SAP SD Configuration Transactions (IMG T-Codes) Reference
SD configuration jumps between many IMG nodes, and consultants memorize the transaction codes that jump straight to them. This reference lists the customizing transactions you need most for documents, pricing, copy control, delivery, billing and credit.
| T-code | What it configures | Area | Main table |
|---|---|---|---|
VOV8 | Define sales document types | Sales document | TVAK |
OVAZ | Assign sales area to sales document type | Sales document | TVAKZ |
VOV7 | Define item categories | Sales document | TVAP |
VOV4 | Assign item categories (item category determination) | Sales document | T184 |
VOV6 | Define schedule line categories | Sales document | TVEP |
VOPA | Maintain partner determination procedures | Partners | TPAR and related |
V/06 | Maintain condition types | Pricing | T685 |
V/07 | Maintain access sequences | Pricing | T682 |
V/08 | Maintain pricing procedures | Pricing | T683 |
OVKK | Pricing procedure determination | Pricing | T683V |
VKOA | Revenue account determination | Account assignment | Condition tables of KOFI |
VOFM | Requirements, formulas and copy routines | Routines | TFRM |
VTAA | Copy control: sales document to sales document | Copy control | TVCPA |
VTLA | Copy control: sales document to delivery | Copy control | TVCPL |
VTFL | Copy control: delivery to billing document | Copy control | TVCPF |
VTFA | Copy control: sales document to billing document | Copy control | TVCPF |
OVLK | Define delivery types | Delivery | TVLK |
OVL2 | Define shipping points | Delivery | TVST |
VOFA | Define billing types | Billing | TVFK |
OB45 | Define credit control areas | Credit | T014 |
OVA8 | Automatic credit control | Credit | T691F |
NACE | Output determination for applications | Output | T685 and output tables |
Table names are the main table behind the transaction and can differ by release, so confirm in SE11 on your system. Always change customizing in the development client and transport it.
SD configuration inventory
Optional: a short call about extracting your SD customizing into a reviewed document.
Optional. The tool and every export work without this. No spam.
How to use the reference
Search for the setting you want to change, such as item category or copy control, and the table shows the transaction and the area. Open the code from the SAP command field, change the setting in the development client and save it to a transport request. Export the filtered rows to Excel for a configuration inventory or a fit gap workshop pack.
The order to configure in
Configuration has dependencies, so work in a sensible order. Define org structure and assignments first, then partner and document types, then item and schedule line categories and their determination, then pricing, then delivery and billing types, then copy control, and finally output and credit. Copy control is where most late defects appear, because every pair of source and target types needs a row for both header and item levels.
- Org structure and sales area assignments
- Sales document types and item categories
- Pricing: conditions, access sequences, procedures
- Delivery and billing types
- Copy control, output, credit
Common mistakes
Changing standard document types in place makes upgrades painful, so copy to the Z or Y namespace instead. Forgetting to assign the new type to the sales area in OVAZ makes it invisible at order entry. Forgetting a copy control entry gives the message that no follow-up document is possible. Change one thing at a time and test the full flow from order to billing.
Frequently Asked Questions
Where do I define sales document types in SAP?
Use transaction VOV8 to define sales document types, stored in table TVAK. After defining a type, assign it to the sales area in OVAZ so users can select it at order entry. Always copy a standard type rather than overwriting it.
Which transaction is for pricing procedures?
V/08 maintains pricing procedures. Their determination by sales area, document pricing procedure and customer pricing procedure is in OVKK. Condition types are in V/06 and access sequences in V/07.
What is copy control in SAP SD?
Copy control defines how data and quantities pass from one document to the next, such as order to delivery in VTLA or delivery to invoice in VTFL. It also holds the routines that control copying, and missing rows are a frequent go-live defect.
Why is my new order type not available in VA01?
The most common reason is that the type is not assigned to the sales area in OVAZ. Also check that it exists in the same client, that the authorization allows the type and that item category determination is set up for it.
If you want a documented inventory of your SD configuration read from the system, Netray can help produce one with a read-only extraction. Ask for a review.
Related Tools
SAP SD Pricing Condition Types Reference (PR00, K004, MWST)
Look up standard SAP SD condition types and what each is normally used for in a pricing procedure.
SAPSAP SD Transaction Codes Reference
A searchable list of common SAP sales and distribution transaction codes, grouped by process area, for daily use and onboarding.
SAPSAP SD Go-Live and Cutover Readiness Checklist
A readiness checklist for sales and distribution cutover: data, configuration, interfaces, testing and hypercare.
SAPSAP SD Tables Reference (VBAK, VBAP, LIKP, VBRK and More)
Lookup of the main SAP SD tables with their key fields and what changed in S/4HANA. Search, then export to Excel or PDF.
More SAP tools
See all- SAP Sales Document Types Reference
- SAP Pricing Procedure Design Worksheet
- SAP Item Category Determination Reference
- SAP Delivery Block Reasons Template
- SAP Credit Management Checklist
- SAP Output Determination Checklist
- SAP Billing Types Reference
- SAP Incompletion Log Checklist
- SAP Order-to-Cash (SD) Health Assessment
Keep exploring
Free tools
- SAP SD Transaction Codes ReferenceA searchable list of common SAP sales and distribution transaction codes, grouped by process area, for daily use and onboarding.
- SAP SD Go-Live and Cutover Readiness ChecklistA readiness checklist for sales and distribution cutover: data, configuration, interfaces, testing and hypercare.
- SAP Sales Document Types ReferenceA searchable list of the standard SAP SD sales document types, with the SD document category and the way each one is normally used in a design.
ERP fixes and how-tos
- SAP PP End to End Configuration: Steps, IMG Paths and Process FlowSAP PP end to end configuration in order: organizational structure, master data, MRP, order types, confirmation, costing and settlement, with IMG paths and tcodes.
- SAP Error: Define QM Procurement Key (How to Fix It)Fix the SAP QM procurement key error: define the key in the QM in Procurement IMG, activate QM at plant level, and set QM proc. active and the control key in the material master.
- SAP Sales Order Incompletion Log in VA01/VA02: Fix and ConfigureSales order stuck incomplete? Read the VA02 incompletion log, find missing fields, and configure incompletion procedures and status groups in SD customizing.