CAPA Form Template (Corrective and Preventive Action)
A CAPA turns a problem into a controlled change: investigate, fix the cause, check the fix worked. This form template guides the record from source and risk through root cause, action plan, effectiveness check and approvals, and exports for your quality system.
Fill in
CAPA Corrective and Preventive Action Form Template
Corrective and Preventive Action (CAPA) Form
Company: Acme Precision Ltd CAPA number: CAPA-2026-019 Date opened: 2026-10-20 Owner: R. Nakamura, Quality Engineering
Initiation
| Field | Detail |
|---|---|
| Source | NCR trend |
| Action type | Corrective |
| Risk level | Medium |
Problem statement
Seven NCRs in 90 days for burrs on cross drilled holes in PN-31007, all from the same machining cell. Three were found at final inspection.
Correction (containment)
Affected lots reworked with a deburring step and 100 percent inspected. Two lots scrapped.
Root cause investigation
5 whys and fishbone. Drill exit burr forms because the peck cycle was removed in a program revision to cut cycle time. No change review covered burr risk.
Action plan
Restore the peck cycle in the program. Add burr check to the change review checklist. Update PFMEA line for drill exit burr.
Action tracking
| Action | Owner | Due date | Completed |
|---|---|---|---|
Effectiveness verification
No burr NCR on PN-31007 for 3 months and 10 consecutive lots. Review by quality on 2027-01-20.
Result of verification: ____________________ Effective: Yes / No (if No, reopen or open a new CAPA)
Approvals
A starting point, not a controlled form. Align it with your CAPA procedure, risk method and regulatory needs such as ISO 13485 clause 8.5.2 and 8.5.3 or 21 CFR 820 requirements where they apply.
Connect CAPA data to your ERP
Optional: we can look at how your ERP records quality events and suggest a way to feed CAPA trending from it.
Optional. The tool and every export work without this. No spam.
How to complete the CAPA form
Begin with the source and a risk rating, since they decide how much investigation the issue deserves. Write a problem statement with counts, dates and the process involved. Record the correction separately from the corrective action: correction fixes this product, corrective action removes the cause. Name the root cause method and conclusion, then list actions with owners and due dates. Finally write the effectiveness criteria before work starts, with a review date. Writing the pass criteria upfront stops the CAPA from closing on opinion.
- Separate correction from corrective action.
- Rate risk to scale the depth of investigation.
- Give every action an owner and date.
- Define effectiveness criteria in advance.
Corrective versus preventive action
Corrective action addresses a nonconformity that has already happened, so it does not recur. Preventive action addresses a potential nonconformity found through trends, risk analysis or near misses. ISO 9001:2015 moved to a risk based approach and no longer has a separate preventive action clause, but many sites, and ISO 13485 and FDA regulated organisations, still keep CAPA as a combined process. Use the action type field to keep both visible in reporting.
Common mistakes
Frequent weaknesses are closing the CAPA when actions are complete rather than when they are shown to work, naming retraining as the only action, and opening a CAPA for every single defect until the system is buried. Use trending and risk to decide what deserves a CAPA. Also avoid vague due dates and shared ownership. One person should own the CAPA, even if many people own tasks. Link the CAPA to the NCRs, complaints or audit findings that triggered it.
Frequently Asked Questions
When should I open a CAPA instead of just an NCR?
Open a CAPA when the issue is repeated, systemic, customer visible, safety or regulatory relevant, or when the cause is unknown. A one off defect with an obvious cause and a completed correction may need only an NCR.
How is effectiveness verified?
By evidence over a defined period: no recurrence, improved capability, audit results or reduced complaint rate. Set the metric and period when the plan is written, and have someone independent of the action owner review it.
How long should a CAPA stay open?
It depends on risk. Many procedures aim for root cause within 30 days and closure within 90 to 180 days, with longer allowed for effectiveness monitoring. Set the targets in your own procedure and track overdue items.
Is this form acceptable for FDA or ISO 13485 audits?
It captures the usual elements, but acceptance depends on your documented procedure and records being followed. Use it as a base, adapt it to your controlled form format and confirm requirements with your regulatory lead.
If your CAPAs sit in spreadsheets, we can help connect them to ERP nonconformance and supplier data so trends are visible.
Related Tools
CAPA Log and Tracker Worksheet
Editable CAPA register with target days, days open and overdue days calculated for each row, exportable to Excel.
Quality & InspectionCAPA Effectiveness Verification Checklist
Checklist for proving a CAPA worked before closure, covering evidence, recurrence, documents, training and risk.
Quality & InspectionNCR Nonconformance Report Template
Fill-in nonconformance report with containment, disposition and approval lines that exports to PDF, Word or Excel.
Quality & Inspection8D Problem Solving Report Template
Eight disciplines report template covering D0 to D8, ready to send to a customer or supplier as PDF, Word or Excel.
Quality & Inspection5 Whys Root Cause Analysis Template
Document a problem, the chain of five whys, the root cause and countermeasures in a format you can print or share.
More Quality & Inspection tools
See all- Device History Record (DHR) Template
- ISO 13485 Internal Audit Checklist
- Process Validation IQ OQ PQ Template
- Medical Device Complaint Handling Form Template
- ISO 14971 Risk Management Worksheet
- Sterilization Load Record Template
- Medical Device Design Verification Protocol Template
- Medical Device Supplier Evaluation Scoring Worksheet
- Medical Device Cleanroom Environmental Monitoring Log
Keep exploring
Free tools
- CAPA Action Tracker WorksheetTrack every open corrective and preventive action with owner, due date, days open and status, and see how many are overdue or ageing.
- Corrective Action Form TemplateA fill-in corrective action form with a pre-filled manufacturing example. Edit the fields, then export a clean PDF, Word or Excel copy.
- Corrective Action Effectiveness Verification TemplateA record that proves a corrective action worked: the metric, the monitoring period, the pass criteria, the data and the closure decision.
ERP fixes and how-tos
- How to Link a CAPA to ERP Lots and Serial Numbers for Containment and EffectivenessUse ERP lot and serial genealogy to scope containment for a CAPA, record affected jobs and shipments, and verify effectiveness with real data instead of opinion.
- How to Complete an Operation in Epicor Kinetic (Plus Time Entry and Corrective Action)Complete an operation in Epicor Kinetic through MES or Labor Entry, plus time and expense entry, customer managed inventory and corrective action, with what to check first.
Guides
- How to Manage Corrective Actions and CAPA in SyteLineComplete guide to managing CAPA (Corrective and Preventive Actions) in Infor SyteLine. Configure root cause analysis workflows, action tracking, effectiveness verification, and 8D problem-solving integration.
- SyteLine Corrective Action Request (CAR/CAPA) Configuration GuideConfigure SyteLine corrective and preventive action workflows. Set up CAR/CAPA tracking, root cause analysis, and effectiveness verification in CloudSuite Industrial.
AI on your ERP
- AI for NCR, CAPA, and 8D Drafting in AS9100 and ISO 9001 Quality SystemsAI drafts NCR, CAPA, and 8D reports from ERP quality data for engineer review, cutting drafting time under AS9100 and ISO 9001 without changing sign-off.
- AI for ComplianceQuest: Connecting QMS Records to ERP, Suppliers and Shop FloorPrivate AI for ComplianceQuest QMS: CAPA, supplier quality and audits read via Salesforce APIs and joined to ERP data, with human approval and audit trails.