SAPFree referencePDF, Excel, Word exportSAP ECC / S/4HANAAll SAP ECC 6.0 tools

SAP Pricing Condition Types List (Standard SD Conditions)

Pricing in SAP SD is built from condition types arranged in a pricing procedure. This list gives the delivered standard condition types you meet in almost every implementation, with a plain description of how each is typically used.

Download:
Condition typeDescriptionGroupTypical use
PR00
Price
Price
Main list price per unit, usually by material or customer and material
K004
Material discount
Discount
Discount by material
K005
Customer/Material discount
Discount
Discount for a customer and material combination
K007
Customer discount
Discount
Discount by customer
K020
Price group discount
Discount
Discount by customer price group
RA00
% Discount from gross
Discount
Manual or automatic percentage discount against gross value
RB00
Discount (value)
Discount
Absolute discount value
KF00
Freight
Freight
Freight charge by weight or shipping condition
VPRS
Cost
Cost
Standard or moving average cost for margin analysis, statistical
SKTO
Cash discount
Cash discount
Cash discount on net value from payment terms, statistical
MWST
Output tax
Tax
Output tax determined through tax condition records
UTXJ
Tax jurisdiction code (US)
Tax
US sales and use tax by jurisdiction

These are SAP delivered standard names. Your system may have renamed, copied or removed them, so confirm in V/06 and the pricing procedure in V/08. Behaviour (condition class, calculation type, statistical flag) is set in the condition type, not by the name.

Pricing exceptions review

Optional: a short call about finding orders with missing or overridden prices in your SAP data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to read condition types

A condition type is a building block with a four character key, such as PR00 for price. It is assigned an access sequence that tells SAP which condition tables to search, and it appears as a step in the pricing procedure with a counter, a from and to reference and, often, an account key for revenue posting. Use the group column here to scan for prices, discounts, freight, cost, cash discount and tax.

Key checks when a price is wrong

Open the order, go to item conditions and display the analysis. Check that the condition type exists in the pricing procedure for the combination of sales area, customer pricing procedure and document pricing procedure, that a valid record exists for the date, and that no requirement routine or exclusion indicator is stopping it. Many pricing issues come from the validity date or from the document pricing procedure, not from the missing record.

  • Check the pricing date and condition record validity
  • Check access sequence and condition table fields
  • Check the condition exclusion group
  • Check the requirement routine in the procedure step

Statistical and cost conditions

VPRS and SKTO are typically statistical, meaning they show a value for information and margin but do not change the net value in the same way a price or discount does. Do not add a statistical condition to a subtotal that feeds revenue posting unless you know exactly what you want.

Frequently Asked Questions

What is condition type PR00 in SAP?

PR00 is the standard price condition type in SAP SD. It carries the unit price for a material, normally maintained with VK11 and found by an access sequence. Most delivered pricing procedures use PR00 as the first price step.

What is the difference between a condition type and an access sequence?

The condition type defines how a price element behaves, such as price or discount. The access sequence defines the order in which condition tables are searched to find a valid record for that condition type. One access sequence can serve many condition types.

Where do I maintain condition types?

Use V/06 to maintain condition types, V/07 for access sequences and V/08 for pricing procedures. Condition records are then maintained with VK11, VK12 and VK13 by the pricing or sales team.

What does a statistical condition do?

A statistical condition is shown on the document for information, for example cost VPRS for margin, but it does not change the net value that is billed or posted. The statistical flag is set on the pricing procedure step.

If pricing analysis across thousands of orders is slow, Netray can help build a read-only pricing exceptions view over your SAP data. Ask for a review.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations