SAPFree referencePDF, Excel, Word exportSAP ECC / S/4HANAAll SAP ECC 6.0 tools

SAP IDoc Control Record (EDIDC) Fields Reference

The IDoc control record is the header that tells SAP who sent the document, who receives it, what business message it carries and which structure it uses. This table lists the fields you meet most often when debugging or coding IDoc interfaces.

Download:
FieldMeaningData typeNotes
MANDT
Client
CLNT 3
Only in table EDIDC, not in the EDI_DC40 file structure
DOCNUM
IDoc number
NUMC 16
Unique number per client, assigned when the IDoc is created
STATUS
Current status of the IDoc
CHAR 2
Latest status is copied here from table EDIDS
DIRECT
Direction
CHAR 1
1 = outbound, 2 = inbound
IDOCTP
Basic IDoc type
CHAR 30
Structure definition, for example ORDERS05
CIMTYP
Extension (customer IDoc type)
CHAR 30
Only filled when a basic type is extended
MESTYP
Logical message type
CHAR 30
Business meaning, for example ORDERS; drives partner profile lookup
MESCOD
Logical message variant
CHAR 3
Optional, refines the message type in the partner profile
MESFCT
Logical message function
CHAR 3
Optional, further refines the message type
STD
EDI standard
CHAR 1
For example X for ANSI X12, E for EDIFACT
STDVRS
Version of the EDI standard
CHAR 6
Used with subsystem EDI conversion
STDMES
EDI message type
CHAR 6
For example 850 for X12 or ORDERS for EDIFACT
SNDPOR
Sender port
CHAR 10
Port defined in WE21
SNDPRT
Sender partner type
CHAR 2
LS = logical system, KU = customer, LI = vendor
SNDPFC
Sender partner function
CHAR 2
For example SP, SH, BP when the partner type needs one
SNDPRN
Sender partner number
CHAR 10
Logical system name, customer number or vendor number
RCVPOR
Receiver port
CHAR 10
Port defined in WE21
RCVPRT
Receiver partner type
CHAR 2
LS = logical system, KU = customer, LI = vendor
RCVPFC
Receiver partner function
CHAR 2
Same value set as the sender partner function
RCVPRN
Receiver partner number
CHAR 10
Key part of partner profile WE20
CREDAT
Creation date
DATS 8
Date the IDoc was created
CRETIM
Creation time
TIMS 6
Time the IDoc was created
UPDDAT
Date of last change
DATS 8
Updated on each status change
UPDTIM
Time of last change
TIMS 6
Updated on each status change
SERIAL
EDI serialization field
CHAR 20
Used to detect out-of-order delivery of related IDocs
REFINT
Reference to transmission file
CHAR 14
Interchange reference from a file or EDI subsystem
REFGRP
Reference to message group
CHAR 14
Group reference from the EDI subsystem
REFMES
Reference to message
CHAR 14
Message reference from the EDI subsystem
ARCKEY
Archive key for external archive
CHAR 70
Set when the IDoc is archived with an external system
TEST
Test flag
CHAR 1
X marks a test IDoc
OUTMOD
Output mode
CHAR 1
Outbound only; 2 = transfer immediately, 4 = collect IDocs
TABNAM
Name of the control record structure
CHAR 10
Holds EDI_DC40 in the file or tRFC representation

Field names and lengths are as delivered in standard SAP. Lengths of rarely used fields can differ by release, so confirm in SE11 for table EDIDC and structure EDI_DC40 on your system.

Want IDoc errors explained automatically?

Optional: a short call on how a private, read-only assistant could read your IDoc tables and summarise failures for your support team.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this reference

Type a field name or a keyword such as partner or port into the search box to narrow the table. Use the Notes column to see typical values. Export the result to Excel or CSV if you want to paste field lists into an interface specification or a mapping document for the integration team.

  • Search by field name to confirm length before building a file interface
  • Search by direction or partner to find the fields used by partner profile lookup
  • Export the table into your interface specification

EDIDC versus EDI_DC40

Table EDIDC stores the control record in the database. Structure EDI_DC40 is the representation used when IDocs travel through tRFC calls, files and middleware such as SAP PI/PO or Integration Suite. The two carry almost the same fields, but EDI_DC40 adds TABNAM and lacks the client field in file transfers. In ABAP, function modules such as IDOC_INBOUND_ASYNCHRONOUS take the older EDIDC format while newer interfaces use EDI_DC40.

Message type versus IDoc type

MESTYP says what the document means, for example ORDERS for a purchase order or sales order. IDOCTP says which segment structure carries it, for example ORDERS05. One message type can use several IDoc types over releases, and one IDoc type can serve several message types. Partner profiles in WE20 are keyed by message type, not IDoc type, so a wrong MESTYP is a classic reason for status 56 or 64 errors.

Common mistakes

Developers often fill sender and receiver partner numbers with system IDs instead of logical system names, forget the partner type, or leave the port blank. Another trap is confusing DIRECT values: outbound is 1 and inbound is 2, and the same partner can have a different profile entry per direction.

  • Use the logical system name from BD54 when the partner type is LS
  • Check the port exists in WE21 before sending
  • Set DIRECT correctly before calling inbound function modules

Frequently Asked Questions

What is the difference between EDIDC and EDID4?

EDIDC holds one control record per IDoc, which is the header. EDID4 holds the data records, which are the segments with their field content stored as a string. EDIDS holds the status history. Together these three tables are what you query to analyse IDoc traffic directly in the database.

What does DIRECT mean in an IDoc?

DIRECT is a one-character field that tells you the direction as seen from the system you are in. A value of 1 means outbound, so the IDoc was created here and sent out. A value of 2 means inbound, so it arrived here to be posted into an application.

Which field links an IDoc to its partner profile?

For outbound IDocs, SAP looks up the partner profile using the receiver partner number, partner type and message type, optionally with function, code and variant. For inbound IDocs it uses the sender partner details. The profile then decides the port, output mode and process code.

Can I add my own fields to the control record?

No. The control record structure is fixed by SAP. If you need extra data, carry it in a custom segment through an IDoc extension, or use the reference fields such as REFINT and REFMES only for what they are meant for, which is tracking external transmission references.

If your team spends time chasing IDoc errors across systems, Netray can build a private assistant that reads IDoc tables and explains failures in plain language, with read-only access by default.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring