European E-Invoicing Formats and Networks by Country: ERP Planning Table
E-invoicing in Europe is not one format. It is a family of national schemas, a common semantic model (EN 16931) and the Peppol network. This table helps ERP teams for European manufacturers see which output formats and delivery channels they need per country before scoping the work.
| Country or scope | Format or channel | Syntax | Delivery channel | Typical scope |
|---|---|---|---|---|
EU wide | EN 16931 semantic model | UBL or UN/CEFACT CII | Not a channel | Core standard under Directive 2014/55/EU for public buyers |
EU and beyond | Peppol BIS Billing 3.0 | UBL 2.1 | Peppol network (4 corner model) | B2G and increasingly B2B |
Germany | XRechnung | UBL or CII | Email, portals, Peppol | B2G; B2B structured invoice receipt required |
Germany | ZUGFeRD | PDF/A-3 with embedded CII XML | Email, EDI | B2B and B2G hybrid invoice |
France | Factur-X | PDF/A-3 with embedded CII XML | Certified platforms | B2B reform, phased introduction |
France | Chorus Pro | Factur-X, UBL, CII | Chorus Pro portal | B2G, mandatory |
Italy | FatturaPA | XML (national schema) | SdI exchange system | B2B, B2G and B2C, mandatory |
Spain | Facturae | XML (national schema) | FACe portal | B2G, mandatory above thresholds |
Austria | ebInterface | XML (national schema) | Unternehmensserviceportal, Peppol | B2G, optional B2B |
Netherlands | SI-UBL / NLCIUS | UBL | Peppol, SimplerInvoicing | B2G; B2B optional |
Belgium | Peppol BIS Billing 3.0 | UBL 2.1 | Peppol | B2G; B2B mandate from 2026 |
Denmark | OIOUBL / Peppol | UBL | NemHandel, Peppol | B2G, mandatory |
Sweden | Peppol BIS Billing 3.0 | UBL 2.1 | Peppol | B2G, mandatory for public buyers |
Norway | EHF (Peppol BIS) | UBL | Peppol | B2G, mandatory |
Poland | KSeF structured invoice | XML (FA schema) | KSeF national platform | National system, phased mandate |
Mandates and dates differ by country and are changing; this table describes formats and channels, not legal obligations or deadlines. Confirm current rules with your tax adviser and your ERP vendor's localization documentation before you commit to a project plan.
E-invoicing scope check
Optional: share your country list and we will outline the formats and routing fields your ERP must support.
Optional. The tool and every export work without this. No spam.
How to use the table
List the countries in which your legal entities issue or receive invoices, then filter the table by each country and note the format, syntax and channel. The result is a short requirements list for your ERP project: which XML schemas the system must produce, which must it read, and which access points or portals you must connect to. Export the filtered rows to Excel and add owner, vendor module and test date columns.
Semantic model, syntax and channel
Three layers get confused. EN 16931 is the semantic data model: which business terms an invoice carries. UBL and CII are two syntaxes that express that model in XML. XRechnung, Peppol BIS and Factur-X are profiles or containers that constrain the model for a community. The channel is how the file travels: email, a national portal, or the Peppol network. A good ERP localization states clearly which layer each feature covers.
Hybrid versus pure XML
ZUGFeRD and Factur-X are hybrid: a readable PDF/A-3 with an embedded XML file, so a human and a machine read the same document. XRechnung, FatturaPA and Facturae are pure XML, and the visual copy is generated separately. For a manufacturer with many small European customers who still expect a PDF, hybrid formats ease the transition; for public sector customers pure XML is usually required.
- Check whether your ERP produces the XML natively or relies on an add-on.
- Check inbound: can the system read and post supplier e-invoices?
- Plan archiving of the original XML for statutory retention periods.
- Test with the validator of each community, not only your own checks.
Common mistakes
Teams often scope only outbound invoices and forget inbound, credit notes, corrections and cancellations, each of which has format specific rules. Another common issue is mapping buyer references: a German public buyer needs a Leitweg-ID, an Italian customer needs a destination code, and a Peppol recipient needs an endpoint ID. Capture these routing fields in the customer master early.
Frequently Asked Questions
Is XRechnung the same as ZUGFeRD?
No. XRechnung is a pure XML profile of EN 16931, mainly used for German public buyers. ZUGFeRD is a hybrid with a PDF/A-3 and embedded XML. Recent ZUGFeRD versions contain a profile that is compatible with XRechnung, but the container differs.
Do I need Peppol if my ERP already makes UBL files?
A UBL file is only a format. Peppol adds a network, addressing and access points. If customers require delivery through Peppol, you need an access point, either through your ERP vendor, a service provider or your own certified connection.
Does the table show when e-invoicing becomes mandatory?
No. Dates are being adjusted in several countries and differ for issuing and receiving. The table describes formats and channels so you can plan the technical scope. Take deadlines from the national authority or your tax adviser.
Which format should a manufacturer choose for German B2B customers?
Ask what the customer can process. Many accept ZUGFeRD or XRechnung. The key point is that the invoice must be structured and compatible with EN 16931. Align format, profile and archiving with the customer and your tax adviser.
Netray can map your current invoice output and customer routing data against the formats you need, using a read-only extract, so your localization estimate starts from facts.
Related Tools
EU VAT ID Number Format Reference
Format patterns for EU VAT numbers by country, ready to turn into validation rules in your customer and supplier master.
Country & TaxEU VAT Standard Rates Reference for ERP Setup
Search the standard VAT rate of every EU member state, with ISO codes and the VAT prefix, before you build tax codes in your ERP.
ERP Migration & SelectionERP Localization Gap Register Worksheet
Log each country requirement, how the ERP covers it, the effort in days and the cost, and see the total gap cost at a glance.
Developer ToolsExact Online REST API URL Builder
Generate Exact Online REST API GET requests with the right regional host, division, entity and OData-style query options.
More Country & Tax tools
See all- EU Intrastat Threshold Monitoring Worksheet
- EU ViDA E-Invoicing Readiness Checklist
- Intrastat Nature of Transaction and Transport Mode Codes Reference
- Tally Prime Manufacturing Journal Checklist
- Tally Stock Item Import Template (Excel)
- Busy Accounting GST Setup Checklist
- GST Tax Invoice Format Template for Indian Manufacturers
- Delivery Challan Format Template for Goods Movement in India
- Purchase Order Format Template for Indian Manufacturers
Keep exploring
Free tools
- Latin America E-Invoicing and Tax ID ReferenceOne table of tax ID names, formats, e-invoice document names, authorities and VAT names for the main Latin American manufacturing markets.
- SAP Tables for Plant, Country, Project and Business PartnerLook up the SAP table behind a plant, country, project or partner, with key fields and the join you need next.
- Country of Origin Determination WorksheetCalculate regional value content with the transaction value and net cost methods and test it against your required threshold.
ERP fixes and how-tos
- Format Codes in Infor LN: Data Formats and MasksWhat format codes and display formats mean in Infor LN, how domains use them to show numbers, dates and codes, and how to change a format without breaking data.
- SYSPRO 8: What Is E-Invoice, the 8 Client, and GL IntegrationWhat an e-invoice is in SYSPRO 8, how the SYSPRO 8 client is deployed, and how GL integration works per module and what to check after moving from SYSPRO 7.
- Setting up Electronic Reporting (ER) formats in D365 Finance and OperationsHow to configure the Electronic Reporting (ER) framework in D365 Finance and Operations: configuration providers, model mapping, format designer, and generating output.
Runs with your ERP
- Sovos Indirect Tax Suite with SAP ERP and S/4HANAHow the Sovos Indirect Tax Suite works with SAP ERP and S/4HANA for VAT determination, e-invoicing mandates and VAT filing. Setup, pitfalls and AI ideas.
- SEEBURGER Business Integration Suite and SAP S/4HANAHow SEEBURGER's SAP-certified S/4HANA connector handles EDI, e-invoicing, MFT and APIs, including moving ECC EDI during migration. Setup, pitfalls, AI.
- Thomson Reuters ONESOURCE Indirect Tax with Oracle E-Business SuiteHow Thomson Reuters ONESOURCE Indirect Tax and Pagero e-invoicing work with Oracle EBS, JD Edwards and natively in Fusion: flows, setup and pitfalls.
Guides
- Infor LN Localization and Compliance by CountryInfor LN compliance across countries: localization packs, e-invoicing mandates, VAT and Intrastat, plus ITAR and DFARS in multi-country LN for buyers.
- LLM Quantization Formats Compared: AWQ, GPTQ, FP8, and GGUFAWQ vs FP8 for LLM serving: FP8 is the default on H100/H200/B200, AWQ fits A100 or tight memory. Compare memory, quality loss, and speed, plus GPTQ and GGUF.