Country & TaxFree referencePDF, Excel, Word exportBrazil

Brazil NF-e Field Reference (Model 55)

Brazil's NF-e is an XML invoice authorized by the state tax authority before goods can move. Localization projects live or die on field mapping, so this table lists the main tags, what they mean and what the ERP has to supply.

Download:
XML tagGroupMeaningValues and ERP note
ide/cUF
Identification
IBGE code of the issuer state
Two digits; first part of the access key
ide/natOp
Identification
Nature of the operation
Free text such as sale or return; ERP usually maps from the operation type
ide/mod
Identification
Fiscal document model
55 for NF-e, 65 for NFC-e
ide/serie
Identification
Document series
Part of the numbering sequence; one sequence per series and issuer
ide/nNF
Identification
Invoice number
Sequential per series; gaps must be handled by number inutilization
ide/dhEmi
Identification
Issue date and time with UTC offset
Must be within the allowed window of the authorization time
ide/tpNF
Identification
Operation type
0 inbound (entrada), 1 outbound (saida)
ide/idDest
Identification
Destination of the operation
1 internal, 2 interstate, 3 foreign; drives CFOP first digit
ide/tpEmis
Identification
Issuance type
1 normal; other values are contingency modes
ide/finNFe
Identification
Invoice purpose
1 normal, 2 complementary, 3 adjustment, 4 return
ide/indFinal
Identification
Final consumer indicator
0 normal, 1 final consumer; affects tax treatment
ide/indPres
Identification
Buyer presence indicator
Required; 0 not applicable, 1 in person, 2 internet, and others
ide/chNFe (infNFe Id)
Identification
Access key (chave de acesso)
44 digits: state, year-month, issuer CNPJ, model, series, number, issuance type, numeric code, check digit
emit/CNPJ
Issuer
Issuer tax ID
14 digits; CPF used instead for individuals
emit/IE
Issuer
State registration
Issuer's state tax registration number
emit/CRT
Issuer
Tax regime code
1 Simples Nacional, 2 Simples excess of sublimit, 3 normal regime
dest/CNPJ or CPF
Recipient
Recipient tax ID
CNPJ for companies, CPF for individuals, ID for foreigners
dest/indIEDest
Recipient
State registration indicator of the recipient
1 taxpayer, 2 exempt, 9 non-taxpayer; changes ICMS rules
dest/enderDest
Recipient
Recipient address
City uses the IBGE municipality code
det/@nItem
Item
Item sequence
1 to 990 lines per invoice
det/prod/cProd
Item
Product code
Issuer's internal code
det/prod/xProd
Item
Product description
Text description on the invoice
det/prod/NCM
Item
Mercosur common nomenclature
8 digits; drives IPI and other tax rules
det/prod/CFOP
Item
Fiscal operation code
4 digits; first digit 5 internal, 6 interstate, 7 foreign sales
det/prod/uCom
Item
Commercial unit
Unit string such as UN, KG
det/prod/qCom
Item
Commercial quantity
Up to 4 decimals
det/prod/vUnCom
Item
Commercial unit value
Up to 10 decimals
det/prod/vProd
Item
Gross item value
Quantity times unit value, rounded as specified
det/imposto/ICMS
Taxes
State value-added tax group
CST or CSOSN code selects the sub-group; depends on CRT
det/imposto/IPI
Taxes
Federal excise on industrial products
Applies mainly to manufacturers and importers
det/imposto/PIS
Taxes
Federal social contribution
CST selects the calculation form
det/imposto/COFINS
Taxes
Federal social contribution
Mirrors PIS structure with its own CST
total/ICMSTot/vBC
Totals
ICMS tax base total
Must equal sum of item bases
total/ICMSTot/vNF
Totals
Total invoice value
Validated against the sum of items, freight, insurance, other and taxes
transp/modFrete
Transport
Freight mode
0 sender pays, 1 recipient pays, 2 third party, 9 no freight
cobr/dup
Billing
Installments
Due dates and values for the receivable
pag/detPag/tPag
Payment
Payment means
Coded payment method; required in the current layout
infAdic/infCpl
Additional information
Complementary information
Free text used for legal references and notes
protNFe/infProt/nProt
Authorization
Authorization protocol number
Returned by the tax authority (SEFAZ) when the invoice is authorized

Layout versions change through technical notes (notas tecnicas) published by the tax authority. This is a working reference for localization and integration, not the official schema. Confirm against the current layout manual before coding.

ERP field mapping help

Optional: we can review your NF-e field mapping or reconciliation approach.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Use the search box to find a tag or a concept, for example CFOP, CRT or access key. Each row gives the group in the XML, the meaning, and a note on the values or the ERP implication. Export the table to Excel or CSV to build a field mapping sheet between your ERP document model and the NF-e layout. Add columns for your source table and field, owner, and test result.

The access key and numbering

The 44 digit chave de acesso encodes the state, year and month of issue, the issuer CNPJ, the model, series, number, issuance type, a numeric code and a check digit. It is the unique identifier used for lookups, cancellations and events. Because numbers must be sequential per series, any number skipped through a failed or abandoned document has to be formally inutilized, which is a process step to build into the ERP.

Taxes make the project hard

A Brazilian invoice carries several tax groups per line: ICMS, IPI, PIS and COFINS, with ICMS-ST and other state specifics layered on top. The rules depend on the item NCM, the CFOP, the origin and destination states, and the issuer's regime (CRT). Most ERPs use a tax determination engine or a localization add-on for this; the NF-e layout is only the container for its result.

  • CFOP and NCM must be on the item master or determined
  • CST or CSOSN depends on the issuer regime
  • Interstate rates and ICMS-ST depend on the state pair
  • Totals must reconcile to the cent with the item values

Common mistakes

Teams copy a sample XML and parameterize it, then find that edge cases such as returns, complementary invoices, exports and transfers use different CFOP and purpose codes. Plan scenarios up front and test each one in the authority's homologation environment. Also plan the events: cancellation, correction letters and manifestation of the recipient are separate messages with their own rules and time windows.

Frequently Asked Questions

What does NF-e model 55 mean?

Model 55 is the electronic invoice used for business to business sales and most goods movements. Model 65 (NFC-e) is the consumer retail version. The model number is a field in the identification group and part of the access key.

How long is the NF-e access key?

It has 44 digits. They encode the state, year and month, issuer CNPJ, model, series, number, issuance type, a numeric code and a check digit, so it can be validated without contacting the authority.

Is this the official layout?

No. It is a practical summary of main fields. The official manual and the technical notes from the tax authority define the exact schema, field lengths and validation rules, and they change over time.

Do I need a local partner?

Most global ERPs need either native localization or a certified Brazilian add-on for tax determination, SPED reporting and NF-e transmission. The decision depends on your ERP and volume; check your vendor's localization support first.

If you are integrating a global ERP with Brazilian NF-e through a local partner, we can help map fields and reconcile authorized invoices back to ERP documents.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring