NetSuite Manufacturing and Item Record Types Reference
Manufacturing in NetSuite is spread across item records, engineering records and transactions. This reference lists the record ids you need when scripting, calling REST or writing documentation, grouped so that you can see how an assembly, its BOM and its routing relate.
| Record id | Record | Group | What it is used for |
|---|---|---|---|
inventoryitem | Inventory Item | Item | Purchased stock item tracked in quantity and value |
assemblyitem | Assembly/Bill of Materials Item | Item | Built item with a bill of materials |
lotnumberedinventoryitem | Lot Numbered Inventory Item | Item | Stock item tracked by lot number |
lotnumberedassemblyitem | Lot Numbered Assembly Item | Item | Built item tracked by lot number |
serializedinventoryitem | Serialized Inventory Item | Item | Stock item tracked by serial number |
serializedassemblyitem | Serialized Assembly Item | Item | Built item tracked by serial number |
kititem | Kit/Package Item | Item | Group of items sold together, not built |
noninventoryitem | Non-Inventory Item | Item | Item not tracked in inventory quantity |
serviceitem | Service Item | Item | Labor or service line |
otherchargeitem | Other Charge Item | Item | Freight, fees and similar charges |
discountitem | Discount Item | Item | Discount applied on a transaction |
descriptionitem | Description Item | Item | Text only line on a transaction |
bom | Bill of Materials | Engineering | Container for the component list of an assembly |
bomrevision | BOM Revision | Engineering | Dated version of a BOM with effective dates |
manufacturingrouting | Manufacturing Routing | Engineering | Sequence of operations for an assembly |
manufacturingcosttemplate | Manufacturing Cost Template | Engineering | Labor and machine cost rates used for routing costing |
manufacturingoperationtask | Manufacturing Operation Task | Shop floor | Operation line generated from a routing on a work order |
workorder | Work Order | Transaction | Request to build a quantity of an assembly |
workorderissue | Work Order Issue | Transaction | Issues components to a work order |
workordercompletion | Work Order Completion | Transaction | Records completed quantity and operation progress |
workorderclose | Work Order Close | Transaction | Closes a work order and releases open commitments |
assemblybuild | Assembly Build | Transaction | Consumes components and produces the assembly item |
assemblyunbuild | Assembly Unbuild | Transaction | Reverses a build back into components |
inventoryadjustment | Inventory Adjustment | Transaction | Changes quantity or value outside a normal receipt |
inventorytransfer | Inventory Transfer | Transaction | Moves stock between locations |
location | Location | Setup | Warehouse, plant or other stock location |
Record ids are the script ids used by record.load, REST record URLs and N/record. The matching record.Type enum in SuiteScript uses the same name in upper case with underscores. Availability depends on enabled features such as Work Orders, Assemblies and Advanced BOM.
Mapping NetSuite manufacturing data?
Request a short review of your item, BOM and routing structure before you integrate.
Optional. The tool and every export work without this. No spam.
How to use the table
Search by name or purpose and copy the record id. Use it as the type in record.load, as the path segment in a REST request, or as the record type in a CSV import mapping discussion. The Group column separates item records from engineering data, shop floor tasks and transactions, which makes it easier to scope an integration.
How the records connect
An assembly item points to a BOM, and the BOM has one or more revisions with effective dates. A routing is linked to the assembly and the BOM revision, and a manufacturing cost template supplies labor and machine rates. When a work order is created, the system copies the revision components and generates operation tasks from the routing. Transactions then record issue, completion and close.
- Item defines the thing being built
- BOM and revision define what goes in
- Routing defines how and in what order
- Work order carries the plan, builds and completions carry the result
Feature dependencies
Several records appear only when features are enabled. Work orders and assembly builds need the Assemblies and Work Orders features, routings and operation tasks need the manufacturing routing and work center setup, and lot or serial variants require the matching inventory tracking features. If a record id returns not found, check the feature before debugging the script.
Common mistakes
Developers often load an assembly with the inventoryitem type, which fails because the record type is specific. Another mistake is treating a kit item as a built item. A kit is not built and has no work order, while an assembly is built and costed from components.
Frequently Asked Questions
What is the difference between an assembly item and a kit item?
An assembly item is manufactured through a work order or build and has its own inventory and cost. A kit item is a sales grouping of other items that is not built. Choose assembly when you need production and costing, and kit when you only bundle for sale.
Why does record.load fail for my assembly?
The record type must match the item subtype. A lot numbered assembly uses lotnumberedassemblyitem and a plain assembly uses assemblyitem. Loading with the wrong id returns an error even though the internal id is valid.
Do I need BOM revisions?
BOM revisions are how NetSuite tracks effective dated changes to components. If your engineering changes are frequent or you need history for audits, use revisions. Very simple products can run with a single revision.
Is this the full NetSuite record list?
No. It focuses on manufacturing and item records. Use the Records Catalog inside NetSuite for the full set, including fields and sublists for each record in your account.
If you are mapping NetSuite manufacturing data into a planning tool or an AI assistant, we can help you validate the record relationships against your own account.
Related Tools
NetSuite Transaction Type Codes Reference
Look up the short type code stored in transaction.type for common NetSuite transactions, with the matching record id.
NetSuiteNetSuite Manufacturing Go-Live Checklist
A 30 item checklist covering data, setup, costing, inventory, roles and cutover before you run production in NetSuite.
NetSuiteNetSuite Work Order Component Shortage Worksheet
Paste component quantities from a NetSuite report and see which work order lines are short now and after open purchase orders.
Developer ToolsNetSuite SuiteScript 2.1 RESTlet Skeleton Generator
Fill in a script name, record type and fields to get a SuiteScript 2.1 RESTlet with GET lookup, POST create, logging and error handling.
More NetSuite tools
See all- NetSuite Work Order Status Reference
- NetSuite Assembly Build Checklist
- NetSuite BOM Revision Change Request Template
- NetSuite Routing Operation Cost Worksheet
- NetSuite Component Yield and Scrap Requirement Calculator
- NetSuite Manufacturing Process Maturity Assessment
- NetSuite Saved Search Formula Generator
- NetSuite CSV Import Template Guide
- NetSuite Role Permission Matrix Worksheet
New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- NetSuite Work Order Status ReferenceLookup table of NetSuite work order statuses and the transactions and records around them, with what each one means and what to check.
- NetSuite Script Deployment Fields and Status ReferenceWhat each field on a Script Deployment record does, which script types have it, and the setting to use for testing and for production.
- NetSuite Assembly Build ChecklistA pre-build and post-build checklist for NetSuite assembly items and work orders, covering setup, inventory and costing checks.
ERP fixes and how-tos
- How to create an assembly build or work order in NetSuiteHow to build assembly items in NetSuite: when to use a simple Assembly Build versus a Work Order, BOM setup, component availability, and completion steps.
- How to Create a Custom Record Type in NetSuiteCreate a NetSuite custom record type: Customization > Lists, Records, & Fields > Record Types, script IDs, permissions, sublists and saved searches.
- Fix NetSuite INVALID_KEY_OR_REF ErrorINVALID_KEY_OR_REF means NetSuite could not resolve a reference key, such as a parent, join, or foreign record id. Common causes and how to fix each.
Runs with your ERP
- OpenBOM and Oracle NetSuite: from CAD BOM to assembly itemsHow OpenBOM for NetSuite moves SOLIDWORKS and other CAD BOMs into NetSuite assembly items and BOMs, push and pull modes, setup steps, pitfalls and AI use.
- Arena PLM and Oracle NetSuite: syncing items, BOMs and ECOsHow Arena PLM passes released items, BOMs and ECOs to Oracle NetSuite, what data flows, setup steps, common mapping pitfalls and where a private AI layer helps.
- PlanetTogether APS with Oracle NetSuite: finite schedulingHow PlanetTogether APS connects to NetSuite: imports of work orders, BOMs, routings and items, and schedules written back. Setup, data flows and pitfalls.
AI on your ERP
- AI for NetSuite manufacturers: agents for work orders, routings and WIPAI for NetSuite manufacturers: agents that answer work order, routing, WIP and shortage questions from live SuiteQL data, with human approval on anything that writes back.
- AI for NetSuite Order to Cash: Find Where Every Order and Dollar Is StuckAI for the NetSuite order to cash cycle: sales orders, item fulfillment, invoicing and collections. Ask where an order is stuck and why cash is late.
Integrations
- How to use ChatGPT with Oracle NetSuiteConnect ChatGPT to Oracle NetSuite: custom GPT actions, exports versus live access, enterprise data controls, and when a private model is the safer choice.
- How to use Claude with Oracle NetSuiteUse Claude with Oracle NetSuite through MCP connectors, the Anthropic API, AWS Bedrock or Vertex, plus the on-prem alternative for controlled data.