SuiteScript 2.1 RESTlet Skeleton Generator
A RESTlet is the standard way to expose custom endpoints from NetSuite. This generator produces a SuiteScript 2.1 RESTlet with get, post, put and delete handlers, structured errors and audit logging, so you start from a clean, reviewable file instead of a blank editor.
Fill in
RESTlet script
/**
* @NApiVersion 2.1
* @NScriptType Restlet
* @NModuleScope SameAccount
* @description Customer Sync RESTlet
* @author Integration team
*/
define(['N/record', 'N/log', 'N/error'], (record, log, error) => {
const RECORD_TYPE = 'customer';
const LOG = 'CustSyncRL';
const fail = (name, message) => {
throw error.create({ name: name, message: message, notifyOff: true });
};
const get = (params) => {
if (!params || !params.id) {
fail('MISSING_ID', 'Query parameter id is required');
}
const rec = record.load({ type: RECORD_TYPE, id: params.id });
return {
id: params.id,
companyname: rec.getValue({ fieldId: 'companyname' }),
email: rec.getValue({ fieldId: 'email' })
};
};
const post = (body) => {
if (!body) {
fail('MISSING_BODY', 'Request body is required');
}
const rec = record.create({ type: RECORD_TYPE, isDynamic: false });
rec.setValue({ fieldId: 'companyname', value: body.companyname });
rec.setValue({ fieldId: 'email', value: body.email });
const newId = rec.save();
log.audit(LOG, 'Created ' + RECORD_TYPE + ' ' + newId);
return { id: newId };
};
const put = (body) => {
if (!body || !body.id) {
fail('MISSING_ID', 'Body must include id');
}
const values = {};
values['companyname'] = body.companyname;
values['email'] = body.email;
record.submitFields({ type: RECORD_TYPE, id: body.id, values: values });
log.audit(LOG, 'Updated ' + RECORD_TYPE + ' ' + body.id);
return { id: body.id };
};
const doDelete = (params) => {
if (!params || !params.id) {
fail('MISSING_ID', 'Query parameter id is required');
}
record.delete({ type: RECORD_TYPE, id: params.id });
log.audit(LOG, 'Deleted ' + RECORD_TYPE + ' ' + params.id);
return { deleted: params.id };
};
return { get: get, post: post, put: put, delete: doDelete };
});Calling it
GET https://<accountid>.restlets.api.netsuite.com/app/site/hosting/restlet.nl?script=<scriptId>&deploy=<deployId>&id=<internalId> Use the Authorization header for token-based authentication or OAuth 2.0. Send JSON with Content-Type: application/json for post and put.
Starting point only. Confirm field ids exist on your record, decide whether deletes should be exposed at all, add input validation and consider using a dedicated integration role with least privilege. Deploy to a sandbox first and test each handler.
Safe NetSuite access for AI and integrations
Optional: talk through a read-only, role-aware access pattern for your NetSuite account.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter the script name, the record type id and two fields to return and write. Copy the generated script into a .js file, upload it to the File Cabinet and create a script record of type RESTlet. Deploy it with a role that has only the permissions it needs, then test each handler from a REST client in a sandbox account.
- Use lowercase record type ids such as customer or salesorder.
- Check field ids on the record before you test.
- Remove handlers you do not need to shrink the attack surface.
Design choices in the template
The template loads one record per get, which is fine for single-record reads but expensive in loops. The put handler uses submitFields because it is cheaper than load and save and avoids overwriting unrelated fields. Errors are raised with N/error so callers get a named failure. Logging uses audit level for writes, so you can trace integration activity without flooding the log with debug entries.
Limits and cautions
A RESTlet has its own governance allowance and a limit on concurrent requests per account, so build clients with retry and backoff. Keep payloads small and paginate list endpoints. Do not return whole records unless the caller needs them, since this exposes fields the integration should not see. For standard record CRUD, the built-in REST record API may be simpler than any custom script.
Frequently Asked Questions
Should I use a RESTlet or the REST record API?
Use the REST record API for standard record access because it needs no code. Use a RESTlet when you need custom logic, a combined payload or behavior the standard API does not offer.
Why does the template use submitFields in put?
submitFields updates only the listed fields and costs fewer governance units than loading and saving a full record. It also runs fewer sourcing and validation steps, so confirm it fits your field rules.
How do I authenticate calls to a RESTlet?
Use token-based authentication or OAuth 2.0 with an integration record and a role that can run the script. Each request must carry a valid Authorization header for the account.
Can I return an HTTP status code from the script?
A thrown error produces an error response with a status that NetSuite chooses. For fine control over status codes you need to handle errors in the client and return structured error bodies from the script.
If you want an integration or agent to read NetSuite safely, Netray can help design a read-only access pattern with role-based permissions and approvals for any write-back.
Related Tools
NetSuite Script and REST Error Codes Reference
Common NetSuite error names and HTTP status codes with the usual cause and the first thing to check.
NetSuiteSuiteScript Script Types and Entry Points Reference
Every SuiteScript 2.x script type with its entry point functions, typical use and governance guidance in one searchable table.
NetSuiteSuiteScript Code Review Checklist
A practical review checklist for SuiteScript 2.x covering structure, governance, error handling, security and deployment.
NetSuiteSuiteScript 2.x Modules Reference
A searchable table of the SuiteScript 2.x N/ modules, what each one is for and the methods you reach for most.
More NetSuite tools
See all- NetSuite Saved Search Formula Generator
- NetSuite CSV Import Template Guide
- NetSuite Role Permission Matrix Worksheet
- NetSuite Inventory Costing Method Reference
- NetSuite Month End Close Checklist
- NetSuite License Cost Estimator
- NetSuite User Access Request Form Template
- NetSuite Custom Record Design Spec Template
- NetSuite SuiteScript Deployment Handover Template
New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- NetSuite SuiteScript 2.1 RESTlet Skeleton GeneratorFill in a script name, record type and fields to get a SuiteScript 2.1 RESTlet with GET lookup, POST create, logging and error handling.
- SuiteScript 2.1 User Event Script SkeletonA copy-ready SuiteScript 2.1 user event script with the JSDoc annotations, entry points, context checks and error logging you need to start.
- SuiteScript Map/Reduce Skeleton GeneratorA SuiteScript 2.1 map/reduce template with a SuiteQL input stage, map and reduce handlers and a summarize stage that reports every error.
Integrations
- How to add WhatsApp to Oracle NetSuiteHow to connect WhatsApp Business to Oracle NetSuite: SuiteScript triggers, RESTlets, template messages, opt-in rules and two-way replies that post back to records.
- How to add AI agents to Oracle NetSuiteHow to add AI agents to Oracle NetSuite: SuiteQL and REST tool layer, RESTlet writes, role-scoped tokens, human approval, and where a private model fits.