Upgrading SAP BW to 7.4 or 7.5 without moving to HANA

You can upgrade SAP BW to 7.4 or 7.5 on a non-HANA database (Oracle, SQL Server, Db2, SAP ASE or MaxDB) as long as the database and OS are supported in the Product Availability Matrix. The upgrade runs with SUM, and the main work is in post-upgrade checks, migrating old 3.x data flows and retesting process chains and queries. BW 7.5 is the last BW release for non-HANA databases, so it is a holding position before BW/4HANA, Datasphere or another warehouse.

When this makes sense

  • You run BW 7.0x or 7.3x on anyDB and your release or database is falling out of support
  • HANA is not affordable or approved yet, but you need a supported BW release
  • Your ECC to S/4HANA conversion requires source system compatibility and a newer BW
  • You still use 3.x data flows and BEx 3.x content and need to modernize before a later move
  • Security or audit requires current Support Packages on BW

What the engagement covers

Prerequisites

Check database and OS support in the PAM, Unicode status (BW 7.5 is Unicode only), add-ons, kernel release, and BusinessObjects or BEx front-end compatibility.

SUM upgrade

Build the stack in Maintenance Planner, run SUM in a sandbox on a production copy, and measure downtime per phase.

Post-upgrade BW tasks

Run BW post-upgrade checks and consistency programs, reactivate objects where needed, check process chains and transformations, and verify source system connections.

3.x data flow migration

Migrate 3.x InfoSources, update rules and transfer rules to transformations and DTPs with the migration tool (RSMIGRATE), so flows are ready for later BW/4HANA conversion.

Query and front-end checks

Retest BEx queries, Analysis for Office workbooks and BusinessObjects reports, and plan replacement of BEx 3.x web templates.

Extraction from ECC or S/4HANA

Move extraction to ODP where possible and verify delta queues and initializations after the upgrade.

Future path

Document what still blocks BW/4HANA or Datasphere (legacy objects, ABAP routines, BEx dependencies) for the next roadmap step.

How it runs

  1. 1

    Assessment (2-3 weeks)

    • Check PAM and Unicode status
    • Inventory 3.x flows and BEx content
    • Build Maintenance Planner stack
    • Plan sandbox run
  2. 2

    Sandbox and DEV (3-6 weeks)

    • Upgrade sandbox on production copy
    • Run post-upgrade checks
    • Migrate 3.x flows in DEV
    • Fix broken routines and chains
  3. 3

    QAS testing (3-5 weeks)

    • Upgrade QAS and import fixes
    • Run loads and reconcile data
    • Test queries and reports
    • User acceptance
  4. 4

    Production (1-2 weeks)

    • Pause loads and empty delta queues
    • Run production upgrade
    • Restart chains and verify deltas
    • Hypercare

What you get

  • Prerequisite and PAM check
  • Sandbox runbook with phase timings
  • 3.x migration log
  • Post-upgrade check results and fixes
  • Report and query test evidence
  • Roadmap note on remaining blockers for BW/4HANA

What drives cost and effort

Starting release and UnicodeOld releases and non-Unicode systems need extra steps and downtime testing.
Number of 3.x flowsEach 3.x flow migrated needs testing; large legacy estates take weeks.
Custom ABAP routinesRoutines with obsolete code or direct table access need fixing after the upgrade.
Front-end estateMany BEx 3.x web templates or old workbooks add testing or replacement.
Source system changesMoving extraction to ODP or adapting to an S/4HANA source adds work.

Fixed-scope technical upgrade

Unicode BW systems with few legacy flows and a clear test pack.

Upgrade plus legacy cleanup

Systems with many 3.x flows that should be modernized in the same project.

Time and materials with a cap

Older, poorly documented BW systems where the sandbox reveals the real scope.

Questions to ask any SAP S/4HANA consultant

Is our database and OS supported at the target BW release, and for how long?

Upgrading BW onto a platform that loses support soon wastes effort.

How will you handle 3.x flows: migrate now or later?

Migrating during the upgrade adds work now but removes a blocker for BW/4HANA later.

What post-upgrade BW checks do you run, and how do you verify data?

BW upgrades can leave inactive objects and broken deltas. Ask for their checklist and reconciliation.

How do you protect delta queues during the production upgrade?

Lost or duplicated deltas are the most painful BW upgrade problem.

What is your view of our path after BW 7.5?

BW 7.5 on anyDB is a holding position; the advisor should be clear about next steps.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Delta data lost during the upgrade window

Empty delta queues and stop source postings or plan delta repair steps before downtime.

Inactive objects after upgrade

Run BW post-upgrade checks and reactivation in sandbox and DEV, and repeat in each system.

3.x migration changes results

Compare loaded data before and after migration for each flow.

Front-end incompatibility

Check BusinessObjects and Analysis for Office versions against the PAM before upgrading.

If your BW is on 7.4 or 7.5 already and only needs Support Packages, an internal Basis team can usually run that with SUM. If you plan to move to BW/4HANA or Datasphere within a year or two, consider whether to invest in the anyDB upgrade or go straight to the new platform with a migration. BW 7.5 on anyDB follows the SAP NetWeaver 7.5 maintenance timeline, so check end dates before deciding.

Frequently asked questions

Can SAP BW 7.4 or 7.5 run without HANA?

Yes. BW 7.4 and 7.5 support several non-HANA databases if the database and OS versions are supported in the PAM. Some features, such as HANA-optimized objects and push-down, are available only on HANA.

Is BW 7.5 the last release on anyDB?

Yes, BW 7.5 is the last BW release that supports non-HANA databases. BW/4HANA runs only on SAP HANA.

What is RSMIGRATE?

RSMIGRATE is the BW tool for migrating 3.x data flows (InfoSources, update rules and transfer rules) to the newer transformation and DTP concept. Migrating these flows is a prerequisite for moving to BW/4HANA.

How long does a BW upgrade take?

A contained upgrade with few legacy flows often takes two to four months including testing. Old releases, Unicode conversion or many 3.x flows extend that.

Can AI help with BW upgrades?

AI can scan routines for obsolete code, document process chains and compare data before and after upgrades. Netray uses AI agents for those checks, with BW and Basis experts approving fixes.

Talk to a SAP S/4HANA consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get SAP S/4HANA alerts

Support and maintenance deadlines, release changes that affect SAP S/4HANA sites, and new free SAP S/4HANA tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.