Aerospace & DefenseFree worksheetPDF, Excel, Word exportAerospace MRO

AD and Service Bulletin Compliance Tracker Worksheet

Missing a repetitive airworthiness directive inspection is a serious compliance failure. This worksheet gives planners a simple remaining-hours view per item to catch the tight ones early.

Free, optional. Reopen it on any device.
Download:
AD or SB ref.SubjectTypeRecurrenceInterval (FH)Done at (FH)Current (FH)Remaining (FH)Calendar limit
150
250
450
150
Lowest remaining FH
150
Items tracked
4
Tightest item (FH remaining)
150

Sample entries use placeholder references, not real directives. Take every requirement and compliance time from the actual directive and your approved maintenance programme.

Due lists from ERP usage data

Optional review of feeding utilization and due dates from your ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the tracker

Add each applicable AD or service bulletin on its own row with the reference, a short subject, whether it repeats, the interval, the flight hours when it was last done and the current total. Remaining hours calculate for each row. Keep a calendar limit column for items with a time basis, since many directives use hours, cycles or calendar time, whichever comes first. Export to Excel to filter by lowest remaining and review it at every planning meeting.

The remaining-time logic

For a repetitive item, remaining equals the interval minus the usage accumulated since the last compliance: interval - (current - last). A negative result means the limit has passed. For one-time items, treat the interval as the compliance limit and last as zero. The directive text always governs tolerances, grace periods and the units used.

  • Keep hours, cycles and calendar limits in separate columns
  • Sort ascending by remaining so tight items surface first
  • Update the current figure at every utilization update

Common mistakes

A frequent error is mixing units, for example entering cycles against a flight hour counter. Another is tracking only the original directive and missing a later revision or superseding AD. Do not treat this sheet as the legal record of compliance; the signed maintenance record is. If a fleet is large, move the data into your maintenance information system and use the sheet for spot reviews or small operators.

Frequently Asked Questions

Does this give me the actual AD requirements?

No. It is only a tracker. Read the directive or bulletin itself for applicability, compliance time, method and any alternative means of compliance.

How do I handle cycles and calendar limits?

Add columns or duplicate the row per limit type. Compliance is generally due at whichever limit is reached first, as the directive states.

What if remaining goes negative?

That means the interval was exceeded. Stop and check the directive and your records, and escalate to your continuing airworthiness manager immediately.

Can I use this for service bulletins?

Yes, for tracking. Service bulletin compliance may be optional or recommended, so note the status and customer decision in your own records.

If compliance data sits in several spreadsheets, we can help consolidate it with your ERP or maintenance system data for one reliable due list.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP