SAPFree calculatorPDF, Excel, Word exportSAP PMManufacturing

Repair vs Replace Equipment Calculator for SAP PM Asset Decisions

At some point an old machine costs more each year than a new one would. This calculator puts both on the same annual basis so you can see where repair stops being the cheaper choice, using cost data you already have in SAP PM.

Your numbers

per year

Labor, parts and contractor cost from order settlement history for the equipment.

hours
per hour

Lost contribution margin plus idle labor for each hour the process is stopped.

cost
cost
12 years
9 %
per year
hours

Your results

Annual cost of keeping the old asset
$113,500
Equivalent annual cost of the new asset
$56,820
Capital recovery factor
0.1397
Annualised capital cost of the new asset
$34,820
Annual advantage of replacing (negative = repair)
$56,680

Simplified equivalent annual cost model before tax. It ignores tax depreciation, inflation, capacity changes and project risk.

Save results:

Old vs new annual cost as repair spend rises

Sweeps Current asset maintenance cost per year from 0 to 120000, holding your other inputs fixed.

Asset cost history extract

Optional expert review of extracting equipment lifecycle cost from SAP PM for replacement cases.

Optional. The tool and every export work without this. No spam.

How to use it

Pull the last two to three years of maintenance cost for the equipment from order settlement (settled to the equipment, cost center or asset) and total the breakdown hours from notifications. Enter your cost of downtime, the replacement quote, expected resale value, economic life and cost of capital. The tool returns the annual cost of keeping the asset, the equivalent annual cost of the new one and the difference.

  • Use the trend, not the best year, for old asset cost.
  • Include contractor and emergency premiums in repair cost.
  • Use a realistic downtime cost, not only labor idle time.

The equivalent annual cost method

The new asset's capital cost is spread across its life with the capital recovery factor, r divided by one minus (1 plus r) to the minus n. The resale value is discounted back and netted off the price. Add yearly maintenance and downtime to get the equivalent annual cost. Because both sides are annual figures, assets with different lives are comparable. The chart shows the break-even repair spend where the lines cross.

Limits and common mistakes

The most common error is comparing the old asset's maintenance only with the new asset's price. That ignores downtime and the time value of money. Another is projecting last year's repair cost forward when age-driven cost usually accelerates. Also test the answer with a sensitivity run: change downtime cost and the discount rate and see whether the recommendation holds.

  • Include spare parts obsolescence for old controls.
  • Add safety or compliance gaps that the new asset closes.
  • Treat the result as one input to a capital request, not the decision itself.

Frequently Asked Questions

What is equivalent annual cost?

Equivalent annual cost converts the purchase price, resale value and running costs of an asset into a single yearly figure using a discount rate. It lets you compare assets with different lives on an equal basis.

Where do I find maintenance cost per equipment in SAP?

Settle maintenance orders to the equipment or functional location and use order reports such as the cost analysis in the maintenance information system. Hours and breakdowns come from notifications.

How do I estimate the cost of downtime?

Use lost contribution margin per hour of the constrained process plus idle labor and any penalties. If the machine is not a bottleneck, downtime cost may be lower because other equipment can absorb the load.

Does this include tax?

No. The model is pre-tax and keeps inputs simple. Your finance team should rerun the final case with depreciation, tax and inflation assumptions.

If you want a per-equipment cost and downtime history pulled from SAP PM to feed this analysis, Netray can build a read-only report on your own infrastructure.