Medical Device Supplier Evaluation Scoring Worksheet
ISO 13485 requires you to evaluate and select suppliers based on their ability to supply product meeting your requirements, with controls proportionate to risk. This worksheet gives you a weighted score and a recorded decision per supplier.
| Supplier | Supplied item | Criticality | Quality score (0-100) | Delivery score (0-100) | Regulatory score (0-100) | Weighted score | Decision | Next audit | |
|---|---|---|---|---|---|---|---|---|---|
90 | |||||||||
88.1 | |||||||||
74.4 | |||||||||
81.3 | |||||||||
64.5 |
Weights are 50% quality, 20% delivery, 30% regulatory. Change the expression to suit your procedure. Critical suppliers normally also need a quality agreement and audit regardless of score.
Automate supplier scoring from ERP data?
Optional review of pulling receipts, rejections and delivery performance automatically.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Add a row per supplier and set criticality first, because it drives how much evidence you need. Enter quality, delivery and regulatory scores from audit results, incoming inspection data, on-time delivery and certificate status. The worksheet calculates a weighted score, which supports but does not replace judgement. Record the decision and the next audit date, and export to Excel for your approved supplier list.
Scoring and weighting
The default weighting favours quality at 50%, with regulatory standing at 30% and delivery at 20%. Raise regulatory weight for sterilization or contract manufacturing, where certification and audit history matter most. Set a minimum threshold, for example 80 for critical suppliers, and treat any single criterion below a floor as a trigger regardless of the average.
- Quality from incoming inspection and SCAR history
- Delivery from on-time in-full rate
- Regulatory from ISO 13485 or MDSAP certificate and audit findings
- Criticality drives audit frequency
Common mistakes
Treating a certificate as the whole evaluation is common. A valid ISO 13485 certificate does not tell you about your specific part or process. Others re-evaluate only at onboarding and never feed back performance data. Set a review frequency and link it to nonconformance and CAPA trends.
Frequently Asked Questions
What does ISO 13485 require for suppliers?
Clause 7.4 requires documented criteria for evaluation, selection, monitoring and re-evaluation, controls proportionate to the effect on product and risk, and records of results and any actions arising.
How often should suppliers be re-evaluated?
Set it by criticality. Many companies review critical suppliers at least annually and others every two or three years, and sooner after a significant nonconformance.
Is a quality agreement required?
Not by name in every case, but written agreements on change notification and quality responsibilities are expected for critical suppliers, and FDA and notified bodies look for them.
What score should disqualify a supplier?
Your procedure decides. Many use a threshold such as under 60 for disqualification and a conditional band with a corrective action plan in between.
If supplier performance data sits in your ERP, Netray can help pull it into scoring automatically. Ask for a short review.
Related Tools
Medical Device Design Input Traceability Matrix Worksheet
Editable traceability matrix linking each design input to its design output, verification, validation and risk control.
Quality & InspectionMedical Device Cleanroom Environmental Monitoring Log
Log particle counts by location and ISO class, with automatic percent of limit and excursion flag.
Compliance & ContractsFDA Form 483 Response Letter Template
Letter template for responding to FDA inspectional observations with correction, root cause, corrective action and due dates.
Engineering & PLMMedical Device Change Control Request Template
Change request form with impact assessment on regulatory filings, risk files, validations and labeling.
More Quality & Inspection tools
See all- CAPA Corrective and Preventive Action Form Template
- Device History Record (DHR) Template
- ISO 13485 Internal Audit Checklist
- Process Validation IQ OQ PQ Template
- Medical Device Complaint Handling Form Template
- ISO 14971 Risk Management Worksheet
- Sterilization Load Record Template
- Medical Device Design Verification Protocol Template
- Medical Device Accelerated Aging Calculator (ASTM F1980)
Keep exploring
Free tools
- ISO 13485 Quality Plan Template with Medical Device File ExampleA fill-in ISO 13485 quality plan with a medical device file content example and a clause compliance checklist table.
- ISO 13485 Supplier Audit ChecklistA clause-based checklist for auditing component, material and service suppliers to a medical device manufacturer, covering QMS, process control, traceability and change control.
- ISO 13485 Internal Audit ChecklistA clause-organized checklist for auditing a medical device quality management system against ISO 13485:2016, with critical items flagged.
ERP fixes and how-tos
- How to Score ERP AI Vendors in an RFPBuild a defensible scoring model for ERP and AI bids: pass/fail gates, weighted criteria, scoring scales, evidence rules, and how to avoid demo bias and ties.
- Lieferantenbeurteilung in Infor LN: Supplier Evaluation and RatingLieferantenbeurteilung (supplier evaluation) in Infor LN: rating criteria, delivery and quality data, setup and reporting, German and English terms.
Guides
- Medical Device ERP: What ERP for Medical Device Manufacturers Must DoMedical device ERP explained: what ERP for medical device manufacturers must do for DHR, lot and UDI traceability, Part 11, QMSR and ISO 13485, and how to choose.
- ISO 13485 ERP Requirements for Medical Device Contract ManufacturersWhat ISO 13485 and FDA QMSR actually require of an ERP at a medical device contract manufacturer: records, traceability, change control and software validation.
- How to Quote Medical Device Contract Manufacturing WorkHow medical device contract manufacturers build a quote: materials with certs, cleanroom labor, validation, inspection, sterilization handoffs and NRE.
AI on your ERP
- AI on Your ERP for Medical Device Manufacturing Under QMSR and ISO 13485Private AI on your ERP for medical device makers: DHR assembly, UDI, complaints, CAPA and supplier controls under FDA QMSR and ISO 13485, kept on your own infrastructure.
- AI on Infor SyteLine for Medical Device Manufacturers: Genealogy, DHR and Audit EvidencePrivate AI on Infor SyteLine for medical device makers: lot and serial genealogy, DHR assembly, UDI and QMSR evidence, with human approval on every write.
Manufacturing hubs
- MDMA, AdvaMed and medical device manufacturing: regulation, ERP and AI realitiesMDMA and AdvaMed medical device manufacturing: FDA QMSR, ISO 13485, UDI and EU MDR, plus the ERP, traceability and private AI issues device makers face.
- Medical Device Manufacturing in Minneapolis-St. PaulMedical device manufacturing in Minneapolis-St. Paul: ecosystem, FDA and ISO 13485 requirements, and ERP, quoting and document problems contract makers face.