SAPFree referencePDF, Excel, Word exportSAP ECC / S/4HANAAll SAP ECC 6.0 tools

SAP PM Transaction Codes List (IW21, IW31, IE01, IL01, IP10 and More)

Plant maintenance users and consultants repeat the same few dozen transactions every day. This list groups the SAP PM transaction codes by process step so you can find the create, change, display and list variant fast.

Download:
T-codeDescriptionAreaAction
IW21
Create PM notification
Notifications
Create
IW22
Change PM notification
Notifications
Change
IW23
Display PM notification
Notifications
Display
IW24
Create malfunction report
Notifications
Create
IW25
Create activity report
Notifications
Create
IW28
Change notifications list
Notifications
List
IW29
Display notifications list
Notifications
List
IW51
Create service notification
Notifications
Create
IW52
Change service notification
Notifications
Change
IW53
Display service notification
Notifications
Display
IW31
Create PM order
Orders
Create
IW32
Change PM order
Orders
Change
IW33
Display PM order
Orders
Display
IW37N
Change operations list (order operations)
Orders
List
IW38
Change PM orders list
Orders
List
IW39
Display PM orders list
Orders
List
IW41
Enter time confirmation for PM order
Confirmation
Create
IW44
Change PM order confirmation
Confirmation
Change
IW45
Cancel PM order confirmation
Confirmation
Cancel
IE01
Create equipment
Equipment
Create
IE02
Change equipment
Equipment
Change
IE03
Display equipment
Equipment
Display
IE05
Change equipment list
Equipment
List
IH08
Display equipment list
Equipment
List
IL01
Create functional location
Functional location
Create
IL02
Change functional location
Functional location
Change
IL03
Display functional location
Functional location
Display
IL05
Change functional location list
Functional location
List
IH06
Display functional location list
Functional location
List
IH01
Functional location structure list
Functional location
List
IQ01
Create material serial number
Equipment
Create
IA01
Create equipment or general task list
Task lists
Create
IA02
Change task list
Task lists
Change
IA03
Display task list
Task lists
Display
IP01
Create maintenance plan
Preventive maintenance
Create
IP02
Change maintenance plan
Preventive maintenance
Change
IP03
Display maintenance plan
Preventive maintenance
Display
IP10
Schedule maintenance plan
Preventive maintenance
Schedule
IP19
Maintenance scheduling overview
Preventive maintenance
Report
IP30
Deadline monitoring for maintenance plans
Preventive maintenance
Batch
IK01
Create measuring point
Condition monitoring
Create
IK02
Change measuring point
Condition monitoring
Change
IK03
Display measuring point
Condition monitoring
Display
IK11
Create measurement document
Condition monitoring
Create
IK12
Change measurement document
Condition monitoring
Change
IK13
Display measurement document
Condition monitoring
Display
IW13
Material where-used list (BOM)
Spare parts
Report
MB21
Create reservation
Spare parts
Create
MIGO
Goods movement (issue to order)
Spare parts
Post
KO88
Settle order (individual)
Settlement
Settle
KO8G
Settle orders (collective)
Settlement
Settle
KOB1
Orders: actual line items
Settlement
Report
CR01
Create work center
Master data
Create
CR02
Change work center
Master data
Change
CR03
Display work center
Master data
Display
CL02
Maintain class
Classification
Change
CT04
Maintain characteristics
Classification
Change
SE16N
General table display
Technical
Display
SM37
Job overview (background jobs)
Technical
Report

Codes are correct for the classic GUI transactions in ECC and S/4HANA on-premise. In S/4HANA many users work through Fiori apps instead. Authorizations (for example object I_AUART or I_IWERK) decide which codes a user may run.

PM role and access review

Optional: share your PM roles and we will point out transactions that look over-granted.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the list

Search by code, such as IW3, or by words such as measuring point or confirmation. The naming pattern helps: IW is work and notifications, IE is equipment, IL and IH are functional locations and lists, IA is task lists, IP is maintenance plans and IK is measuring points. The last digit is usually 1 create, 2 change, 3 display. List transactions like IW38 and IE05 let planners mass-change objects from one screen.

  • IW21 or IW24 to start a notification, IW31 to create an order
  • IW41 for time confirmation, KO88 to settle
  • IP10 to schedule a plan, IP30 as the batch call run

The preventive maintenance cycle in transaction order

A typical preventive loop runs in this order. Create the technical objects (IL01, IE01), build the task list (IA01), create the maintenance plan with strategy or single cycle (IP01), schedule it (IP10), and let the batch job for IP30 generate orders when the call horizon is reached. Planners then work orders in IW38, issue spares with MIGO, confirm with IW41, set TECO, and finance runs KO88 or KO8G to settle costs.

Common mistakes

Most issues come from mixing up list and single transactions, or from running a plan schedule without a valid start date. Another is giving users change access to technical objects when display is enough, which causes master data drift. Set up user roles by process step rather than by module, and keep IP30 as a scheduled job with a variant per plant so that the call horizon is honoured consistently.

Frequently Asked Questions

What is the difference between IW31 and IW38?

IW31 creates a single new maintenance order. IW38 is a list transaction: it selects many existing orders by criteria and lets you change them from the list. Planners use IW38 as their daily worklist and IW39 when they only need to display.

Which transaction schedules maintenance plans?

IP10 schedules a single maintenance plan manually. IP30 is the deadline monitoring run that checks all due plans and generates calls, orders or notifications. In production, IP30 is normally set up as a recurring background job.

How do I settle a maintenance order?

Use KO88 for an individual order or KO8G for many orders at once, after the settlement rule exists and the order is technically completed. Run a simulation first to check the receiver, such as a cost center, before the real settlement.

Are these codes different in S/4HANA?

The classic GUI transactions remain available in on-premise S/4HANA, but SAP promotes Fiori apps for many tasks such as work order lists. Menu paths and some screens change, so check your system and the roles assigned to your users.

If you want users to ask for open orders, overdue plans or notification counts in plain language instead of navigating these transactions, we can show you how that works on top of read-only SAP access.