OracleFree referencePDF, Excel, Word exportOracle E-Business SuiteDiscrete ManufacturingAll Oracle E-Business Suite tools

Oracle EBS ER Diagram: Key Manufacturing and Purchasing Table Relationships

This is a searchable Oracle EBS ER diagram in table form: parent table, child table and the exact join columns for purchasing, receiving, WIP, BOM, routing and inventory. Filter by area, copy the join, and stop guessing which ID links which table.

Download:
AreaParent tableChild tableJoin columnsCardinalityNote
Purchasing
PO_HEADERS_ALL
PO_LINES_ALL
PO_HEADER_ID
1 to many
One PO header has many lines
Purchasing
PO_LINES_ALL
PO_LINE_LOCATIONS_ALL
PO_LINE_ID
1 to many
Shipments: promise dates, ship-to org, quantity
Purchasing
PO_LINE_LOCATIONS_ALL
PO_DISTRIBUTIONS_ALL
LINE_LOCATION_ID
1 to many
Charge account and quantity split
Purchasing
PO_HEADERS_ALL
PO_DISTRIBUTIONS_ALL
PO_HEADER_ID
1 to many
Shortcut when line detail is not needed
Purchasing
AP_SUPPLIERS
PO_HEADERS_ALL
VENDOR_ID
1 to many
Supplier on the PO (PO_VENDORS in 11i)
Purchasing
AP_SUPPLIER_SITES_ALL
PO_HEADERS_ALL
VENDOR_SITE_ID
1 to many
Supplier site; also filter by ORG_ID
Purchasing
MTL_SYSTEM_ITEMS_B
PO_LINES_ALL
INVENTORY_ITEM_ID = ITEM_ID
1 to many
Add ORGANIZATION_ID from the shipment ship-to org
Requisitions
PO_REQUISITION_HEADERS_ALL
PO_REQUISITION_LINES_ALL
REQUISITION_HEADER_ID
1 to many
Requisition header to lines
Requisitions
PO_REQUISITION_LINES_ALL
PO_REQ_DISTRIBUTIONS_ALL
REQUISITION_LINE_ID
1 to many
Requisition charge accounts
Requisitions
PO_REQ_DISTRIBUTIONS_ALL
PO_DISTRIBUTIONS_ALL
DISTRIBUTION_ID = REQ_DISTRIBUTION_ID
1 to 1 or many
Traces a PO distribution back to its requisition
Receiving
PO_LINE_LOCATIONS_ALL
RCV_SHIPMENT_LINES
LINE_LOCATION_ID = PO_LINE_LOCATION_ID
1 to many
Receipt lines against a PO shipment
Receiving
RCV_SHIPMENT_HEADERS
RCV_SHIPMENT_LINES
SHIPMENT_HEADER_ID
1 to many
Receipt header to lines
Receiving
RCV_SHIPMENT_LINES
RCV_TRANSACTIONS
SHIPMENT_LINE_ID
1 to many
RECEIVE, DELIVER, RETURN TO VENDOR rows
WIP
WIP_ENTITIES
WIP_DISCRETE_JOBS
WIP_ENTITY_ID
1 to 1
Name and type in WIP_ENTITIES, status and dates in discrete jobs
WIP
WIP_DISCRETE_JOBS
WIP_OPERATIONS
WIP_ENTITY_ID + ORGANIZATION_ID
1 to many
Job operations keyed by OPERATION_SEQ_NUM
WIP
WIP_OPERATIONS
WIP_OPERATION_RESOURCES
WIP_ENTITY_ID + ORGANIZATION_ID + OPERATION_SEQ_NUM
1 to many
Resources per operation
WIP
WIP_DISCRETE_JOBS
WIP_REQUIREMENT_OPERATIONS
WIP_ENTITY_ID + ORGANIZATION_ID
1 to many
Component requirements; OPERATION_SEQ_NUM links to the operation
WIP
WIP_ENTITIES
WIP_TRANSACTIONS
WIP_ENTITY_ID
1 to many
Resource and overhead transactions
WIP
WIP_ENTITIES
WIP_MOVE_TRANSACTIONS
WIP_ENTITY_ID
1 to many
Operation moves
WIP
WIP_ENTITIES
MTL_MATERIAL_TRANSACTIONS
WIP_ENTITY_ID = TRANSACTION_SOURCE_ID
1 to many
Only where TRANSACTION_SOURCE_TYPE_ID is the job or schedule source type
BOM
BOM_STRUCTURES_B
BOM_COMPONENTS_B
BILL_SEQUENCE_ID
1 to many
Table names in 12.x; BOM_BILL_OF_MATERIALS and BOM_INVENTORY_COMPONENTS remain as synonyms
BOM
MTL_SYSTEM_ITEMS_B
BOM_STRUCTURES_B
INVENTORY_ITEM_ID (assembly) + ORGANIZATION_ID
1 to many
One bill per alternate
BOM
MTL_SYSTEM_ITEMS_B
BOM_COMPONENTS_B
COMPONENT_ITEM_ID = INVENTORY_ITEM_ID
1 to many
Component item; use the bill organization
Routing
BOM_OPERATIONAL_ROUTINGS
BOM_OPERATION_SEQUENCES
ROUTING_SEQUENCE_ID
1 to many
Routing header to operations
Routing
BOM_OPERATION_SEQUENCES
BOM_OPERATION_RESOURCES
OPERATION_SEQUENCE_ID
1 to many
Resources per routing operation
Routing
BOM_DEPARTMENTS
BOM_OPERATION_SEQUENCES
DEPARTMENT_ID
1 to many
Department performing the operation
Inventory
MTL_PARAMETERS
MTL_SYSTEM_ITEMS_B
ORGANIZATION_ID
1 to many
Item master is keyed by item plus organization
Inventory
MTL_SYSTEM_ITEMS_B
MTL_ONHAND_QUANTITIES_DETAIL
INVENTORY_ITEM_ID + ORGANIZATION_ID
1 to many
On-hand by subinventory, locator and lot
Inventory
MTL_SYSTEM_ITEMS_B
MTL_MATERIAL_TRANSACTIONS
INVENTORY_ITEM_ID + ORGANIZATION_ID
1 to many
Transaction history
Inventory
MTL_PARAMETERS
MTL_SECONDARY_INVENTORIES
ORGANIZATION_ID
1 to many
Subinventories per organization
Organization
HR_ALL_ORGANIZATION_UNITS
MTL_PARAMETERS
ORGANIZATION_ID
1 to 1
Inventory organizations are HR organizations with parameters

Join columns reflect standard 12.1 and 12.2 data models. Always confirm in the Oracle eTRM for your release and add ORG_ID or ORGANIZATION_ID filters on multi-org tables.

Natural-language queries over your EBS schema

Optional: see how a private AI layer can generate read-only EBS queries on your own servers.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to read the relationships

Each row is one foreign key relationship. The parent holds the unique row, the child holds many rows pointing back to it, and the join column shows how to connect them. Where several columns are shown with plus signs, all of them are needed. WIP tables, for example, need both WIP_ENTITY_ID and ORGANIZATION_ID, and inventory tables need INVENTORY_ITEM_ID with ORGANIZATION_ID, because an item belongs to an organization.

  • Search by table name to see every parent and child it touches
  • Use the Area filter to see one module's data model at a time
  • Copy the join column text straight into your WHERE clause

Where an ER diagram does not appear in EBS

Oracle does not ship a single ER diagram for EBS. The official source is the Electronic Technical Reference Manual (eTRM), which lists every table, column, index and foreign key per release. Foreign keys are often documented rather than enforced in the database, so a database-level ERD tool will miss many of them. A relationship table like this one is faster to use than a drawn diagram when you need a join, and you can feed it into any diagramming tool afterwards.

Multi-org and organization traps

Most transactional tables ending in _ALL carry ORG_ID for the operating unit, and the unsuffixed synonym filters by the session's MO: Operating Unit setting. If you query the base _ALL table directly, add ORG_ID yourself. Item tables are keyed by organization, so a purchase order line joins to the item using the ship-to organization from the shipment, not the operating unit. Mixing those two produces duplicate rows or missing descriptions.

Common mistakes

Joining WIP_ENTITIES to inventory transactions without checking the source type returns unrelated rows, because TRANSACTION_SOURCE_ID holds IDs from many sources. Joining PO lines to items without ORGANIZATION_ID duplicates rows for every organization where the item exists. Using the old PO_VENDORS name fails on 12.x because supplier data moved to AP_SUPPLIERS and the Trading Community Architecture.

  • Always filter transaction source type when joining to MTL_MATERIAL_TRANSACTIONS
  • Always carry ORGANIZATION_ID on item joins
  • Check whether your release uses BOM_STRUCTURES_B or the older name

Frequently Asked Questions

Is there an official Oracle EBS ER diagram?

Not as a single diagram. Oracle publishes the Electronic Technical Reference Manual (eTRM) with tables, columns and foreign keys by release. Use it as the authority and use a relationship list like this one for quick join lookups while you build queries.

Why do PO and item tables need ORGANIZATION_ID?

Items are defined in the item master and enabled per inventory organization, so MTL_SYSTEM_ITEMS_B has one row per item and organization. Without ORGANIZATION_ID in the join you get one result row for every organization that has the item.

Do these joins work on EBS 11i?

Most purchasing, WIP and inventory joins are the same, but 11i uses PO_VENDORS and different BOM table names, and has no Trading Community supplier model. Check the 11i eTRM before relying on the supplier and BOM rows.

Can I import these relationships into a diagram tool?

Yes. Export the table to Excel or CSV and load the parent, child and join columns into your modelling or diagramming tool. Add cardinality as the edge label to get a readable diagram of the area you care about.

If your team spends hours rebuilding these joins for each report, we can put a private AI layer over your EBS schema that writes and explains read-only queries on your own servers.

Get Oracle E-Business Suite alerts

Support and maintenance deadlines, release changes that affect Oracle E-Business Suite sites, and new free Oracle E-Business Suite tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Oracle E-Business Suite: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Oracle E-Business Suite? Start with the Oracle E-Business Suite guide and toolkit, or plan with Oracle EBS Roadmap Planner, Training Path Builder, ERP Certification Study Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations

Software