Choosing an Epicor Kinetic implementation partner for aerospace and automotive manufacturers

Aerospace and automotive Kinetic projects succeed or fail on traceability, quality and customer-driven demand, not on general ledger setup. Choose a partner who can configure lot and serial tracking, revision control, inspection and nonconformance flows, and for automotive, Demand Management with EDI schedules, and who understands how hosting choices affect your ITAR and CMMC obligations.

When this makes sense

  • AS9100 machine shops and assemblers moving from an older Epicor release, Vantage or a different ERP to Kinetic.
  • Defense subcontractors handling controlled unclassified information who must decide between Epicor cloud and on-prem.
  • Tier 2 and tier 3 automotive suppliers receiving EDI planning and shipping schedules from OEMs or tier 1s.
  • Manufacturers serving both aerospace and automotive customers with different quality and labeling rules.
  • Companies failing customer audits on first article, traceability or engineering change records.

What the engagement covers

Lot and serial traceability

Lot tracking on raw material and purchased parts, serial tracking on assemblies, heat and certificate capture at receipt, and forward and backward trace from a serial to material lots, suppliers and operations.

Revision and engineering change control

Engineering Workbench with ECO groups, approved revisions and effectivity, customer revision and drawing references, and rules that stop jobs releasing on unapproved revisions.

Quality management

Inspection processing for receipt, in-process and final, inspection plans, DMR and NCR handling, corrective actions, supplier quality, and first article inspection evidence linked to jobs.

Job costing and contracts

Job Management with costing method choices, Project Management for program or contract work, and cost collection that supports customer and contract reporting.

Automotive demand and shipping

Demand Management for EDI 830 and 862 schedules, demand contracts, cumulative quantity tracking, ASN 856 outbound, and customer-specific label formats.

Hosting and access control for regulated data

Decide where Kinetic and related document stores run, restrict technical data by security group, and document the controls for your own ITAR and CMMC programs.

Document management

Attach certs, drawings, FAI reports and inspection records to parts, jobs and lots so audit evidence lives with the transaction.

How it runs

  1. 1

    Regulatory and process discovery (3-6 weeks)

    • Map customer flow-downs and quality requirements
    • Decide hosting and data boundaries for CUI and technical data
    • Define traceability depth by product line
  2. 2

    Solution design and pilots (6-10 weeks)

    • Configure lot, serial and revision rules
    • Pilot quality flows from receipt inspection to NCR
    • Pilot EDI demand to shipment for an automotive customer
  3. 3

    Build and data migration (6-12 weeks)

    • Load parts, revisions, methods and open jobs with DMT
    • Build travelers, certs of conformance and labels
    • Build trace and audit BAQs
  4. 4

    Testing and audit rehearsal (4-6 weeks)

    • Run a mock customer audit trace from a shipped serial
    • End-to-end EDI tests with trading partners
    • User acceptance tests by quality and production
  5. 5

    Cutover and hypercare (3-6 weeks)

    • Cut over open jobs and inventory with lot balances
    • Daily quality and shipping issue review
    • Hand over audit evidence procedures

What you get

  • Traceability design by product line covering lots, serials, heats and certificates
  • Engineering change control procedure aligned to Kinetic ECO groups and revision approval
  • Configured quality flows with inspection plans, NCR and corrective action process
  • Demand Management and EDI design for automotive customers, with partner test sign-offs
  • Hosting and access control decision record supporting your ITAR and CMMC documentation
  • Trace and audit dashboards plus a mock audit report
  • Data migration reconciliation for parts, revisions, open jobs and lot balances

What drives cost and effort

Traceability depthSerial tracking on assemblies with full as-built records is much more effort than lot tracking on raw material alone.
Quality process scopeMoving inspection, NCR and corrective action into Kinetic from a separate quality system adds design, migration and training.
Automotive EDI partnersEach OEM or tier 1 with its own schedule, ASN and label rules adds mapping and certification testing.
Hosting decisionOn-prem or a dedicated hosting arrangement for controlled data adds infrastructure and security work compared with a standard cloud tenant.
Legacy dataMigrating revision history, open job detail and lot balances with certs takes far longer than migrating only current masters.
Customer-specific documentsCustom travelers, certs of conformance and labels per customer add report development.

Phased fixed-scope implementation

Shops with a defined module list and audit or contract dates that require a firm plan.

Time and materials with a cap

Companies where quality and EDI scope will be discovered during pilots.

Implementation plus regulated support retainer

Defense and aerospace shops that want the same team for audits, upgrades and access reviews after go-live.

Questions to ask any Epicor Kinetic consultant

Walk us through a trace from a shipped serial number back to material lots in your pilot.

Traceability is the core requirement; seeing it in Kinetic early proves the design.

How will you keep controlled technical data and CUI within our boundary?

Hosting, support access and document storage choices affect your ITAR and CMMC compliance, and the partner's own staff access must fit your rules.

Have you configured Demand Management with cumulative tracking for automotive schedules?

CUM mismatches with customers cause shipping disputes; it needs someone who has done it.

How do your consultants handle export-controlled data during the project?

Remote access by foreign persons to ITAR technical data can be an export; ask how staffing and access are controlled.

Which quality functions do you recommend we keep in a separate QMS, if any?

A neutral partner will say where Kinetic quality is enough and where a dedicated QMS fits better.

What will our first customer audit after go-live look like?

The answer shows whether audit evidence was designed in or left for later.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Traceability gaps discovered during a customer audit

Rehearse a full trace and a mock audit before go-live and fix gaps in lot capture at receipt and issue.

Controlled data stored or accessed outside your boundary

Decide hosting and support access rules in discovery and include them in the contract and access logs.

EDI schedule errors cause missed shipments

Test each trading partner end to end with real schedules and reconcile cumulative quantities before go-live.

Engineering releases jobs on unapproved revisions

Enforce approved-revision rules and audit ECO group approvals as part of acceptance testing.

Floor resists lot and serial transactions

Use barcode scanning and simple data collection screens and train on why each scan matters.

If you already run Kinetic and only need better traceability or EDI, a focused project with your current partner or a specialist may be enough. Kinetic is not the only option for these industries: very complex programs or heavy quality needs may justify a dedicated QMS or a different ERP, and a neutral advisor should say so.

Frequently asked questions

Is Epicor Kinetic used in aerospace and defense?

Yes, many aerospace machine shops and assemblers run Epicor because of job costing, lot and serial tracking and quality features. Compliance with AS9100, ITAR or CMMC depends on how you configure, host and operate it, not on the software alone.

Can Epicor Kinetic cloud hold ITAR or CUI data?

That depends on the specific hosting offer and your contract requirements. Confirm with Epicor what each hosting option supports, and consider on-prem or a dedicated environment if you cannot verify it meets your obligations.

Does Kinetic handle automotive EDI schedules?

Kinetic Demand Management processes customer demand such as planning and shipping schedules and supports cumulative tracking. An EDI translator or service usually converts X12 or EDIFACT documents into Kinetic demand.

How long does an aerospace Kinetic implementation take?

Single-site shops commonly plan six to twelve months. Serial traceability, a quality system migration or multiple sites push it longer.

Where can AI help aerospace and automotive manufacturers on Epicor?

Private AI running on your own infrastructure can answer traceability and quality questions over Kinetic data, draft NCR summaries and read supplier certs, while keeping controlled data inside your boundary.

Talk to a Epicor Kinetic consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get Epicor ERP alerts

Support and maintenance deadlines, release changes that affect Epicor ERP sites, and new free Epicor ERP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.