SAPFree referencePDF, Excel, Word exportSAP S/4HANAAll SAP S/4HANA (on-premise) tools

SAP BOM Category, BOM Usage and Item Category Codes: STLTY, STLAN, POSTP Reference

BOM and classification work is full of one-letter and one-digit codes. This reference decodes the ones you meet most: BOM category, usage, item category, class type, characteristic format and dependency status.

Download:
FieldField meaningCodeValueNote
STLTY
BOM category
M
Material BOM
The normal BOM linked to a material through MAST.
STLTY
BOM category
S
Standard BOM
A BOM not tied to a material, used as a template.
STLTY
BOM category
K
Sales order BOM
Order specific BOM for a sales order item.
STLTY
BOM category
D
Document structure
Hierarchy of documents.
STLTY
BOM category
E
Equipment BOM
Plant maintenance structure for equipment.
STLTY
BOM category
T
Functional location BOM
Plant maintenance structure for a functional location.
STLTY
BOM category
P
WBS BOM
BOM tied to a work breakdown structure element.
STLAN
BOM usage
1
Production
The BOM used for planning and manufacturing.
STLAN
BOM usage
2
Engineering / design
Engineering view, often before release to production.
STLAN
BOM usage
3
Universal
A shared BOM used across areas.
STLAN
BOM usage
4
Plant maintenance
Maintenance and spare part BOM.
STLAN
BOM usage
5
Sales and distribution
BOM used for sales orders and delivery.
STLAN
BOM usage
6
Costing
BOM used for product costing.
POSTP
Item category
L
Stock item
Material kept in stock, planned and issued normally.
POSTP
Item category
N
Non-stock item
Material not stocked, procured directly for the order.
POSTP
Item category
D
Document item
Attaches a document such as a drawing to the BOM.
POSTP
Item category
R
Variable-size item
Component whose size is set by formula, such as a cut length.
POSTP
Item category
T
Text item
Informational text line in the BOM.
POSTP
Item category
K
Class item
Component chosen from a class, used in configurable BOMs.
KLART
Class type
001
Material class
Standard class type for materials.
KLART
Class type
002
Equipment class
Classifies plant maintenance equipment.
KLART
Class type
003
Functional location class
Classifies functional locations.
KLART
Class type
017
Document class
Classifies document info records.
KLART
Class type
023
Batch class
Classifies batches.
KLART
Class type
300
Variant class
Class type used for configurable materials in variant configuration.
ATFOR
Characteristic data type
CHAR
Character format
Text values; most common for options.
ATFOR
Characteristic data type
NUM
Numeric format
Numbers with decimals, used for dimensions and capacities.
ATFOR
Characteristic data type
DATE
Date format
Date values.
ATFOR
Characteristic data type
TIME
Time format
Time values.
ATFOR
Characteristic data type
CURR
Currency format
Amount with currency key.
Dependency status
Dependency status
1
In preparation
Not yet effective in configuration.
Dependency status
Dependency status
2
Released
Active and evaluated during configuration.
Dependency status
Dependency status
3
Locked
Blocked from use; kept for reference.

Codes are standard SAP values. Customizing can add BOM usages and class types, and some item categories need specific settings in your system. Confirm with your own customizing tables.

Planning a BOM data migration?

Ask for an optional review of your BOM category and usage mapping before migration.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the lookup

Search by field name, code or meaning. Typing STLAN shows all BOM usage codes, typing K shows every K code across fields. The Field meaning column tells which field the code belongs to, because the same letter means different things in different fields. Use it when you read a table in SE16N and need to decode the values, or when you write a filter such as STLTY = M. Export it to Excel to put a decoder tab in your data migration workbook.

Why these codes matter in a VC project

The BOM category decides which transaction you use and which table holds the item. Material BOMs use M, sales order BOMs use K, which is how an order-specific structure is separated from the master. BOM usage lets engineering and production keep different structures for the same material. The item category controls how a component behaves, and class items (K) let a BOM pick a component from a class rather than naming one part. The class type 300 is where variant characteristics usually live. Dependency status 2 is the only one that is active at configuration time.

  • M material BOM, K sales order BOM
  • Usage 1 for production, 2 for engineering
  • Class item K picks a component from a class
  • Only released dependencies (2) are evaluated

Common mistakes

Teams often build the BOM with usage 2 and forget to create or copy it to usage 1, so MRP cannot find a structure. Another mistake is loading a dependency in status 1 and wondering why it has no effect. Also, a text item (T) is not a component and will not be exploded or costed. When migrating, map old usage and category codes to the target values deliberately rather than relying on defaults. Finally, check customizing, because some systems add custom BOM usages not listed here.

Frequently Asked Questions

What is the difference between BOM category M and K?

M is the material BOM, tied to a material and plant, and is the master structure. K is a sales order BOM, specific to one sales order item, created when an order needs its own structure. Configured products can use order BOMs so changes do not affect the master.

What does BOM usage 3 mean?

Usage 3 is universal. A universal BOM can serve more than one area, such as production and engineering. Many plants prefer separate usages for clearer control, but small plants often keep a single universal BOM for simplicity.

What is class type 300?

Class type 300 is the variant class type used for configurable materials. Characteristics that describe the options of a product are collected in classes of this type, and the configuration profile points to them. Other types such as 001 are used for plain classification.

Why is my dependency not working?

Check its status first. A dependency in status 1 (in preparation) is not evaluated, and one in status 3 (locked) is blocked. Only status 2 (released) takes effect in configuration. Also check that it is assigned to the right object and that the profile is active.

If you are mapping BOM and classification data into a new SAP system, Netray can help review your master data rules and mappings.