Quality & InspectionFree templatePDF, Excel, Word exportPhotonics

Photonics Nonconformance Report (NCR) Template

Optical defects are often only visible with instruments, so a useful NCR records the measurement as well as the symptom. This template captures the defect, evidence, containment and disposition in one document.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Photonics Nonconformance Report (NCR) Template

Nonconformance Report

Company: Aperture Photonics Ltd NCR no: NCR-2026-0187 Date: 2026-10-20 Part: FLT-BP-532 Lot or serial: LOT-24-1203 Quantity affected: 18 Detected at: Incoming inspection

Description of Nonconformance

Center wavelength measured at 536 nm against a 532 nm +/- 2 nm requirement. Observed on 18 of 32 sampled pieces.

Measurements

CharacteristicRequirementMeasuredEquipment ID

Containment

Lot quarantined in the hold cage. Remaining stock tagged. Supplier notified.

Disposition

Disposition: Return to vendor

Root Cause and Corrective Action

Under investigation by supplier. Suspected coating deposition drift.

Corrective action reference: ____________

Approvals

Raised by / Date
Quality engineer / Date
Engineering / Date
Material review board / Date

A starting point to adapt to your quality system. Disposition authority, MRB composition and customer notification rules vary by contract and standard such as AS9100 or ISO 9001.

Move NCRs into your ERP

Optional review of how nonconformance records could be captured and trended in your ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to complete the NCR

State the requirement and the actual result in measurable terms such as center wavelength, transmission or wavefront error. Record quantity affected and where the defect was detected. Contain suspect stock before debating the cause. Choose a disposition, route for signature, and link the NCR number to the receipt, work order or lot in your ERP.

  • Quote the requirement and the measurement
  • Contain first, investigate second
  • Identify the instrument and calibration ID
  • Link to lot and work order

Typical photonics nonconformances

Frequent causes include coating shifts, scratch and dig excursions, contamination, alignment drift, adhesive voids and laser power outside tolerance. The measurement record helps separate a supplier issue from an internal process issue and supports a supplier corrective action request when needed.

Closing the loop

An NCR that ends at disposition solves one lot. Link it to a corrective action when the cause is systemic, and review recurring defect types monthly. Many ERPs have a quality notification or nonconformance object that can hold these records so trending is automatic.

Frequently Asked Questions

Who approves the disposition?

That depends on your procedure. Many organizations use a material review board with quality and engineering, and customer approval is required for use as is or repair on some contracts.

Is this form AS9100 compliant?

It contains the elements usually expected: identification, description, containment, disposition and approvals. Compliance depends on how your quality system uses it, so check against your own procedures.

What is the difference between an NCR and a CAPA?

An NCR records and dispositions a specific nonconformance. A CAPA addresses the underlying cause to prevent recurrence. One CAPA can cover several NCRs.

Can I use it for supplier returns?

Yes. Select Return to vendor, attach the measurement data, and send a copy to the supplier with your corrective action request.

If NCRs live in spreadsheets and email, Netray can help bring them into your ERP quality module and trend them automatically.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP