Reaction Conversion, Yield and Selectivity Batch Log (Excel)
Yield alone does not tell you whether a poor batch lost material to unreacted feed or to side products. This worksheet logs each batch and computes conversion, yield and selectivity side by side, with totals and Excel export.
| Batch number | Date | Limiting reactant charged (kmol) | Reactant left at end (kmol) | Desired product formed (kmol) | Mol product per mol reactant | Conversion | Yield | Selectivity | |
|---|---|---|---|---|---|---|---|---|---|
95% | 85% | 89.5% | |||||||
92.5% | 81.7% | 88.3% | |||||||
95.8% | 88.3% | 92.2% | |||||||
87.8% | 77.4% | 88.1% | |||||||
95% | 86.7% | 91.2% |
Yield equals conversion multiplied by selectivity. Use consistent units (kmol or kg-moles) for all three amounts. Measure unreacted reactant by sampling or in-process assay, and product by assay of the final mass.
Trend batch yield from your ERP data
Optional: we can review how yield and variance data are pulled from production orders.
Optional. The tool and every export work without this. No spam.
How to use it
Add one row per batch. Enter the limiting reactant charged, the amount still unreacted at the end, the desired product formed and the stoichiometric ratio from the balanced equation. The three percentage columns calculate themselves, and the totals show averages across the log. Replace the sample rows with your own and export to Excel or PDF for the batch review.
The definitions
Conversion is the fraction of limiting reactant consumed: (fed minus unreacted) divided by fed. Yield is product formed divided by the theoretical maximum. Selectivity is product formed divided by the product that would be obtained if all consumed reactant went to the desired product. So yield = conversion x selectivity.
- Low conversion points to kinetics, time, temperature or catalyst
- Low selectivity points to side reactions or poor mixing
- Low yield with high conversion and selectivity suggests losses in work-up
- Use moles, not mass, unless molar masses match
Common mistakes
Mixing mass and mole bases is the most common error and produces yields over 100 percent. Another is using the wrong limiting reactant. If a row shows selectivity above 100 percent, check the stoichiometric coefficient and measurement units before assuming the chemistry is better than the equation allows.
- Account for recycled streams and heels separately
- Record analytical method and date for traceability
- Compare batches with the same raw material lot where possible
- Trend the averages monthly rather than judging one batch
Frequently Asked Questions
What is the difference between yield and selectivity?
Yield compares product to the theoretical maximum from the full charge. Selectivity compares product to what the reactant that actually reacted could give. A batch can have good selectivity and poor yield if conversion is low.
Why does the worksheet show zero?
If a divisor is zero, for example the charge is blank or all reactant remains unreacted, the formula returns zero rather than an error. Fill in the charge and unreacted values.
Can I use kilograms?
Only if all columns use the same basis and the stoichiometric ratio is expressed in mass. For most chemistry, moles are cleaner. Convert with molar mass before entering the values.
What is a good yield?
It depends on the chemistry and process stage. Simple reactions may exceed 95 percent, multi-step fine chemical routes much less. Compare against your validated process targets and historical control limits.
If batch results are stored in your ERP production order history, Netray can help bring yield data into one trend view. Ask us for a review.
Related Tools
Weight Percent to Molarity Calculator
Convert a w/w percent assay into molarity, molality and the mass of active chemical in a volume.
Safety & WorkforceChemical Reactor Pre-Charge Checklist
A pre-start checklist an operator can walk through before charging a batch reactor, with critical items flagged.
Safety & WorkforceChemical Reactor Adiabatic Temperature Rise Calculator
Calculate how far a reactor mass heats up if cooling fails, and how much margin remains to the boiling point or decomposition onset.
Electronics ManufacturingYield Improvement Value Calculator
Put a dollar value on first pass yield improvement: failures avoided, rework and scrap savings, and the worth of each yield point.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- Chemical Batch Record TemplateA fill-in batch manufacturing record with raw material charges, in-process checks, yield reconciliation and operator and QA signatures.
- Chemical Batch Yield and Mass Balance CalculatorCalculates theoretical yield from the limiting reagent, actual yield percent corrected for purity, and the unaccounted mass in a batch.
- Chemical Batch Manufacturing Record TemplateA fill-in batch record with raw material charges, process steps, in-process checks, yield and review signatures. Exports to PDF, Word or Excel.
ERP fixes and how-tos
- JD Edwards table conversion: how it works and how to run oneWhat a JD Edwards table conversion does to a JDE table's structure and data, when it runs in a package build, and how to run or design one manually.
- MYOB Acumatica Manufacturing: Batch Size in BOMs and Production OrdersHow batch size works in Acumatica and MYOB Acumatica Manufacturing: BOM quantities, scaling to production orders, yield and scrap, and common mistakes.
- Conversion Factor Session in Infor LN: Setup and Common ErrorsHow unit conversion factors work in Infor LN: general factors versus item-specific factors, where to maintain them and how to fix missing conversion factor errors.
Guides
- AI-Powered Chemical Manufacturing with Infor M3Optimize Infor M3 for chemical manufacturing with AI. Batch management, formula optimization, regulatory compliance, and yield improvement.
- Process Manufacturing ERP Requirements GuideDefine ERP requirements for process manufacturing. Recipe management, batch processing, quality control, regulatory compliance, and yield optimization.
- Infor M3 Batch Process Manufacturing Configuration GuideConfigure Infor M3 for batch process manufacturing with recipe management, batch sizing, co-product handling, yield tracking, and process order execution.
AI on your ERP
- AI for ERP in Chemicals and Batch Process ManufacturingAI on the ERP of a chemicals or batch process plant: formula and yield analysis, SDS and REACH lookups, lot traceability. Private, read-only, on-prem option.
- Infor M3 AI for Chemical Manufacturers: Formulas, Batches and Safety DataPrivate AI on Infor M3 for chemicals: formula and potency, batch genealogy, SDS and REACH data, hazardous goods, co-products and yield, on-prem or private.