SAP Lot Sizing Procedures and MRP Parameters Reference
Lot sizing is the lever that decides how many planned orders MRP creates and how large they are. This reference lists the standard SAP lot size keys and the material master fields that control quantities, dates and exceptions, so you can read a planning result and know which field produced it.
| Key / field | Kind | Meaning | When to use / watch for |
|---|---|---|---|
EX | Lot size key | Lot-for-lot order quantity | Order quantity equals the shortage. Good for expensive or low volume parts. |
FX | Lot size key | Fixed lot size | Uses the fixed lot size BSTFE. Multiple lots are created if the shortage is larger. |
HB | Lot size key | Replenish to maximum stock level | Order quantity fills up to the maximum stock level BSTMA. Common for reorder point planning. |
TB | Lot size key | Daily lot size | Groups requirements for a day into one order. |
WB | Lot size key | Weekly lot size | Groups requirements for a week into one order. |
MB | Lot size key | Monthly lot size | Groups requirements for a month into one order. |
PK | Lot size key | Lot size by flexible period length | Combines requirements across the number of days set by the period. |
DISLS | Material master field | Lot sizing procedure key | Stored in MARC. Set on the MRP 1 view. |
BSTMI | Material master field | Minimum lot size | Order quantity is raised to this value if lower. |
BSTMA | Material master field | Maximum lot size | Orders above it are split into multiple lots. |
BSTFE | Material master field | Fixed lot size | Used with the FX key. |
BSTRF | Material master field | Rounding value | Order quantity is rounded up to a multiple of this value. |
EISBE | Material master field | Safety stock | MRP plans to keep at least this stock. Triggers exception 96 if breached. |
DISMM | Material master field | MRP type | Decides whether and how the material is planned. |
PD | MRP type | MRP (requirements planning) | Standard type for deterministic planning on demand. |
VB | MRP type | Manual reorder point planning | Reorder point triggers planning. Uses reorder level and lot size. |
VV | MRP type | Forecast-based planning | Uses forecast values for requirements. |
ND | MRP type | No planning | Material is excluded from MRP. |
DISPO | Material master field | MRP controller | Groups materials for MD06 and MD07 lists. |
DISGR | Material master field | MRP group | Drives planning parameters like strategy, horizons and exception handling. |
BESKZ | Material master field | Procurement type | E in-house, F external, X both. |
SOBSL | Material master field | Special procurement key | Subcontracting, stock transfer, phantom, and other variants. |
PLIFZ | Material master field | Planned delivery time (days) | For external procurement. A major driver of MRP dates. |
DZEIT | Material master field | In-house production time (days) | Used when no routing time is determined or for fixed lead time. |
WEBAZ | Material master field | Goods receipt processing time (days) | Added after delivery or production for inspection and put away. |
FHORI | Material master field | Scheduling margin key | Adds float before and after production and sets the opening period. |
STRGR | Material master field | Planning strategy group | Examples: 10 make-to-stock, 20 make-to-order, 40 planning with final assembly. |
Dynamic and optimizing | Concept | Part period balancing, least unit cost, Groff and similar procedures | Available in configuration, using cost inputs. Use only after testing against real demand. |
Field names refer to the material master MARC data. Lot size key availability depends on configuration, so check your own system for additional or modified keys.
Test lot size changes safely
Optional: an expert review of how to simulate lot size changes against your demand data.
Optional. The tool and every export work without this. No spam.
How to use the reference
Open the material master MRP 1 and MRP 2 views and compare the fields to the reference. Search for a key like HB or a field like BSTRF to see what it does. Use the notes to decide whether a lot size procedure fits the part. Export the table to Excel to document planning parameters in a master data standard for your plant.
- Compare lot size key with minimum and rounding values
- Check planned delivery time before changing lot size
- Document which keys are allowed per MRP group
Static lot sizing in practice
Exact lot size (EX) orders precisely the shortage and suits expensive or custom parts. Fixed lot size (FX) is natural when a process makes a standard batch. Replenish to maximum (HB) is common with reorder point planning. Period lot sizes (TB, WB, MB) group several requirements into one order and reduce setups and order count, at the cost of more inventory for early demand.
Other fields that change the order quantity
Minimum lot size raises small shortages to a minimum, maximum lot size splits large ones, and rounding value forces the quantity to a multiple such as a pallet or tray. Safety stock adds a buffer, and MRP type decides whether the material is planned at all. Together they explain most surprises, for example a planned order of 500 for a shortage of 120.
Common mistakes
Setting a high minimum lot size on a low runner builds excess stock. Using period lot sizes with long periods causes early orders and exception 15 messages. Ignoring rounding values in a unit of measure conversion creates odd quantities.
- Review minimum lot size yearly
- Use shorter periods for expensive parts
- Check MRP type for materials that never plan
Frequently Asked Questions
What does lot size key EX mean in SAP?
EX is exact or lot-for-lot ordering. MRP creates an order for the net shortage, adjusted only by minimum lot size, maximum lot size and rounding value if they are maintained. It keeps inventory low but can create many small orders.
What is the difference between FX and HB?
FX creates orders in multiples of a fixed lot size defined in the material master. HB orders enough to fill stock up to the maximum stock level. FX suits fixed batch processes, while HB fits reorder point style replenishment.
Where is the lot size set in the material master?
The lot size key sits on the MRP 1 view in the field behind DISLS in table MARC. Minimum, maximum, fixed and rounding values are on the MRP 1 view and lot size data section, while lead time fields are in MRP 2.
Why did MRP create a bigger order than the shortage?
Most likely minimum lot size, rounding value or a period lot size key raised the quantity. Safety stock can also add to the net requirement. Check these fields on MRP 1 for the material.
If you want to test lot size changes before touching the material master, we can build a simulation over your SAP demand data that shows the effect on order count and inventory, read only.
Related Tools
SAP MD04 Exception Messages and MRP Elements Reference
A searchable lookup of MD04 element abbreviations, key exception messages and the MRP transactions you use to act on them.
SAPSAP MRP Controller Daily Worklist Template
A fill-in daily worklist for MRP controllers to record exception reviews, actions taken and open items from MD04, MD06 and MD07.
SAPSAP Work Center Capacity Planning Calculator
Calculate available capacity, capacity requirements and load percent for a work center from shifts, utilization, setup and run times.
SAPSAP Planned Order to Production Order Conversion Checklist
A step by step checklist to verify materials, BOM, routing, capacity and release before converting planned orders to production orders in SAP.
More SAP tools
See all- SAP Production Order Types, Categories and Statuses Reference
- SAP Routing Upload Worksheet (Excel)
- SAP BOM Usage, Status and Item Category Reference
- SAP QM Database Tables Reference
- SAP QM Transaction Codes Reference
- SAP QM Go-Live and Cutover Checklist
- SAP QM Maturity Assessment
- SAP Movement Types Reference
- SAP Purchasing Document Types Reference