SyteLine Item Master Fields Reference (item_mst Columns Explained)
The item master is the most joined table in SyteLine, and a handful of its fields decide how an item is planned, costed and tracked. This reference explains those fields in plain language so you can set up items correctly and write queries that interpret the codes.
| Field (item_mst) | Meaning | Typical values | What it drives |
|---|---|---|---|
item | Item number | Alphanumeric key, unique per site | Every join to jobs, orders, POs and inventory |
description | Item description | Free text | Documents, reports and lookups |
p_m_t_code | Source of supply | P purchased, M manufactured, T transferred | Whether MRP plans a PO, a job or a transfer |
cost_type | Costing method | S standard, A average, F FIFO, L LIFO | How inventory is valued and relieved |
abc_code | ABC classification | A, B or C | Cycle count frequency and reporting |
u_m | Stocking unit of measure | EA, KG, M and other defined units | Quantity on every inventory and order transaction |
stocked | Stocked item flag | 1 yes, 0 no | Whether on hand balances are kept |
lot_tracked | Lot tracking flag | 1 yes, 0 no | Lot capture at receipt, issue and shipment |
serial_tracked | Serial tracking flag | 1 yes, 0 no | Serial number capture on transactions |
product_code | Product code | Code defined in prodcode_mst | GL account defaults and reporting rollups |
family_code | Family code | Code defined in the family code table | Grouping for planning and reporting |
lead_time | Planned lead time | Days | Offset of planned orders in MRP and planning |
safety_stock | Safety stock quantity | Number in stocking UoM | Net requirements in MRP |
order_min | Minimum order quantity | Number in stocking UoM | Size of planned orders |
order_mult | Order multiple | Number in stocking UoM | Rounding of planned order quantities |
unit_cost | Total standard unit cost | Sum of the five cost elements | Standard cost valuation and variance |
matl_cost | Material cost element | Currency per unit | Material part of the standard cost |
lbr_cost | Labor cost element | Currency per unit | Labor part of the standard cost |
fovhd_cost | Fixed overhead cost element | Currency per unit | Fixed overhead part of the standard cost |
vovhd_cost | Variable overhead cost element | Currency per unit | Variable overhead part of the standard cost |
out_cost | Outside (subcontract) cost element | Currency per unit | Outside processing part of the standard cost |
phantom_flag | Phantom item flag | 1 yes, 0 no | Whether the item is exploded through rather than stocked |
Field names reflect common releases. Current cost fields carry a cur_ prefix and may differ from standard. Check the item form and your database for custom and version specific columns before building reports on them.
Want an item master quality scan?
An optional read-only scan of your item data for missing codes, cost gaps and inconsistent units, with findings you review before any change.
Optional. The tool and every export work without this. No spam.
How to use this reference
Search for a field name from a query, or a concept such as lot or cost, to see the meaning, the typical stored values and the processes it drives. The last column is the important one: it tells you what breaks when a value is wrong. Export the table to Excel if you want a data conversion checklist that lists which fields every imported item must populate.
- Source of supply and cost type are required decisions for every item
- Tracking flags should be set before any stock exists
- Check product code, because it controls GL account defaults
Fields that cause the most support tickets
Changing cost_type after transactions exist is restricted for good reason, because inventory valuation and relief depend on it. Lot and serial flags work the same way: switching them on later requires the on hand to be converted. The p_m_t_code field is another frequent cause of confusion, since an item set to manufactured with no active routing or BOM will plan jobs that cannot be released properly.
Reading the cost fields
The standard cost is built from five elements: material, labor, fixed overhead, variable overhead and outside. unit_cost is their total. When you compare standard to actual, break the variance back to these five elements instead of looking at the total, because a labor rate problem and a purchase price problem need different owners. A cost roll updates the standard elements from routings and BOMs, so check both before rolling.
Frequently Asked Questions
What does p_m_t_code mean in SyteLine?
It is the item's source of supply: P for purchased, M for manufactured and T for transferred. Planning uses it to decide whether a requirement becomes a purchase order, a job or a transfer order.
Can I change the cost type of an existing item?
Only under restrictions, usually when there is no on hand and no open transactions, or through a controlled conversion. Plan the choice carefully before go live and involve the cost accountant.
Where are item quantities stored?
Not in item_mst. On hand quantities live in itemwhse_mst by warehouse, and in itemloc_mst and lot_loc_mst by location and lot. Summing item_mst fields will not give you stock.
Why do custom fields on items disappear after an upgrade?
Custom columns need to be carried through the upgrade process and maintained in the right extension mechanism. Document them before an upgrade and test them in the regression pass.
If your item master has years of inconsistent codes, Netray can help profile it and propose clean up rules for human review before anything is written back.
Related Tools
SyteLine Database Tables Reference
Searchable lookup of the main SyteLine SQL tables, what each holds and its usual business key, for writing queries and reports.
Infor SyteLineSyteLine IDO Names Reference
Searchable list of common SyteLine IDO names with the underlying tables, to speed up REST integrations and form work.
Infor SyteLineSyteLine Upgrade Regression Test Checklist
A practical regression checklist for SyteLine upgrades across business processes, customizations, reports and integrations.
Infor SyteLineSyteLine MRP Health Check
Diagnose why your SyteLine MRP output is noisy or ignored, scoring data accuracy, parameters, and planner behavior across ten dimensions.
More Infor SyteLine tools
See all- SyteLine Form Personalization Checklist
- SyteLine User Access Request Form Template
- SyteLine Custom Report Request Template
- SyteLine Data Conversion Mapping Worksheet
- SyteLine UAT Test Script Worksheet
- SyteLine Cutover Plan Worksheet
- SyteLine Change Request Form Template
- SyteLine Cycle Count Variance Worksheet
- SyteLine Database Growth Forecast Calculator
New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- SyteLine SQL Query Generator for Item, Job and Order TablesFill in site, item prefix, job status and date to produce read-only SQL for item master, jobs and open customer order lines.
- SyteLine Item Import WorksheetA staging sheet for item master data with computed first-buy value, ready to clean in the browser and export to Excel or CSV for loading.
- Infor XA Item Master Field Review WorksheetAn editable worksheet for walking through XA item master fields, deciding what to keep, clean or map, and who owns each decision.
ERP fixes and how-tos
- How to Change an Item's Standard Cost in SyteLineUpdate a SyteLine item's standard cost by hand or through Cost Rollup, then run Recost Inventory to revalue on-hand stock and post the GL variance correctly.
- SyteLine item usage report: get item consumption historyHow to get item usage history in SyteLine for reorder points and MRP tuning: standard transaction reports, a SQL pull from matltran and an Excel pivot.
- MRPeasy Custom FieldsHow to approach custom fields in MRPeasy on items, customer orders and BOMs: where to add them, what they can drive, reporting limits and API alternatives.
Guides
- How to Set Up Item Master Defaults in Infor SyteLineStep-by-step guide to setting up item master defaults in Infor SyteLine. Configure default planning, costing, and inventory settings for new items.
- SyteLine Global Item Master Management GuideManage a global item master across multiple SyteLine sites with centralized item creation, cross-site attribute synchronization, and governance workflows.
- ERP Master Data Cleanup with AI: A Practical GuideClean up ERP master data with AI: duplicate detection, standardization, and a governance model that keeps your item and customer records clean long term.