MRO Non-Routine Findings Log Worksheet
During heavy checks, findings keep appearing and the customer wants a running number. This worksheet keeps every non-routine finding in one place with hours, parts and status.
| NRC no. | Parent task card | Finding | Status | Est. hours (h) | Labor rate | Labor cost | Parts cost | Line total | |
|---|---|---|---|---|---|---|---|---|---|
$1,330 | $3,180 | ||||||||
$285 | $405 | ||||||||
$475 | $1,115 | ||||||||
$143 | $178 |
Estimates only. Customer approval and the final invoice follow your contract and your records.
Findings and cost in one ERP view
Optional review of surfacing non-routine cost from your ERP or MRO system.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Add a row for each non-routine card as it is raised. Enter the parent task card, a short finding description, estimated hours, labor rate and parts cost. Line total and labor cost calculate automatically, and the totals show the exposure. Update the status as approvals arrive. Export to Excel to send a snapshot to the customer or the commercial team, and refresh daily during a check so the numbers do not go stale.
How to read the results
The total NRC value is the money in play, but only part of it is approved. Filter by status in Excel to separate open, approved and closed work. A rising labor share often signals access and removal effort, while a high parts share points to material and lead time risk.
- Open and Awaiting approval lines are unbilled risk
- Awaiting parts lines drive turn time, chase them first
- Average cost per finding helps estimate the next check
Common mistakes
Teams often log findings only in the paper stack, so the cost summary lags the hangar by days. Another error is using one average labor rate when line, avionics and structures rates differ; split rows by skill if needed. Do not close a line until the closing task card, release and any parts traceability are complete. If your ERP or MRO system holds non-routine cards, use this sheet as a quick view and reconcile weekly.
Frequently Asked Questions
Is this a replacement for my MRO software?
No. It is a quick working log for planners who currently use Excel. It does not replace controlled records in your maintenance information system.
Can I add more columns?
Export to Excel and extend it as you like, for example ATA chapter, customer approval date or ordered parts reference.
How do I handle different labor rates?
Enter the applicable rate on each row. You can use a different rate for avionics, structures or cabin work and the totals still sum correctly.
What does labor share tell me?
It shows the portion of total value that is labor rather than parts. Use it to spot checks dominated by access time or by material.
If findings and estimates are scattered across spreadsheets and email, we can help bring them into your ERP reporting.
Related Tools
MRO Technician Task Card Template
Build a printable task card with the maintenance reference, tooling, parts, steps and inspection sign-offs for a single job.
Aerospace & DefenseAD and Service Bulletin Compliance Tracker Worksheet
Track recurring AD and SB items by interval, last done and current flight hours, with remaining hours calculated for each line.
Aerospace & DefenseMRO Component Repair Quote Template
Produce a clear component repair quote with scope, price basis, turn time, warranty and beyond-economic-repair terms.
Aerospace & DefenseAircraft Component Repair vs Replace Cost Calculator
Compare total repair cost with the cost of a new unit after adding downtime and adjusting for remaining life, and find the break-even repair price.
More Aerospace & Defense tools
See allKeep exploring
Free tools
- MRO Turn Time CalculatorAdd up the stages of a repair, see total turn time against target, the value-adding share and the work in process your shop will carry.
- MRO Work Package TemplateA fill-in work package cover and index with scope, task card list, parts, tooling, resources and sign-off blocks for an aircraft maintenance visit.
- MRO Technician Task Card TemplateBuild a printable task card with the maintenance reference, tooling, parts, steps and inspection sign-offs for a single job.
Guides
- AI-Powered Aerospace ERP SolutionsAerospace-specific ERP solutions with AI. AS9100 compliance, ITAR management, MRO optimization, and traceability for aviation and space manufacturers.
- AI in MRO: Aerospace Use Cases That Work and Realistic ROIAI in MRO and AI for MRO: predictive maintenance, tech-log classification, 8130-3 drafting and repair quoting. What works today, data needed, realistic payback.
- Preventive Maintenance and ERP Integration: Closing the Loop Between Uptime and PlanningPreventive maintenance ERP integration guide: CMMS-ERP data flows, meter-based PM triggers, MRO inventory, scheduling impact, and AI-driven predictive maintenance.
AI on your ERP
- AI for aviation MRO maintenance records and technical documentationOn-prem AI reads AD and SB packets, cross-checks logbooks and work orders against your MRO ERP, and drafts compliance narratives, without technical records leaving your network.
- AI for ERP in Singapore Aerospace MRO: On-Prem and PDPA-ReadyOn-prem AI for IFS, SAP, and AMOS-type MRO systems in Singapore aerospace: PDPA-aligned, CAAS-ready, built for the Seletar Aerospace Park hub.