in AS2-From and AS2-To message headers. IDs are agreed between partners, are often case sensitive and should be unique for each trading relationship.
What is an MDN in AS2?
A Message Disposition Notification is the receipt returned after a message is received and processed. It can be signed to prove the content arrived intact. Sync MDNs return on the same connection, async MDNs return later to a separate URL.
Which hash and encryption should I choose?
Choose what your partner supports from the stronger options, typically SHA-256 for signing and AES-128 or AES-256 for encryption. Avoid SHA-1 and 3DES unless a legacy partner insists, and follow your security policy.
Can I send private keys with this form?
No. Only public certificates should be exchanged. Private keys must stay inside your own key store and never travel by email, chat or forms.
Netray can help review your integration platform's AS2 setup and certificate calendar if your partner connections are managed ad hoc.
Related Tools
EDI Partner Test Plan and Sign-Off Template
A test plan document with cases for inbound and outbound transaction sets, pass criteria and go-live sign-off for a new trading partner.
ERP OperationsEDI Error Escalation Runbook Template
A runbook defining what counts as an EDI incident, who responds, how fast, and how to resend and communicate with trading partners.
Supply Chain & InventoryEDI Routing Guide Requirements Matrix Worksheet
Summarize each customer's vendor guide: documents required, ASN timing, label standard, pack rules and routing, so the team works from one table.
Supply Chain & InventoryEDI 997 Functional Acknowledgment Reject Log Worksheet
Log every rejected or partially accepted 997 with the AK3/AK4 error, root cause, owner and resend status, and export it to Excel.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
Keep exploring
Free tools
- EDI VAN vs AS2 Cost Comparison CalculatorModel VAN per-kilocharacter billing against a flat AS2 setup and find the volume where moving off the VAN pays back.
- EDI Trading Partner Setup ChecklistA practical checklist for onboarding a new EDI trading partner from first contact through go-live and monitoring.
- EDI Trading Partner Onboarding Cost CalculatorSize the effort and cost of onboarding a batch of EDI partners and see how much map reuse saves.
ERP fixes and how-tos
- How to Set Up an EDI Trading Partner in Plex SystemsHow to configure a new EDI trading partner in Plex EDI Data Manager, map document types like 850, 830, 862, and 856, and test before going live.
- Infor ION API Connection Point and Enterprise Connector SetupHow to set up an API connection point and an enterprise connector in Infor ION, and what changes between cloud and on-premise deployments.
Runs with your ERP
- B2B for Oracle Integration with Fusion Cloud ERP: Native EDIOracle Integration B2B gives Fusion Cloud ERP trading-partner management and AS2/AS4 adapters for EDI. Data flows, setup steps, pitfalls and AI layer notes.
- Infor EDI Managed Service and Infor M3 over IONHow Infor's EDI managed service connects to Infor M3 through ION with pre-built trading partner links: data flows, setup steps, pitfalls and a private AI layer.
- 1 EDI Source EDI Integration with Infor VISUALHow 1 EDI Source connects Infor VISUAL to trading partners for EDI orders, invoices and ship notices via ION or direct API: setup, pitfalls and private AI.
Guides
- Infor SyteLine EDI Integration GuideIntegrate EDI with SyteLine CloudSuite Industrial. Trading partner setup, transaction mapping, AS2 configuration, and EDI compliance for manufacturers.
- EDI Implementation for Manufacturers: A Practical GuideEDI implementation for manufacturers: map 850, 856, and 810 transactions to your ERP, pick a VAN or AS2, and go live with trading partners in 90 days.
- How to Configure SyteLine EDI Trading PartnersLearn how to set up EDI trading partners in SyteLine CloudSuite Industrial. Configure EDI document types, partner profiles, transaction sets, and automated processing rules.