Sterilization Load Record Template for Medical Device Lots
A sterilization load record shows that a specific load went through a validated cycle and met release criteria. This template captures the load contents, cycle data, indicator results and disposition in one document.
Fill in
Sterilization Load Record Template
Sterilization Load Record SL-2610-044
Facility: Meridian Orthopedics Inc., Sterilization Suite Method: Moist heat (steam) Sterilizer: Autoclave AC-02 Validated cycle: Cycle 3, 121 C for 30 min, validation PV-2025-031 Run date: 2026-10-16
Load contents
Lot L2610-0417, 492 pouches Lot L2610-0422, 300 pouches
Load configuration
| Item | Requirement | Result |
|---|---|---|
| Load pattern matches validated pattern | Yes | |
| Packaging intact and labeled | Yes | |
| Chemical indicator on each tray or pallet | Changed color | |
| Product in qualified quantity range | Yes |
Cycle record
Peak temperature 122.4 C, exposure time 30 min, pressure within limits, no alarms. Chart recorder printout attached.
Indicators
BI lot 5518, 3 in load at worst case positions plus 1 positive control
Indicator results
| Indicator | Location | Result | Read by | Date |
|---|---|---|---|---|
| Biological indicator 1 | ||||
| Biological indicator 2 | ||||
| Positive control | ||||
| Chemical indicator |
Disposition
Load disposition: Hold pending BI result
Approvals
Starting point only, not legal advice. Tailor fields to your validated process and to the standards that apply to it, such as ISO 11135 for ethylene oxide, ISO 17665 for moist heat or ISO 11137 for radiation. Parameters must match the validated cycle.
Link sterilization loads to lot status
Optional: a short review of tying load results to lot release status in your ERP or MES.
Optional. The tool and every export work without this. No spam.
How to use this template
Enter the load number, method, sterilizer and validated cycle, list every product lot in the load, and note the biological indicator details. After the cycle, paste or summarize the recorded parameters and attach the chart or printout. Export to PDF or Word, fill in the indicator results and sign. Do not release product until every release criterion in the validated procedure is met.
- Match load pattern to the validated configuration
- List every lot so a failure can be traced back
- Attach original cycle printouts or electronic data
- Record who read the biological indicators and when
The standards behind the record
ISO 13485 clause 7.5.7 requires validation of sterilization processes and records of the results. Each method has its own standard: ISO 11135 for ethylene oxide, ISO 17665 for moist heat, and the ISO 11137 series for radiation. These describe validation, routine control and release. The load record is the routine control evidence that a given load ran within the validated limits and that the product can be released.
Release and indicators
Product release depends on your validated approach. Many ethylene oxide and steam loads wait for biological indicator incubation results, while some processes use parametric release based on cycle data once the process is shown to be reliable. Chemical indicators show exposure but do not prove sterility. A positive biological indicator in the load triggers a nonconformance and an investigation, and the load is held or rejected.
Common mistakes
Common problems are loads built differently from the validated pattern, missing lot numbers on the record, indicators read late or not signed, and release before incubation finishes. Another is ignoring changes in packaging or product density that may require requalification. Keep the sterilizer calibration and maintenance current, because a drift in sensors can invalidate every load run since the last good check.
Frequently Asked Questions
What must a sterilization load record contain?
At minimum the load identity, product lots, method and validated cycle, recorded cycle parameters, indicator results, deviations, disposition and signatures. Your validated procedure may add items such as chamber conditions or pre-conditioning data.
Can product be released before the biological indicator result?
Only if your validated process allows it, for example parametric release. Otherwise the load is held until the biological indicators incubate and read negative with a valid positive control.
Is a chemical indicator enough?
No. It shows the item was exposed to a process condition, not that sterility was achieved. Biological indicators and recorded cycle parameters provide the main evidence for release.
When must a sterilization process be requalified?
Periodically per your procedure, and after changes to equipment, load configuration, packaging, product or bioburden. Each change needs a documented assessment that decides how much requalification is needed.
If lots, work orders and release status live in your ERP or MES, Netray can help link sterilization loads to lot status on your own infrastructure, with a person approving each release.
Related Tools
Process Validation IQ OQ PQ Template
Fill in process, equipment and acceptance details and export an IQ OQ PQ protocol outline with test tables and approval signatures.
Quality & InspectionDevice History Record (DHR) Template
Build a device history record for one lot or serial number: quantities, dates, labeling, acceptance and release sign-off. Exports to PDF or Word.
Quality & InspectionISO 13485 Internal Audit Checklist
A clause-organized checklist for auditing a medical device quality management system against ISO 13485:2016, with critical items flagged.
Quality & InspectionISO 14971 Risk Management Worksheet
An editable hazard analysis table that scores initial and residual risk from severity and probability and exports to Excel.
More Quality & Inspection tools
See all- CAPA Corrective and Preventive Action Form Template
- Medical Device Complaint Handling Form Template
- Medical Device Design Verification Protocol Template
- Medical Device Supplier Evaluation Scoring Worksheet
- Medical Device Cleanroom Environmental Monitoring Log
- Medical Device Accelerated Aging Calculator (ASTM F1980)
- Medical Device Success Run Validation Sample Size Calculator
- Sterilization D-Value and SAL Log Reduction Calculator
- ASTM F1980 Accelerated Aging Time Calculator
Keep exploring
Free tools
- Device History Record Review and Lot Release ChecklistA pre-release checklist for the person who signs off a device lot: verifies identification, quantities, materials, process records, acceptance activities, sterilization, labeling and open deviations.
- Sterilization D-Value and SAL Log Reduction CalculatorCalculates log reduction, resulting sterility assurance level exponent and minimum exposure time from bioburden and D-value.
- Medical Device Lot Reconciliation and Genealogy WorksheetRow-by-row lot reconciliation with yield and unaccounted-unit columns, plus component lot and sterilization lot links for genealogy. Exports to Excel.
Guides
- How to Quote Medical Device Contract Manufacturing WorkHow medical device contract manufacturers build a quote: materials with certs, cleanroom labor, validation, inspection, sterilization handoffs and NRE.
- Medical Device ERP: What ERP for Medical Device Manufacturers Must DoMedical device ERP explained: what ERP for medical device manufacturers must do for DHR, lot and UDI traceability, Part 11, QMSR and ISO 13485, and how to choose.
- Using AI to Review Device History Records Before Lot ReleaseHow a medical device contract manufacturer can use private AI to pre-check device history records for missing entries, cert mismatches and out-of-spec data.
AI on your ERP
- AI on Infor SyteLine for Medical Device Manufacturers: Genealogy, DHR and Audit EvidencePrivate AI on Infor SyteLine for medical device makers: lot and serial genealogy, DHR assembly, UDI and QMSR evidence, with human approval on every write.
- AI on SAP Business One for Medical Device Manufacturers: Traceability and Records Retrieval Without Touching the Validated StatePrivate AI on SAP Business One for medical device manufacturers: UDI, lot and serial traceability, supplier records, DHR retrieval. Read-only, on-prem, QMSR-aware.
Manufacturing hubs
- Medical Device Manufacturing in Minneapolis-St. PaulMedical device manufacturing in Minneapolis-St. Paul: ecosystem, FDA and ISO 13485 requirements, and ERP, quoting and document problems contract makers face.
- MDMA, AdvaMed and medical device manufacturing: regulation, ERP and AI realitiesMDMA and AdvaMed medical device manufacturing: FDA QMSR, ISO 13485, UDI and EU MDR, plus the ERP, traceability and private AI issues device makers face.