Medical Device Change Control Request Template
Changes to a medical device or its process must be identified, reviewed, verified, approved and documented before implementation. This request form captures the change and the questions that reviewers must answer.
Fill in
Medical Device Change Control Request Template
Change Control Request
Company: Acme Medical Devices Inc. Request No: ECR-2026-118 Date: 2026-10-20 Requestor: J. Alvarez, Manufacturing Engineering Change type: Design
Change Description
Affected items: Part 200-014 housing, drawing rev C to D
Change housing wall thickness from 1.6 mm to 1.8 mm to reduce cracking during sterilization cycles.
Reason: Three complaints and one CAPA (CAPA-0231) for housing cracks after EO sterilization.
Impact Assessment
Regulatory impact: To be determined Risk management file: Review hazard H-07 (structural failure); update risk management file if controls change. Verification or validation: Repeat drop test DVP-0042 and re-run EO sterilization compatibility on 3 lots. Existing stock: Use up
Impact Checklist
| Area | Affected (Y/N) | Owner | Action |
|---|---|---|---|
| Design history file | |||
| Labeling and IFU | |||
| Process validation | |||
| Supplier quality agreement | |||
| Training |
Approvals
Starting point, not legal or regulatory advice. Determining whether a change needs a new submission depends on your market and device class, so follow your procedure and regulatory guidance.
Connect change requests to ERP ECOs?
Optional review of linking quality change records to ERP engineering changes.
Optional. The tool and every export work without this. No spam.
How to use the form
Describe the change and its reason in plain terms, and reference the complaint or CAPA that triggered it if one exists. The impact assessment is the core of the form: ask whether regulatory status, the risk file, verification and validation, labeling, suppliers and training are affected. Send it to each function for sign-off, then export to PDF or Word. Implementation should only start after approval.
Regulatory background
ISO 13485 clause 7.3.9 requires design changes to be identified, reviewed, verified, validated as appropriate, and approved before implementation, including evaluation of the effect on constituent parts and product already delivered. Under 21 CFR 820.30(i) in the US, and equally for production and process changes, the evaluation must consider whether a new submission or notification is needed.
- Assess regulatory impact before approval
- Update the risk file where hazards or controls change
- Decide disposition of stock and WIP
- Record the effectivity date or lot
Common mistakes
Treating small changes as exempt is the common failure, such as a new supplier for a molded part or a cleaner switch, which can change biocompatibility or validated cleaning. Others forget to include labeling and training. Decide against documented criteria whether a change is minor, and keep the rationale on record.
Frequently Asked Questions
Is every change a design change?
No. Process, supplier, labeling, software and document changes also need control. Your procedure should define categories and the approvals each category needs.
When is a new 510(k) needed?
It depends on whether the change could significantly affect safety or effectiveness, or is a major change to intended use. FDA publishes guidance on assessing modifications. Document your assessment either way.
Who must approve?
At minimum engineering, quality and regulatory, plus operations where manufacturing changes. Set the list in your procedure.
What about emergency changes?
Define an expedited route with after-the-fact documentation and the same assessment, never a bypass without records.
If change requests live in email and ERP engineering change orders separately, Netray can help connect them. Ask for a short review.
Related Tools
Medical Device Design Verification Protocol Template
Fill-in design verification protocol with objective, samples, test method, acceptance criteria, deviations and approval lines.
Engineering & PLMMedical Device Design Input Traceability Matrix Worksheet
Editable traceability matrix linking each design input to its design output, verification, validation and risk control.
Compliance & ContractsMedical Device Post-Market Surveillance Plan Template
Plan template covering data sources, analysis methods, trend triggers and reporting for post-market surveillance.
Quality & InspectionMedical Device Supplier Evaluation Scoring Worksheet
Weighted scoring of critical and non-critical suppliers with approval status, for ISO 13485 clause 7.4 purchasing controls.
More Engineering & PLM tools
See all- Design History File Index Template
- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Obsolescence Exposure Calculator
- SAP Engineering Change Affected Materials Impact Worksheet
Keep exploring
Free tools
- SyteLine Change Request Form TemplateA change control form for SyteLine configuration, customization, patch and integration changes with impact analysis and rollback plan.
- Medical Device Design Input Traceability Matrix WorksheetEditable traceability matrix linking each design input to its design output, verification, validation and risk control.
- Medical Device Complaint Handling Form TemplateA complaint intake and investigation form for medical devices, covering product details, event description, reportability assessment and closure.
ERP fixes and how-tos
- Engineering Change Impact on Open OrdersHow to find every work order, purchase order, stock position and customer order touched by an engineering change before you release it, and decide dispositions.
- Infor LN Reports Stuck in the Print Queue: Device and Spooler FixInfor LN reports sit in the print queue and never print when a device goes offline. Check the device definition, the spooler, and fix the queue fast.
Guides
- AI Review of Medical Device RFQs and Supplier Quality AgreementsUse private AI to read medical device RFQ packages and supplier quality agreements: extract validation, traceability, labeling and change control obligations.
- Medical Device ERP: What ERP for Medical Device Manufacturers Must DoMedical device ERP explained: what ERP for medical device manufacturers must do for DHR, lot and UDI traceability, Part 11, QMSR and ISO 13485, and how to choose.
- ISO 13485 ERP Requirements for Medical Device Contract ManufacturersWhat ISO 13485 and FDA QMSR actually require of an ERP at a medical device contract manufacturer: records, traceability, change control and software validation.
AI on your ERP
- AI on Infor SyteLine for Medical Device Manufacturers: Genealogy, DHR and Audit EvidencePrivate AI on Infor SyteLine for medical device makers: lot and serial genealogy, DHR assembly, UDI and QMSR evidence, with human approval on every write.
- AI on SAP Business One for Medical Device Manufacturers: Traceability and Records Retrieval Without Touching the Validated StatePrivate AI on SAP Business One for medical device manufacturers: UDI, lot and serial traceability, supplier records, DHR retrieval. Read-only, on-prem, QMSR-aware.
Manufacturing hubs
- Medical Device Manufacturing in Minneapolis-St. PaulMedical device manufacturing in Minneapolis-St. Paul: ecosystem, FDA and ISO 13485 requirements, and ERP, quoting and document problems contract makers face.
- Salt Lake City, Utah manufacturing: aerospace composites and medical devicesGuide to Salt Lake City and Wasatch Front manufacturing: aerospace composites, defense, medical devices, key programs, compliance, and ERP and quoting issues.