Aerospace & DefenseFree templatePDF, Excel, Word exportAerospace

AS9100 FAI Template (AS9102 Forms 1, 2 and 3 in One Report, with ERP Data Mapping)

This AS9100 FAI template puts AS9102 Forms 1, 2 and 3 in one editable report, with a filled example for a machined bracket and a table that shows which fields can be pulled automatically from your ERP. Change the defaults, export to Word or PDF, and attach your ballooned drawing.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

AS9100 FAI Template (AS9102 Forms 1, 2 and 3) with ERP Data Mapping

Form 1. Part Number Accountability

FAI report number: FAI-2026-0187 Part number: BRK-48213-01 Part name: Mounting bracket, machined Serial or lot number: LOT-260915-A Drawing revision: C Organization: Acme Precision Aerospace Ltd CAGE: 1ABC2 Purchase order: PO-100245 FAI type: Full FAI Reason: New part Date: 2026-10-20

Form 1. Assemblies and details

Part numberPart nameRevisionFAI report no.Supplier / CAGE
BRK-48213-01Mounting bracket, machinedCFAI-2026-01871ABC2

Form 2. Product Accountability: Materials, Special Processes, Functional Testing

TypeName / specificationProcess or material supplierCertificate no.Result
Raw materialAluminum 7075-T651 plate, AMS 4045Mill: ____Cert: ____Accept
Special processAnodize Type II, MIL-A-8625Processor: ____ (customer-approved)Cert: ____Accept
Functional testTest per drawing note: ____Lab: ____Report: ____Accept

Form 3. Characteristic Accountability, Verification and Compatibility Evaluation

Char no.Drawing zoneRequirementResultsDesigned / special characteristicTool or gaugeAccept / reject
1B3Overall length 80.00 +/- 0.10 mm80.04CMM, ID ____Accept
2C4Bore diameter 12.000 +0.018 / 0 mm12.009KeyBore gauge, ID ____Accept
3C2Surface roughness Ra 1.6 um max1.2Profilometer, ID ____Accept
4Note 5Anodize per specification, color clearConformsVisual, cert reviewAccept
5Note 2Break all sharp edges 0.2 mm maxConformsVisual 10xAccept

ERP data mapping (where each field comes from)

FAI fieldTypical ERP sourceExample
Part number and revisionItem master and engineering change statusBRK-48213-01 rev C
Serial or lotLot or serial record, work orderLOT-260915-A
Purchase orderPurchase order header (for supplier FAI) or sales orderPO-100245
Material and certificateReceiving record, lot traceability, attached certAluminum 7075-T651 plate, AMS 4045
Special process supplierApproved supplier list, operation on the routingAnodize Type II, MIL-A-8625
Drawing zone and requirementsNot in ERP. Comes from the ballooned drawing in PLM or document control

Approvals

FAI performed by / Date
Quality approval / Date
Customer representative (if required) / Date

This reproduces the structure of the AS9102 forms and common fields, not the official form. Check that your customer accepts a custom layout. Every drawing characteristic needs a balloon and a row in Form 3. A partial FAI must still cover all impacted characteristics, and the reason must match AS9102 triggers such as a design change, a manufacturing process change, a change in location, or a production lapse.

Pull FAI header data from your ERP

Optional: scope an on-prem AI layer that fills Forms 1 and 2 from your ERP records.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to fill the three FAI forms

Form 1 proves you know which part you built: the part number, drawing revision, serial or lot, and the FAI type. Form 2 proves the material, special processes and functional tests are right, with certificates and approved suppliers. Form 3 is the heart of the report: every characteristic on the ballooned drawing listed with its requirement, measured result, gauge and accept or reject. Fill the form fields here, replace the example rows with your own characteristics, and attach certificates and measurement data. Sign off only when every row is dispositioned.

  • Balloon every dimension, note and specification on the drawing
  • Measure characteristics on the actual FAI sample, not on a similar part
  • Record the actual value, not just pass or fail
  • Document nonconformances before approval, never after

When AS9102 requires an FAI

AS9100 clause 8.5.1.3 (production process verification) requires a first article inspection for a new part, and again after changes that invalidate the previous result. AS9102 lists the triggers: a change in design affecting form, fit or function; a change in the manufacturing source, process, location, tooling or the method of manufacture; a lapse in production; or a change in numerical control program. A delta or partial FAI covers just the impacted characteristics, while a full FAI covers everything. Your customer may add flow-down requirements, so read the purchase order.

Mapping FAI data from your ERP

Much of Form 1 and Form 2 already exists in your ERP: part number and revision, lot or serial, purchase order, raw material receiving record with certificate, and the special process step on the routing. The drawing characteristics and measurement results usually do not. They live in the ballooned drawing, a CMM program or a spreadsheet. The mapping table in this template shows the source for each field so you can automate the header data and avoid transcription errors. Keep the item master revision aligned to the drawing revision, or the FAI will cite the wrong revision.

Common mistakes

The most frequent rejections are a missing balloon, a Form 3 row without an actual result, an FAI on a drawing revision that is not current, special process certificates from a supplier that is not on the customer's approved list, and a signed FAI with open nonconformances. Also check that raw material test reports match the specification revision called out, and that inspection equipment calibration was current on the measurement date.

Frequently Asked Questions

What is the difference between AS9100 FAI and AS9102?

AS9100 is the quality management standard that requires first article inspection under clause 8.5.1.3. AS9102 is the aerospace standard that defines how to do it and what the report forms must contain.

Do I have to use the official AS9102 forms?

Not always. AS9102 requires the content of Forms 1, 2 and 3 but allows other formats if the information is complete and the customer agrees. Many suppliers use electronic or ERP-generated layouts.

How many characteristics need to be on Form 3?

All of them: every dimension, tolerance, note and specification on the drawing, including those that flow down from referenced specifications. Each gets a balloon number and a row. Assemblies also need characteristics of the assembly itself.

Can I do a partial FAI instead of a full FAI?

Yes, when a change affects only some characteristics, provided you assess the impact and cover every affected one. If the change is wide or you are unsure, a full FAI is safer. Record the rationale in the report.

If you want FAI header data pulled from SyteLine, SAP or another ERP without sending drawings or data to a public cloud, Netray can build a private AI layer on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs

Software