India Gratuity Calculator for Factory Employees
Gratuity is a lump sum an establishment pays when an employee leaves after long service. This calculator applies the statutory 15/26 formula so a plant HR or accounts team can estimate the payout or the annual provision in seconds.
Your numbers
Basic plus dearness allowance only. Do not include HRA, bonus or overtime.
More than 6 months is counted as a full year.
Currently Rs 20,00,000 under the Act. Check the latest notification.
Your results
Estimate for planning and provisioning. Employment contracts, state rules and the latest notified ceiling govern the actual amount. Consult your labour law adviser.
Gratuity payable vs completed years of service
Sweeps Completed years of service from 1 to 40, holding your other inputs fixed.
Automate your year-end gratuity provision
We can build a read-only report from your ERP HR and payroll data to estimate the accrual by employee.
Optional. The tool and every export work without this. No spam.
How to use the gratuity calculator
Enter the last drawn Basic plus DA, the completed years of service and any extra months. The tool rounds service up when the extra months exceed six, checks the five-year eligibility condition and applies the ceiling. The chart sweeps completed years so you can see how the liability grows as long-serving operators and supervisors approach retirement.
- Use Basic plus DA only, not gross pay
- Set the ceiling to the latest notified figure
- Enter 0 extra months when the exit falls on an anniversary
The formula behind it
For employees covered by the Act, gratuity equals last drawn wage multiplied by 15, divided by 26, multiplied by completed years of service. The 26 reflects working days in a month and the 15 is fifteen days of wages per year. Employees not covered by the Act, such as some establishments with fewer than ten staff, use 30 days as the divisor under the usual ex-gratia method.
Worked example
A machinist with Basic plus DA of Rs 32,000 and 12 years 7 months of service counts as 13 years. Gratuity is 32,000 x 15 / 26 x 13 = Rs 2,40,000 approximately. The amount sits well below the Rs 20,00,000 ceiling, so the full figure is payable. Run the chart to see that 25 years at the same wage yields roughly Rs 4,61,500.
Common mistakes and ERP notes
The most frequent error is using gross salary instead of Basic plus DA, which overstates the provision. The second is forgetting that the wage at exit, not the average, drives the formula, so annual revisions raise the whole accrued liability. In SAP, Oracle or SyteLine payroll, keep a separate accrual account and refresh it each year-end from headcount and wage data.
Frequently Asked Questions
Who is eligible for gratuity in a factory?
An employee who has completed five continuous years of service is eligible on retirement, resignation, superannuation, death or disablement. In case of death or disablement the five-year condition does not apply. The Act covers factories, mines, plantations and other notified establishments.
Is gratuity taxable?
For employees covered by the Act, gratuity is exempt from income tax up to the lower of the statutory ceiling, the formula amount and the actual amount received, subject to the latest income tax rules. Amounts above that limit are taxable as salary. Confirm with your tax adviser.
Which wage is used in the formula?
Last drawn Basic salary plus dearness allowance. Commission on sales is included if it is part of wages. HRA, overtime, bonus and one-off allowances are excluded from the wage used in the gratuity formula.
Does the employer need to pay interest on delay?
Yes. The Act requires payment within 30 days of it becoming due. If the employer delays, simple interest at the notified rate is payable from the due date, unless the delay is justified by the employee's own fault.
If you want year-end gratuity provisioning pulled automatically from your ERP payroll and HR tables, we can build a read-only report on your own data.
Related Tools
India Statutory Bonus Calculator (Payment of Bonus Act)
Annual statutory bonus per employee from wage ceiling, minimum wage, months worked and the bonus percentage, with a rate sweep chart.
Safety & WorkforceIndia Factory Overtime Wage Calculator (Section 59)
Overtime pay at the statutory multiple for factory workers, with plant-level monthly cost and a sweep of overtime hours.
Country & TaxEmployer PF and ESI Cost Calculator
Compute the statutory employer cost, employee deductions and take-home for one employee, with a chart across gross salary.
Safety & WorkforceIndia Wage Slip Template for Factory Workers
Fill-in wage slip with earnings, overtime, PF, ESI and net pay, formatted for printing or export.
More Country & Tax tools
See all- Gratuity Calculator for Indian Manufacturing Employees
- India Export Documents Reference for Manufacturers
- India Inverted Duty Structure GST Refund Calculator
- India Industrial Electricity Bill Calculator with Demand Charges
- India EPCG Export Obligation Tracker Worksheet
- Tally Prime Manufacturing Journal Checklist
- Tally Stock Item Import Template (Excel)
- Busy Accounting GST Setup Checklist
- GST Tax Invoice Format Template for Indian Manufacturers
Keep exploring
Free tools
- Gratuity Calculator for Indian Manufacturing EmployeesCalculates gratuity on the 15 days per year formula with the divisor of 26 working days, service rounding and the statutory ceiling, with a service-length chart.
- UAE End of Service Gratuity CalculatorEstimates statutory gratuity for a UAE mainland employee from basic salary and completed service, applying the 21 and 30 day bands and the 24 month cap.
- India Factory Statutory Compliance Calendar WorksheetAn editable month-by-month calendar of recurring statutory filings for an Indian manufacturing unit, with owner, due day and status columns.