SAP QM Vendor Quality Score Worksheet
SAP vendor evaluation can take a quality score from QM, but suppliers often ask how the number is made. This worksheet lets you calculate acceptance rate, defective PPM and a weighted score from raw counts and test your weights before you change anything in the system.
| Vendor | Lots inspected | Lots accepted | Quantity received | Quantity rejected | Open complaints | Lot acceptance rate | Defective PPM | Quality score (0-100) | |
|---|---|---|---|---|---|---|---|---|---|
95.8% | 6,458 | 95.1458 | |||||||
85% | 18,636 | 73.9091 | |||||||
100% | 1,333 | 99.6 | |||||||
77.8% | 63,333 | 60.4444 | |||||||
100% | 0 | 100 |
The score weights acceptance rate 70 percent and PPM 30 percent, deducting 5 points per open complaint, and treats 100,000 PPM or more as zero on the PPM part. These weights are examples. Agree your own weights with purchasing and compare against your SAP vendor evaluation configuration.
Score vendors from live SAP data
Optional talk about producing this scorecard directly from QM tables on a schedule.
Optional. The tool and every export work without this. No spam.
How to use it
Enter one row per vendor for the period, using inspection lot counts from QM lot reports (for example from QA32 filtered by vendor and date) and received and rejected quantities from the usage decisions. Open complaints can come from quality notifications of type vendor complaint. The score, acceptance rate and PPM calculate in each row.
- Use the same period for all vendors
- Count only lots with a usage decision
- Take rejected quantity from the defect records or the rejected usage decision
- Review vendors with fewer than ten lots with care
The formulas
Lot acceptance rate is accepted lots divided by inspected lots, times 100. Defective PPM is rejected quantity divided by received quantity, times one million. The score converts PPM into a 0 to 100 figure by dividing PPM by 1,000 and subtracting from 100 with a floor at zero, then blends it with the acceptance rate and deducts a penalty per open complaint. The result is limited between 0 and 100.
Reading the table
A vendor with 100 percent lot acceptance and a few PPM sits near 100. A vendor with good acceptance but high rejected counts on very large lots shows up through PPM. Use both. A low lot count makes the rate unstable: one rejected lot out of four moves the rate by 25 points.
Common mistakes
Mixing units of measure so quantities are not comparable. Using PPM on a sample quantity instead of on lot quantity. Counting a lot twice after a re-inspection. Using a score alone to block a vendor without looking at the failure mode and corrective action.
Frequently Asked Questions
Is this the same as SAP vendor evaluation?
No. SAP vendor evaluation uses criteria and weights you configure in purchasing. This worksheet lets you test an approach with spreadsheet data. Use it to agree weights before configuring the system.
What is a good PPM level?
It depends on the part and the customer. Automotive suppliers often agree targets of tens of PPM or lower, while commodity parts may allow thousands. Set targets per commodity with your customers and suppliers.
Why does the score drop with complaints?
Complaints show problems that inspection did not catch. The five-point penalty is an example weight that you can change when you adapt the method in your own scorecard.
Can I use it for incoming inspection by skip lot?
Yes, but lots skipped are not inspected. Count only inspected lots, and keep the skipped lots visible in a note so the acceptance rate is not read as full coverage.
If you want vendor scores calculated straight from SAP data, Netray can help read inspection and complaint data without changing vendor evaluation.
Related Tools
SAP QM Quality Notification 8D Report Template
An 8D problem-solving report laid out to match the data in a SAP QM quality notification, so the document and the SAP record stay aligned.
SAPSAP QM Inspection Results Recording Worksheet
Record measured values per characteristic, see deviation from target and in-tolerance status, and keep a paper copy to key into SAP QE51N.
SAPSAP QM Inspection Workload and FTE Calculator
Turn inspection lot volume, characteristics per lot and skip-lot rate into monthly inspection hours, staff needed and cost.
Field Service & QualitySupplier Quality Scorecard
Rate a supplier across defect rates, delivery, corrective action, certifications, and risk to get a clear classification and recommended actions.
More SAP tools
See all- SAP QM Certificate of Analysis Profile Template
- SAP QM Calibration Equipment Register Worksheet
- SAP Movement Types Reference
- SAP Purchasing Document Types Reference
- SAP MIGO Goods Receipt Checklist
- SAP GR/IR Clearing Worksheet
- SAP Release Strategy Design Template
- SAP Source List Upload Template
- SAP Info Record Mass Upload Worksheet
Keep exploring
Free tools
- SAP QM Lot Rejection Rate, PPM and Sigma Level CalculatorConvert lots inspected, lots rejected and defective units into rejection rate, PPM, DPMO and sigma level.
- SAP QM in Procurement Setup ChecklistCheck each step needed to run goods receipt inspection for purchased materials, from QM control key to vendor release.
- SAP QM Implementation Readiness ChecklistCheck master data, integration points, inspection setup and user readiness before cutting over SAP QM.
ERP fixes and how-tos
- What is a quality info record in SAP QM, and how do customer returns trigger inspection?What the quality info record (QI01) is in SAP QM, how it controls inspection per vendor and material, and how customer returns trigger inspection.
- SAP QM Integration With EWM and WM: Steps and ConfigurationHow SAP QM works with WM and EWM: inspection lot at goods receipt, quality inspection stock, usage decision, putaway and the configuration each model needs.
- What Is First Article Inspection in SAP, and How to Run It in QMFirst article inspection in SAP means inspecting the first piece of a production run through QM. Learn the inspection type, lot trigger and results recording.
AI on your ERP
- AI for SAP Quality Management: Notifications, 8D, and CAPA Without the Manual DraftingAI grounded on SAP QM data that triages notifications, drafts 8D and CAPA reports, and summarizes inspection trends, deployed on-prem for full traceability.
- AI for SAP S/4HANA in Automotive: Scheduling Agreements, Quality Notifications and Line-Side PressureAI on SAP S/4HANA for automotive suppliers: scheduling agreements, JIT/JIS, PPAP and 8D, answered from live data on your own infrastructure, read-only.