Device History Record (DHR) Template for Medical Device Batches
A device history record proves that a specific lot or serial number was built and released according to its device master record. This template gives you a clean structure you can fill in and export, then attach to the lot paperwork.
Fill in
Device History Record (DHR) Template
Device History Record
Manufacturer: Meridian Orthopedics Inc. Device: Cannulated bone screw 4.0 mm x 36 mm, model CS-4036 Lot / serial: L2610-0417 Work order: WO-118204 Device master record: DMR-CS-4036 Rev F
Quantities and dates
Quantity manufactured: 500 Quantity released for distribution: 492 Production start: 2026-10-05 Production end: 2026-10-12
Manufacturing steps
| Step | Operation / instruction ref | Date | Operator | Result |
|---|---|---|---|---|
| 10 | Material receipt and verification | |||
| 20 | Machining / forming | |||
| 30 | Cleaning and passivation | |||
| 40 | Final inspection | |||
| 50 | Packaging and sterilization |
Acceptance records
Incoming material cert verified (Ti-6Al-4V ELI, heat 7731). In-process dimensional checks per sampling plan. Final inspection per INS-CS-4036. Passivation and cleaning validated process PV-014.
Labeling and identification
Label LBL-CS-4036 Rev C, UDI-DI (01)00812345000417, lot (10) and expiry (17) printed
Nonconformances and deviations
NCR-2291: 8 pieces scrapped for thread gauge fail. No other deviations.
Release
This is a starting point built from the typical content of a device history record, not legal advice. Your device master record, procedures and the regulation that applies to you (21 CFR Part 820 as amended, EU MDR, or other) define what your DHR must contain. Keep the completed record with the lot and retain it for the period your procedure requires.
Automate DHR assembly from your ERP
Optional: a short review of how lot, inspection and NCR data in your ERP could populate device history records.
Optional. The tool and every export work without this. No spam.
How to use this template
Enter the manufacturer, device, lot or serial number, work order and the device master record revision, then add quantities, dates, labeling, acceptance results and any nonconformances. Export to PDF or Word and complete the step table and signatures by hand or in your document system. One record covers one lot or serial number, so make a new one for every production order.
- Always reference the revision of the device master record used
- Record quantity made and quantity released separately
- Cite NCR and deviation numbers instead of describing them again
- Keep the label and UDI printed on the lot with the record
What the record has to show
Under the old FDA Quality System Regulation the DHR was defined in 21 CFR 820.184: dates of manufacture, quantity manufactured, quantity released, acceptance records, the primary identification label and any device identification and control numbers. ISO 13485 clause 7.5.1 asks for a record for each medical device or batch that provides traceability and identifies the amount manufactured and approved for distribution. Check which version of the rule applies to your market, because FDA moved to the Quality Management System Regulation that incorporates ISO 13485.
Worked example
A orthopedic screw lot of 500 pieces is built under work order WO-118204. Eight pieces fail a thread gauge check and are scrapped under an NCR, so 492 pieces are released. The DHR shows 500 made, 492 released, the NCR reference, the passivation process validation, the label revision and the three signatures. An auditor can pick the lot number and trace every claim back to a source record in minutes.
Common mistakes
The usual failures are a blank release signature, a quantity released that does not match the shipment, a missing reference to the DMR revision, and records that say pass without the measured value. Paper DHRs also grow slowly because people attach loose inspection sheets; list every attachment by document number so nothing gets orphaned. In an ERP, the work order, lot and inspection results often already exist and can feed the record automatically.
Frequently Asked Questions
What is a device history record?
It is the record of how one batch, lot or unit of a medical device was manufactured and accepted. It shows dates, quantities, what was released, acceptance results and labeling, and proves the device was built to its device master record.
Is a DHR the same as a batch record?
In practice the terms overlap. Batch record is common in pharma and general manufacturing. DHR is the medical device term, and it carries device-specific content such as UDI, labeling and release for distribution.
How long must a DHR be retained?
Retention is set by regulation and your procedure. A common rule is the expected life of the device but not less than two years from release, and EU MDR sets its own periods. Confirm with your regulatory affairs lead for each market.
Can a DHR be electronic?
Yes. Electronic records are accepted if the system is validated, access controlled and audit trailed. For FDA this means meeting 21 CFR Part 11 expectations where they apply. Many manufacturers build the DHR from MES and ERP data.
If your lot, inspection and nonconformance data already sit in SAP, Infor, Epicor or NetSuite, Netray can help assemble the DHR from that data on your own infrastructure, with a human approving release.
Related Tools
ISO 13485 Internal Audit Checklist
A clause-organized checklist for auditing a medical device quality management system against ISO 13485:2016, with critical items flagged.
Quality & InspectionProcess Validation IQ OQ PQ Template
Fill in process, equipment and acceptance details and export an IQ OQ PQ protocol outline with test tables and approval signatures.
Quality & InspectionSterilization Load Record Template
A load record for sterilization cycles listing load contents, cycle parameters, indicator results and release decision, with signatures.
Compliance & ContractsUDI Label Data Field Reference
A searchable table of UDI label elements: device identifier, production identifier, GS1 application identifiers, formats and label notes.
More Quality & Inspection tools
See all- CAPA Corrective and Preventive Action Form Template
- Medical Device Complaint Handling Form Template
- ISO 14971 Risk Management Worksheet
- Medical Device Design Verification Protocol Template
- Medical Device Supplier Evaluation Scoring Worksheet
- Medical Device Cleanroom Environmental Monitoring Log
- Medical Device Accelerated Aging Calculator (ASTM F1980)
- Medical Device Success Run Validation Sample Size Calculator
- Sterilization D-Value and SAL Log Reduction Calculator
Keep exploring
Free tools
- Device History Record Review and Lot Release ChecklistA pre-release checklist for the person who signs off a device lot: verifies identification, quantities, materials, process records, acceptance activities, sterilization, labeling and open deviations.
- Design History File Index TemplateAn editable index of the records that make up a medical device design history file, with status, owner and review date for each document.
- Medical Device ERP Fit AssessmentScore how well your current or shortlisted ERP supports medical device manufacturing requirements including DHR generation, lot traceability, Part 11 controls, CAPA, and UDI submission.
Guides
- Medical Device ERP: What ERP for Medical Device Manufacturers Must DoMedical device ERP explained: what ERP for medical device manufacturers must do for DHR, lot and UDI traceability, Part 11, QMSR and ISO 13485, and how to choose.
- Electronic Device History Record (DHR): Moving Off Paper TravelersHow a device contract manufacturer can replace paper travelers with an electronic device history record: contents, review by exception, Part 11, rollout.
- Using AI to Review Device History Records Before Lot ReleaseHow a medical device contract manufacturer can use private AI to pre-check device history records for missing entries, cert mismatches and out-of-spec data.
AI on your ERP
- AI on Infor SyteLine for Medical Device Manufacturers: Genealogy, DHR and Audit EvidencePrivate AI on Infor SyteLine for medical device makers: lot and serial genealogy, DHR assembly, UDI and QMSR evidence, with human approval on every write.
- NetSuite AI for Medical Device Manufacturers: Traceability, DHR Context and QMSR ReadinessAI on NetSuite for medical device makers: UDI, lot and serial trace, device history record questions and CAPA context, run privately, read-only by default.