Developer ToolsFree checklistPDF, Excel, Word exportInfor SyteLineAll Infor SyteLine (CloudSuite Industrial) tools

SyteLine IDO API Security Hardening Checklist

This checklist hardens the SyteLine 9 and CSI 10 IDO request service (IDORequestService) when you expose its REST or SOAP endpoints to integrations and scripts. It covers accounts, transport, tokens, request hygiene, monitoring and licensing.

0%

0 of 25 items complete

8 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Accounts

Transport

Tokens and secrets

Request hygiene

Monitoring

Licensing

Critical items are the ones an auditor or attacker finds first: shared or administrator accounts, plain HTTP or internet exposure, tokens and .ionapi files in the wrong place, unbounded loads and filters built from raw input. Fix those before adding new integrations.

Get your integration users reviewed

Send us the list of integration users, their groups and callers and we will flag the highest risks first.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Run the checklist once per integration, not once per system, because each caller has its own user, network path and request pattern. Export it to Excel with one column per integration and keep it with the interface design. Re-run it when an integration changes owner, starts calling new IDOs, or moves from internal network access to ION API Gateway. Pair it with the general SyteLine user access audit for the human side.

Where this lives in SyteLine

The IDO request service runs on the server that hosts IDORequestService and authenticates callers as SyteLine users. What they can read or invoke is governed by group authorizations on IDOs and methods, maintained on the group authorization forms for your release. REST v2 load requests take parameters such as properties, filter, recordcap and readonly. Login failures raise the SessionOnLoginFailed framework event, so an application event handler can alert on them.

  • Group object authorizations: IDO and method access
  • recordcap and readonly: limit load cost and locking
  • SessionOnLoginFailed: alert on failed logins
  • ION API Gateway: OAuth2 for external callers

Worked example

A shipping integration reads open orders every five minutes as an administrator, with properties=* and recordcap=0. Hardening gives it a dedicated user in a group with read access to the order IDOs only, a property list of nine columns, readonly=True, a recordcap matched to the largest expected batch, and a filter built from a validated date parameter. The caller moves behind ION API Gateway with a service account and the .ionapi file goes into the vault. A SessionOnLoginFailed handler emails the owner after repeated failures.

Version differences and gotchas

Request features differ between Mongoose builds. The IDO request exclusion list and the IdoPostRequestQuarantined event appear in current Mongoose documentation; confirm they exist in your SyteLine 9 or CSI 10 build before relying on them. REST v1 and v2 endpoints take different URL shapes. How API sessions consume licences depends on your agreement, so confirm it with Infor rather than assuming.

Frequently Asked Questions

Does Infor Mongoose have a REST API?

Yes. The IDO request service exposes REST endpoints for loading collections, updating collections and invoking IDO methods, alongside the older SOAP web service. Calls run as a SyteLine user, so group authorizations apply. Load requests take parameters such as properties, filter, recordcap and readonly. Check which REST version your build supports.

How should an integration log in to SyteLine?

Use a dedicated SyteLine user per integration, in a group that grants only the IDOs and methods it needs. Obtain a security token at startup and keep it in memory. For callers outside your network, put ION API Gateway in front and authenticate with OAuth2 using a backend service account and a vault-stored .ionapi file.

What does recordcap do in an IDO load request?

recordcap limits how many rows a load returns. A value of 0 means no limit, which on large IDOs can load very large result sets and slow the application server. Set it to the largest batch the integration really needs and page through data with filters, rather than pulling whole tables.

Can I alert on failed SyteLine logins?

Yes. SessionOnLoginFailed is a framework event raised when a login attempt fails. Add an application event handler with a Notify action to alert the integration owner or security team, and keep the condition narrow, for example integration users only, so alerts stay meaningful.

If you want an AI assistant to use SyteLine data through a locked-down, read-only IDO user on your own servers, we can set that up with these controls built in.

Get Infor SyteLine alerts

Support and maintenance deadlines, release changes that affect Infor SyteLine sites, and new free Infor SyteLine tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor SyteLine: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

Integrations

Software