Epicor partners in Texas: choosing an implementer for a Texas manufacturer or distributor

Epicor is headquartered in Austin, so Texas companies can usually reach Epicor's own services team easily, alongside independent consultants based in Houston, Dallas-Fort Worth and San Antonio. The choice comes down to who understands your industry, often energy equipment, aerospace and defense supply chain, fabrication or distribution, and who will be on site when you need them.

When this makes sense

  • A Houston-area oilfield equipment or valve manufacturer moving to Epicor Kinetic from an older system
  • A Dallas-Fort Worth aerospace supplier that needs lot and serial traceability and first article records
  • A fabrication shop in the Texas triangle that quotes custom work and needs job costing to be trusted
  • A distributor with several Texas branches that needs inventory and sales tax handled per location

What the engagement covers

Industry process design

Configure Epicor for how the plant actually works: engineer-to-order quoting and jobs for energy equipment, lot and serial tracking with certifications for aerospace parts, or outside processing for coating, heat treat and NDT.

Texas sales and use tax

Set up tax jurisdictions, local rates and exemption certificates, including how the manufacturing exemption is applied to qualifying purchases, and decide whether to use a tax engine. Sourcing rules should be confirmed with your tax advisor.

Traceability and quality

Lot and serial tracking, inspection plans, nonconformance and corrective action in Epicor quality functions, with material certificates attached to receipts.

Multi-branch inventory

Warehouses and bins per site, transfer orders between branches and replenishment settings so stock sits where it sells.

Data migration

Parts, BOMs, routings, open orders and balances loaded with DMT, reconciled by the business before cutover.

Integrations

Common Texas needs include EDI with large energy or aerospace customers, CAD or PLM links for engineering, and Power BI reporting.

How it runs

  1. 1

    Selection and planning (3-6 weeks)

    • Compare Epicor services and independent options
    • Check references in your industry
    • Agree team, schedule and on-site plan
  2. 2

    Design and build (8-14 weeks)

    • Process workshops on site
    • Configure traceability, quality and tax
    • Build interfaces and key reports
  3. 3

    Testing and cutover (6-10 weeks)

    • Conference room pilots with real jobs
    • End user training at each site
    • Cutover rehearsal and go-live

What you get

  • Solution design covering industry-specific flows
  • Sales tax configuration and exemption process
  • Traceability and quality setup documentation
  • Data migration plan and reconciliations
  • Trained users and go-live support log

What drives cost and effort

Engineer-to-order complexityCustom quoting, configurators and engineering change control add design time.
Traceability depthFull lot and serial genealogy with certifications adds setup and testing.
Number of sitesEach branch or plant needs setup, training and cutover support.
Customer EDI requirementsEach trading partner adds mapping and testing.
On-site presenceLocal consultants reduce travel cost; out-of-state teams add it.

Vendor-led implementation

Companies wanting direct access to Epicor product experts and a single contract with the software vendor.

Independent partner implementation

Companies preferring a smaller team with continuity of named consultants and local presence.

Hybrid

Vendor for core rollout, independents for industry-specific add-ons, reporting or post go-live support.

Questions to ask any Epicor consultant

Which customers in our industry in Texas have you implemented?

Energy, aerospace and fabrication have different traceability and costing needs.

How will you handle Texas sales tax and our exemptions?

Tax errors on purchases and sales cause audit exposure.

How much on-site time is included?

Shop floor training and go-live are better done in person.

Who supports us after go-live and how fast?

Production stoppages need a fast response.

Can we speak to the actual project lead before signing?

Team quality matters more than the firm's name.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Traceability designed too late for aerospace or energy customers

Agree lot and serial rules in the first design phase.

Sales tax set up from a generic template

Review jurisdictions and exemptions with your tax advisor before go-live.

Go-live during peak demand

Plan cutover around production peaks and quarter ends.

Key users unavailable because they run production

Backfill key users during design and testing.

Being in Texas is a convenience, not a qualification. A remote team with deep experience in your industry may serve you better than a local one without it, and a small business with simple needs may do fine with Epicor's standard onboarding.

Frequently asked questions

Is Epicor based in Texas?

Yes, Epicor's headquarters are in Austin. That makes in-person meetings with Epicor's own teams easier for Texas companies.

Does Epicor handle Texas sales tax?

Epicor can calculate sales tax from configured jurisdictions or through a tax engine integration. Rates, sourcing and exemptions should be reviewed with a tax advisor.

Is Epicor good for oil and gas manufacturing?

Many energy equipment manufacturers run Epicor for engineer-to-order and job work. Test traceability, outside processing and project costing with your own scenarios.

How long does an Epicor implementation take?

Four to nine months is a typical range for a mid-sized manufacturer, longer with several sites or heavy EDI.

Can Netray work with Texas companies?

Yes, remotely and on site when needed, often alongside an existing partner. Netray adds AI help on data migration checks and testing, and private AI reporting over Epicor.

Talk to a Epicor consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get Epicor ERP alerts

Support and maintenance deadlines, release changes that affect Epicor ERP sites, and new free Epicor ERP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.