Life-Limited Part (LLP) Tracking Worksheet
Life-limited parts must be retired at their limit, and the history behind every cycle count has to be provable. This worksheet shows how much life is left on each serialized part and roughly when it runs out.
| Part name | Part number | Serial number | Life limit (cycles) | Cycles since new (cycles) | Cycles remaining | Life used | Cycles per month | Months left | |
|---|---|---|---|---|---|---|---|---|---|
5,800 | 71% | 26.4 months | |||||||
2,150 | 85.7% | 9.8 months | |||||||
15,700 | 37.2% | 71.4 months | |||||||
18,500 | 69.2% | 84.1 months |
Sample part numbers and limits are placeholders. Take limits from the manufacturer's airworthiness limitations and keep the signed back-to-birth records as the legal source.
LLP status from ERP serial data
Optional review of building life-limited part reports from ERP serial records.
Optional. The tool and every export work without this. No spam.
How to use it
Add one row per serialized life-limited part with its limit and the cycles accumulated since new. Enter the cycles per month the aircraft or engine currently flies. The sheet calculates cycles remaining, percent of life used and the months left at that rate. Export to Excel to sort by remaining life and share a shop visit forecast with planning and material teams, who need to know when a disk will need replacement.
Reading the numbers
Cycles remaining is the limit minus cycles since new. Percent used shows where the part sits on its life. Months left is only a forecast and changes with utilization, so it is not a regulatory number.
- Parts above 85 percent used usually need a replacement plan
- Check the next shop visit date against months left
- Never extend a limit without approved data
Common mistakes
The costliest mistake is a broken history, where cycles for a period cannot be proven, so the part must be treated as scrap or re-established. Others include mixing hours and cycles, mixing different limit definitions such as full or partial cycles, and not updating counts after each shop visit. Reconcile the sheet to the signed records at each induction. In ERP terms, tie each LLP to its serial number record so history follows the part when it is moved between assemblies.
Frequently Asked Questions
Where do the life limits come from?
From the manufacturer's airworthiness limitations section and any applicable directives. This sheet only does the arithmetic and does not supply or approve limits.
Why does the sheet show months left?
It converts remaining cycles into a planning horizon at the current utilization, helping you schedule replacement parts. It is a forecast, not a compliance limit.
What is back to birth traceability?
It is a complete, documented history of a part from manufacture to today, needed to prove its cycle count. Gaps can make the part unusable.
Can I track hours as well as cycles?
Yes, export to Excel and add hour columns, or use separate rows. Keep units consistent per row and follow the limit definition in the manufacturer data.
If LLP status is built by hand from several systems each shop visit, we can help assemble it from ERP and records data.
Related Tools
AD and Service Bulletin Compliance Tracker Worksheet
Track recurring AD and SB items by interval, last done and current flight hours, with remaining hours calculated for each line.
Aerospace & DefenseMRO Incoming Inspection and Receiving Report Template
Record what arrived, its paperwork, visible condition and disposition on one controlled receiving report for aircraft parts and components.
Aerospace & DefenseMRO Quarantine and Unserviceable Parts Tag Template
Create a clear tag and record for parts held as unserviceable, suspect or in quarantine, with reason and disposition.
Aerospace & DefenseAircraft Component Repair vs Replace Cost Calculator
Compare total repair cost with the cost of a new unit after adding downtime and adjusting for remaining life, and find the break-even repair price.
More Aerospace & Defense tools
See allKeep exploring
Free tools
- LLP Remaining Life and Pro-Rata Value CalculatorCalculate remaining cycles, life consumed, pro-rata value and the date to order a replacement for a life-limited part, with a chart over utilization.
- Aircraft Part Traceability ChecklistA 28-point checklist covering receiving, documentation, serial and batch control, life-limited parts and installation records for aircraft parts in an MRO.
- MRO Shelf Life Tracking WorksheetAn editable log of sealants, adhesives, greases and other limited-life materials with expiry, months left, value and action.