APQP Team Feasibility Commitment Template
In APQP, the team feasibility commitment records whether the supplier can make the product as specified, at the stated volume, in time. It is a statement signed by a cross-functional team, not a single person. This template gives a structure for the considerations and a conclusion you can export.
Fill in
APQP Team Feasibility Commitment Template
Team Feasibility Commitment
Supplier: Acme Precision Components Ltd Customer: Example Automotive Tier 1 Part: HSG-48213 Pump housing Annual volume: 240,000 pieces per year Planned SOP: 2027-03-01 Date: 2026-10-20
Feasibility considerations
| Consideration | Yes / no | Comment |
|---|---|---|
| Product can be manufactured to tolerances on the drawing | ||
| Product can be manufactured without special packaging or handling | ||
| Capacity exists for the stated volume | ||
| Gaging and test equipment is available or can be bought in time | ||
| Capability expected to meet customer requirement on special characteristics | ||
| Tooling and fixtures can be delivered in time | ||
| Skills and training are in place | ||
| Sub-suppliers can meet quality and delivery |
Conclusion
Team conclusion: Feasible with changes
Concerns and required changes
1. Bore tolerance 0.021 mm needs air gaging and a finish pass. 2. Cleanliness spec of 2.0 mg needs a validated wash process. 3. Tooling lead time of 14 weeks leaves no float to SOP.
Team sign-off
A structure for the APQP feasibility step, not a customer-mandated form. If the team has concerns, record the changes needed and resolve them with the customer before committing.
Want a capacity check against your ERP routings?
Optional review of how routing and work centre data can support feasibility analysis.
Optional. The tool and every export work without this. No spam.
How to use it
Meet with engineering, quality, manufacturing, purchasing and program management after receiving the drawing and quote package. Go through the consideration table, answer yes or no with a comment, and write down concerns. If the answer to any item is no, choose the 'feasible with changes' or 'not feasible' conclusion and list the changes. Send the document with your quote or as part of program kickoff.
- Include all functions in the review
- Write concerns as specific, fixable items
- Check tooling lead time against SOP
- Confirm gage availability and capability
Why it matters
The feasibility step is where a supplier can still raise a tolerance, a cleanliness limit or a timeline issue cheaply. After tooling is cut and SOP is fixed, the same issue becomes a late change or a quality escape. IATF 16949 expects organisations to analyse manufacturing feasibility of proposed products, and this record shows the analysis took place and who agreed.
Reading the example
The example concludes feasible with changes and lists three real constraints: a tight bore tolerance that needs a finish pass and air gaging, a cleanliness limit that needs a validated wash process, and a tooling lead time with no schedule float. Each concern points to an action in the timing plan. Replace the sample text with your own.
Common mistakes
Teams often sign off without engineering or quality in the room, treat the form as a formality, or leave concerns vague. Another mistake is not tracking concerns to closure. Move each concern into the APQP action list with an owner and date, and review them at gate meetings.
Frequently Asked Questions
Who signs the feasibility commitment?
Members of the cross-functional team: typically engineering, quality, manufacturing, purchasing and program management, with general management accountable. Signatures show the team agreed with the conclusion.
What if the part is not feasible as specified?
State that clearly, list the changes needed such as tolerance, material or process, and discuss with the customer before committing. Signing a feasible statement you do not believe leads to problems later in PPAP.
When in APQP is this done?
It is part of the planning phase, after the customer inputs are reviewed and before final commitment. It also supports the quote and the timing plan.
Can I export the document?
Yes. Export to PDF or Word, add attachments such as capacity analysis, and collect signatures.
If feasibility depends on capacity and routing data in your ERP, Netray can help summarise the load by work centre read-only, on your own infrastructure.
Related Tools
Special Characteristics Matrix Worksheet
Trace each special characteristic from drawing to PFMEA, control plan, gage and capability study in one editable table.
Quality & InspectionPPAP Process Flow Diagram Template
Fill in a header and an operation table that documents the production flow from receiving to shipping, ready to export.
Quality & InspectionSupplier PPAP Request Letter Template
Generate a clear letter asking a sub-supplier for a PPAP submission with level, due date, required elements and contact details.
Quality & InspectionPFMEA Worksheet with RPN for PPAP
Editable process FMEA table with severity, occurrence, detection and automatic RPN, ready to export to Excel for a PPAP package.
More Quality & Inspection tools
See all- PPAP Submission Level Requirements Reference
- PPAP Part Submission Warrant Template
- APQP Timing Plan Worksheet
- IATF 16949 Internal Audit Checklist
- Run at Rate Calculator
- PPAP Dimensional Results Worksheet
- Customer Specific Requirements Matrix Worksheet
- APQP Phase Gate Checklist
- Production Control Plan Worksheet for PPAP
Keep exploring
Free tools
- APQP Plan TemplateFill in your program details and get a clean APQP plan document with phases, deliverables, owners, gate reviews and a risk register.
- APQP Checklist WorksheetAn editable APQP checklist by phase with owner, evidence and status columns. Track deliverables across the five phases and export to Excel.
- APQP Template Excel Plan and ChecklistAn editable APQP plan and checklist with a filled example plan. Track deliverables by phase, owner, due date and percent complete, then export to Excel.
Guides
- Infor LN Budget Management Setup and Forecasting ConfigurationSet up budgeting and forecasting in Infor LN with budget structures, version control, budget checking rules, and integration with financial planning tools.
- ERP for Automotive Tier 1 and Tier 2 SuppliersERP for automotive Tier 1 and Tier 2 suppliers: IATF 16949, EDI 830 and 862 releases, PPAP, APQP and traceability requirements with implementation guidance.
- Fractional AI Team vs. Hiring Full-Time: A Cost ComparisonFractional AI team versus hiring full-time engineers: the fully loaded cost of each path, when hiring wins, when fractional wins, and the hybrid model in between.