SAPFree referencePDF, Excel, Word exportSAP ECC / S/4HANAAll SAP ECC 6.0 tools

SAP IDoc Message Types Reference

An IDoc message type tells SAP what business event a document represents, while the basic IDoc type defines the segment structure. This reference lists the message types integration developers meet most often, with the basic type and the EDI set they usually pair with.

Download:
Message typeTypical basic IDoc typeBusiness meaningTypical flowUsual X12 setUsual EDIFACT message
ORDERS
ORDERS05
Purchase order (outbound) or customer order (inbound)
Both
850
ORDERS
ORDRSP
ORDERS05
Order response / confirmation
Both
855
ORDRSP
ORDCHG
ORDERS05
Purchase order change
Both
860
ORDCHG
DESADV
DELVRY03
Delivery / advance ship notice
Outbound from supplier
856
DESADV
SHPMNT
SHPMNT05
Shipment (transportation) data
Both
204
IFTMIN
INVOIC
INVOIC02
Billing document / invoice
Both
810
INVOIC
REMADV
PEXR2002
Payment advice from payer
Both
820
REMADV
PAYEXT
PEXR2002
Extended payment order (payment run)
Outbound
820
PAYEXT
DELFOR
DELFOR02
Delivery schedule / forecast
Both
830
DELFOR
DELINS
DELFOR02
Delivery schedule with JIT detail
Both
862
DELJIT
INVRPT
INVRPT01
Inventory report / stock status
Both
846
INVRPT
MATMAS
MATMAS05
Material master distribution
ALE distribution
None standard
PRODAT
DEBMAS
DEBMAS07
Customer master distribution
ALE distribution
None standard
PARTIN
CREMAS
CREMAS05
Vendor master distribution
ALE distribution
None standard
PARTIN
BOMMAT
BOMMAT05
Bill of material for a material
ALE distribution
None standard
None standard
CLFMAS
CLFMAS02
Classification (class assignment) master
ALE distribution
None standard
None standard
ADRMAS
ADRMAS02
Address master
ALE distribution
None standard
None standard
COND_A
COND_A01
Pricing condition records
ALE distribution
832 (price/sales catalog)
PRICAT
WMMBXY
WMMBID02
Goods movement posting from external WM or MES
Inbound
None standard
None standard
HRMD_A
HRMD_A07
HR master data (org units, positions, persons)
ALE distribution
None standard
None standard

Basic type version suffixes (05, 07 and so on) depend on your release. Check WE60 for the segments in your system and WE82 for the message type to basic type assignment. The X12 and EDIFACT columns show the usual business equivalents, not a fixed standard mapping.

Want IDoc errors explained automatically?

Ask for a short review of how an on-prem AI assistant could read your IDoc error logs and suggest fixes.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the reference

Type a message type, a basic type or a business word such as invoice into the search box and the table filters instantly. Use the basic type column to open the structure in WE60 and the flow column to decide whether you need a partner profile in WE20 for inbound or outbound. Export the filtered rows to Excel to attach to an interface specification or a mapping workshop.

Message type versus basic type versus extension

The message type (WE81) names the business meaning. The basic type (WE30) is the segment layout. An IDoc extension adds custom segments to a basic type. The link between them is maintained in WE82. One basic type can serve several message types, which is why ORDERS, ORDRSP and ORDCHG all use ORDERS05.

  • WE81 lists message types, WE82 assigns them to basic types
  • WE30 is the IDoc type development editor
  • WE60 shows the documentation of a type and its segments
  • Custom fields normally go in a Z extension, never a modified standard type

Master data versus transactional IDocs

MATMAS, DEBMAS and CREMAS are master data messages usually distributed through ALE with change pointers (BD50, BD61 and BD21). ORDERS, DESADV and INVOIC are transactional messages normally generated from output control (NACE or the newer output management in S/4HANA). The delivery mechanism matters when you troubleshoot why an IDoc was or was not created.

Common mistakes

Teams often copy a standard type to a Z type instead of using an extension, which makes upgrades painful. Others assume the X12 set is fixed, when in practice the EDI subsystem or CPI mapping decides it. Always confirm the exact basic type version for your release before writing a mapping.

Frequently Asked Questions

What is the difference between an IDoc message type and basic type?

The message type describes the business meaning, such as INVOIC for an invoice. The basic type defines the segments and fields, such as INVOIC02. The assignment between the two is stored in WE82, and several message types can share one basic type.

Which IDoc type is used for a purchase order?

A purchase order is normally sent with message type ORDERS and basic type ORDERS05 through output control. The same basic type is used for order responses (ORDRSP) and changes (ORDCHG). Check your release in WE60 to confirm the version.

How do I find all IDoc types in my system?

Use WE30 for basic types, WE81 for message types and WE82 for the assignment between them. WE60 gives the documentation view with segments and field descriptions, which is the most useful for mapping work.

Is the X12 column an official SAP mapping?

No. It shows the EDI transaction set that normally carries the same business content. The actual mapping is built in your EDI subsystem, SAP CPI or PI/PO, and varies by trading partner and implementation guideline.

If you are building or monitoring many IDoc interfaces, Netray can help you add an AI layer that explains failed IDocs in plain language, on-prem if needed.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring